|
| 1 | Cleaning shurb jungle including uprooting stumps & small bushes and removal of rubbish up to a distance of 50m outside the periphery of the area |
| 2 | Excavation, loading , unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC within an initial lead of 1 km. from the place of excavation complete. |
| 3 | Filling foundation and plinth with filling sand including watering and ramming with cost, carriage, royalty etc. complete as per the direction of the Engineer-in-charge. |
| 4 | Cement concrete M15 grade with crushed granite coarse aggregate of 20 mm down graded mixed in concrete mixture including cost of all materials ,machineries and labouer with all lead for materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground level etc. complete in all respect to proper slope & level with all cost, conveyance, royalty & other taes of all materials complete in all respect as directed by the Engineer-in-charge. |
| 5 | Cement concrete M20 grade with crushed granite coarse aggregate of 20 mm down graded mixed in concrete mixture including cost of all materials ,machineries and labouer with all lead for materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground level etc. complete in all respect to proper slope & level with all cost, conveyance, royalty & other taes of all materials complete in all respect as directed by the Engineer-in-charge. |
| 6 | Straightening, cutting, bending, binding and lying the grills as per approved design & placing in position including cost, conveyance of M.S. Rod & binding wire 18 to 20 gauge complete as directed by the Engineer-in-charge. (Weight of binding wire is not included for payment) |
| 7 | Providing rigid shuttering with box type steel shuttering plates with keys for intermediate construction joints in rafts of weirs, barrages and dam blocks including cost of all materials, labour, T & P. etc. complete as per the direction of the Engineer-in-charge including removal of forms. |
| 8 | Providing weep holes in Brick masonary / plain / Reinforced Concrete aboutment, wingwall / Return wall with 50mm dia PVC pipe Sch. 80, extending through the full width of the structure with slope of 1 V : 20 H towards drawing face etc. complete as per drawing and technical specification. |
| 9 | Earth work in ordinary soil within 50m initial lead & 1.50m initial lift including rough dressing and breaking clods maximum 5 cm to 7cm and laying in layers not exceeding 0.30m in depth etc. complete as per the direction of the Engineer-in-charge. |
| 10 | Rough stone dry packing in approns and revetments with h.g. stones15 cm to 30 cm including cost, carriage & Royalty etc. complete as pre the direction of the Engineer-in-charge. |
| 11 | Excavation of any approved type soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 1KM. on properly prepare and scientifically approved surface including spreading and levelling the earth in 22.50Cm. laying to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in doms and dykes for all hights including construction, mainteance, watering and lighting of haul road and borrow area etc. complete as per the direction of Engineer in charage ( Measurement of the fill to be taken on the finished compacted section under OMC Condition),layers not exceeding 0.30m in depth including royalty of earth etc. complete as per the direction of the Engineer-in-charge. |
| 12 | Filling foundation and plinth with excavated earth including watering and ramming with cost, carriage, royality etc. complete as per direction of Engineer in- charage. (MECHANICAL MEANS) |
| 13 | Dismantling brick or stone masonry inlime or cement mortar under 3m.height including stacking the useful materials for reuse and removing the debries within 50m lead. |
| 14 | Dismentaling and removing cement concrete including stacking the useful materials for reuse & removing the debries within initial lead etc. |
| 15 | Rough stone dry packing in approns and revetments from the supply of Departmental stone etc.complete(Labour only) |
| 16 | Earth work in hard soil with initial lift including rough dressing & breaking clods to max.5cm.to 7cm. Size & laying in layers etc. complete. Please Enable Macros to View BoQ information |