|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. |
| 3 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge |
| 4 | Providing and laying plain cement concrete of proportion (1:4:8) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, taxes of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge. |
| 5 | Brick work with Flyash Bricks 25cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. |
| 6 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement.A ) GROUND FLOORa ) Columns Footing |
| 7 | b ) Plinth Beam |
| 8 | c ) Columns |
| 9 | d ) Lintel Bend |
| 10 | e ) Chajja |
| 11 | f ) Roof Slab |
| 12 | g ) Roof Beam |
| 13 | h) Stair Case |
| 14 | B) FIRST FLOORa) Column |
| 15 | b) Lintel |
| 16 | c) Chajja |
| 17 | e) Roof Slab |
| 18 | f) Roof Beam |
| 19 | C) SECOND FLOORa) Column |
| 20 | b) Lintel |
| 21 | c) Roof Beam |
| 22 | d) Roof Slab |
| 23 | Straightening, cutting, bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S. rods or tor confirming to I.S. 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C. works including cost, conveyance and taxes of M.S. rods or tor steel and binding wires of 18 to 20 gauge and cost of all labour etc.complete in all respect.A) GROUND FLOOR |
| 24 | B) FIRST FLOOR |
| 25 | C) SECOND FLOOR |
| 26 | Brick work with Flyash Bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Super Structure including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C.A) GROUND FLOOR |
| 27 | B) FIRST FLOOR |
| 28 | C) SECOND FLOOR |
| 29 | 12mm thick C.P.(1:6) on brick masonary to the smooth surface including watering, curing, cost, carriage, royalty of all materials, cost of all labour, etc complete as per the direction of E.I.C.A) GROUND FLOOR |
| 30 | B) FIRST FLOOR |
| 31 | C) SECOND FLOOR |
| 32 | 16mm thick C.P. (1:6) over brick masonary to the smooth surface including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C.A) GROUND FLOOR |
| 33 | B) FIRST FLOOR |
| 34 | C) SECOND FLOOR |
| 35 | 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment. in Ground FloorA) GROUND FLOOR |
| 36 | B ) FIRST FLOOR |
| 37 | C ) SECOND FLOOR |
| 38 | 12mm (1/2”) thick Cement Plaster in C.M. (1:4) with neat Cement Punning finished smooth to brick walls after raking out joints cleaning & finishing the plaster surface smooth including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges. |
| 39 | Supplying, fitting & fixing of Vitrified Industrial floor tiles of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size 30cm x 30cm in floors of approved make laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with slurry including cost of all materials, labour T&P etc required for the work all complete as per direction of the Engineer-in-charge A) GROUND FLOOR |
| 40 | B) FIRST FLOOR |
| 41 | Supplying fitting and fixing of vitrified tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-ChargeA) GROUND FLOOR |
| 42 | B) FIRST FLOOR |
| 43 | Fixing Vitrified tiles in dados skirting and risers of steps on 12mm thick CP (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including cost, carriage, cost of all labour etc. complete.A) GROUND FLOOR |
| 44 | B) FIRST FLOOR |
| 45 | Supplying, fitting & fixing of 30cm x 20cm/20cm x 20cm special plain/printed series Ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753 in dadoes, skirting and risers of steps laid on 12 mm thick cement mortar (1:3) (1 cement : 3 course sand) jointed with slurry mixed with pigment to match the shades of the tiles etc. complete including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge A) GROUND FLOOR |
| 46 | B) FIRST FLOOR |
| 47 | 2.5cm (1”) thick Grading Concrete over roof slab in Cement Concrete (1:2:2) 6mm (1/4”) size Clean hard black crusher broken granite Chips of approved quality from approved quarry including hosting lowering and laying in layers ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete. A) First Floor |
| 48 | B) Second Floor |
| 49 | Supplying, fitting & fixing of Granite Tiles of minimum Above 0.40 sqm. (20mm thick) of approved make in floors laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with slurry including cost of all materials, labour T&P etc. required for the work all complete incl. rubbing as per direction of the Engineer-in-charge |
| 50 | Supplying, fitting & fixing of 30cm x 30cm/40cm x 40cm special plain/printed series Ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755 in floors laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with slurry including cost of all materials, labour T&P etc. required for the work all complete incl. rubbing as per direction of the Engineer-in-chargeA) GROUND FLOOR |
| 51 | B) FIRST FLOOR |
| 52 | Manufacturing and supplying of M.S. Doors, windows, grills, vantilotors , collarseble gate and doors frame with pannel shuter made out of structural steel plates and bars conferming to IS spesification as per drawing, design, including with all cost, laour, T&P etc complete as per direction of Engineer-in-charge.A) GROUND FLOOR |
| 53 | B) FIRST FLOOR |
| 54 | C) SECOND FLOOR |
| 55 | Labour for fitting and fixing of M.S. Grill, Doors, Windows and ventilator including all cost of labour with T&P require for the work etc complete.A) GROUND FLOOR |
| 56 | B) FIRST FLOOR |
| 57 | C) SECOND FLOOR |
| 58 | Providing, fitting and fixing of Al door with anodized Al. door section of 9202 as vertical member, 9201 as top and 9200 as middle and bottom member with frame section No.9221 and tapered clip no. 4660 and the frame to be completed by means of jointing angle no. 1855 including all cost of labour, T&P, hire charges of drilling machine, labour charges , etc. complete as per direction of the Engineer-in-charge (Top half glass & bottom half of Board)A) GROUND FLOOR |
| 59 | B) FIRST FLOOR |
| 60 | Supplying Fitting, fixing up fully glazed aluminium framed window (sliding type) made up aluminium section 9778 as window frame, section 4095, 4096 and 9777, 3994 as shutter frame with 5mm black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of all materials, all taxes, labour, T&P excluding cost of glass etc. complete as per direction of the Engineer-in-charge |
| 61 | Supplying fitting fixing 6mm thick glass with all cost and conveyance in sliding windows |
| 62 | C.C. of proportion (1:2:4) in foundation and floors using 12mm (1/2”) size Clean hard black crusher broken granite chips of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6”) thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete. A) GROUND FLOOR |
| 63 | B) FIRST FLOOR |
| 64 | C ) SECOND FLOOR |
| 65 | Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials labour T & P etc. as per direction of Engineer -In -charge. A) Ground Floor |
| 66 | B) FIRST FLOOR |
| 67 | C) SECOND FLOOR |
| 68 | Wall Painting two coats with approved Plastic Emulsion Paint over a coat of Water Bound Wall cement Primer of approved shade on new work to give an even shape including cost of paint etc complete.A) Ground Floor |
| 69 | B) FIRST FLOOR |
| 70 | C) SECOND FLOOR |
| 71 | Weathering two coat with any approved Weather coat on new work after scraping and cleaning the surface over one coat of water bound wall primer including watering and curring all cost of materials, scaffolding, labour with T&P etc. complete as per direction of Engineer-in-charge.A) GROUND FLOOR ( Outer Side ) |
| 72 | B) FIRST FLOOR ( Outer Side ) |
| 73 | C) SECOND FLOOR |
| 74 | Painting Two coats (Enamel Paint) with any approved shade on new/Old Doors and windows including all cost, conveyance,tax of materials and labour with T&P required for the work etc complete.A) GROUND FLOOR |
| 75 | B) FIRST FLOOR |
| 76 | C) SECOND FLOOR |
| 77 | Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90 mtrs C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc with coist, conveyance, taxes of all materials, labour and T&P required for the work all complete in all respect. Please Enable Macros to View BoQ information |