| 1 | Safe loading & carriage including Loading-unloading & proper stacking at a Place of work site of following store materials from ESC Tripula to site of work:- |
| 2 | Carriage of PCC pole 8 mtr long and other related materials from ESC Tripula to work site with loading- unloading and proper stacking at a Place. |
| 3 | Carriage of 250 KVA T/F and other related materials from ESC Tripula to work site with loading- unloading and proper stacking at a Place. |
| 4 | Carriage of 100 KVA T/F and other related materials from ESC Tripula to work site with loading- unloading and proper stacking at a Place. |
| 5 | Cartage of Loose line material including ACSR/RABBIT/AB /XLPE CABLE/Alluminum 3.5X70mm/ weasel Conductor, Earth wire 7/14 SWG, Pin Insulators, Disc Insulatos, Top Channel, Stay Set, Disc Fitting 45/70 KN (T&C), Stay Clamp, 11KV F Clamp, D/P Clamp, V type Cross Arm, Disc Insulators, Stay Wire, SS Base Angle, Earthing Rod, Holding Clamp, T-Off Channel, G.I. Wire 6 SWG, Dropper Channel, Holding Clamp, F Clmp, LT Shackel Insulators, PVC Armed Cable (2X4mm).I/D & O/D cable Jointing kit., other remaining items. As per required Estimate. |
| 6 | Recd. back of old 100 KVA T/F and other Related Materials from work site to ESC Tripula, Raebareli after dismantling of T/F from D/Pole/Four Pole Structure/ Plinth, alongwith loading unloading. |
| 7 | Recd. back of old 63 KVA T/Fand other Materials from work site to ESC Tripula, Raebareli after dismantling of T/F from D/Pole/Four Pole Structure/ Plinth, alongwith loading unloading. |
| 8 | Labour and Errection Charges:- |
| 9 | Dismantling of old existing 100 KVA T/F from D/Pole/Four Pole Structure/Plinth then stacking of dump site with loading unloading, |
| 10 | Dismantling of old existing 63 KVA T/F from D/Pole/Four Pole Structure/Plinth then stacking of dump site with loading unloading, |
| 11 | Mounting of 100 KVA T/F on old existing D/Pole/Four Pole Structure alongwith fitting of all related accessories As per RESPO norms. |
| 12 | Earthing of T/F body & neutral, As per RESPO norms. |
| 13 | The work for Construction of new Plinth size 2.00X2.00X1.50 for making outer wall of Plinth by 1st class brick work in Cement mortar of ratio1:6 of filling earth in Plinth and providing Ston ballast then plastering the top and all side of plinth wall with cement Corse and sand in ratio 1:4 and then proper spraying of water alongwith All materials & Labour for Mounting of 250 KVA T/Fs on Plinth alongwith fitting of all accessories,under BUSINESS PLAN 2026-27, as per RESPO Norms. all required Materials for construction of New Plinth Provided by Contractor. |
| 14 | Mounting of 250 KVA T/F on New Constructed PLINTH alongwith fitting of all related accessories, As per RESPO norms. |
| 15 | Labour Charges for earthing of 250 KVA 11/0.4 KV Power Transformers completed for digging of 60 fit Borewell type pit (1.5-inch diameter) to install 60 fit long M.S. Pipe (60 fit long) with 1.5-inch diameter work followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fitting of spaces by homogeneous mixture of coke & sault against medium power transformer body and neutral earthing these includes connection of M.S Strip fot sepret common pit as there will be one pit of each earthing. All required material will be provided by contractor. |
| 16 | Making/Errection/Installation/painting/gouting/welding/febrication/earthig work of Wirmesh Fancing of Jali alongwith Angle isn size of 35X35X5X2500 mm with Nut & Bolts, Washer, Earthing Rod & G.I. wire. Making of 01 No. Gate by M.S. Angle in size of 35X35X5X1000 mm with Nut & Bolts Washer, Earthing Rod & G.I. wire. One No. Gate of M/S Angle in size of 25X5 mm with wiremesh and each of the same. Grouting of M.S. Angle and other required Angles with Grouting materials as per RESPO Norms, under BUSINESS PLAN 2023-24, under EDD Salon, Raebareli. All rewuired material will be provided by contractor. |
| 17 | Work for Installation/fixing of Dropper Channel (100x50x2028) mm, as per RESPO Norms. |
| 18 | Work for Installation/fixing of Top Channel (125x65xd2240)mm, as per RESPO Norms. |
| 19 | Work for Installation/fixing of MS \\"T\\" OFFChannel (125x65xd1300) mm, as per RESPO Norms. |
| 20 | Work for Installation/fixing of TPMO Set(125x65xd1300) mm, as per RESPO Norms. |
| 21 | Work forMaking//fixing/Tightening of 11 KV Fuse Set, as per RESPO Norms. |
| 22 | Laying , stringing & Jointing/Fixing of LT PVC Cable AL 3.5X400 Sq.mm, as per RESPO Norms. |
| 23 | Laying , stringing &Jointing/Fixing of LT PVC Cable 3.5X15/70 Sq.mm Sq.mm, as per RESPO Norms. |
| 24 | Digging of Pits, fixing nozzling & grouting of Stay Rod inclucing fitting of all accessories with grouting materials as per RESSPO Norms |
| 25 | Earthing of PCC. Poles as per RESSPO Norms, AS Required. |
| 26 | Laying , stringing & Jointing/Fixing of LT ABC (3X95+1X70+1X16) Sq..mm, as per RESPO Norms. |
| 27 | Laying , stringing & Jointing/Fixing of LT XLPE Cable (1X120) Sq..mm, as per RESPO Norms. |
| 28 | Work for Installation/Fixing of Ston Pad 300X300X75, Material Provided by Contractor |
| 29 | Work for Installation/Fixing/Tightening of Clamp of LT \\"T\\" OFF with Nuts & Bolt, Material Provided by Contractor |
| 30 | Work for Installation/fixing/Tightening of Holding Clamp, Material Provided by Contractor |
| 31 | Work for Making/ Installation Danger Board with clamp & nuts & Bolt , Material Proided by Contractor. |
| 32 | Making of LT Incomming Pannel with Metering Equipments & Fixing Arrangments, Material Provided by Contractor. |
| 33 | Work for Installation/fixing/Tightening of Copper L Piece 50x225x10 mm, Material Provided by Contractor |
| 34 | Work for Installation/fixing/Tightening of Al. LUG Long Barrel OFF Size (LS), as per required Estimate, Material Provided by Contractor |
| 35 | Work for Installation/fixing/Tightening of Henley Type,Tail Less Unit on 250 KVA T/Fs. Material Provided by Contractor |
| 36 | RED OXIDE PAINT & ALUMMINIUM PAINT for Painting work as required, Material Provided by Cobntractor |
| 37 | Making/Fixing/Tightening of suspension Clamp with Nuts & Bolt, Material Provided by Contractor |
| 38 | Making/Fixing/Tightening of \\"I hook\\" with Nuts & Bolt, Material Provided by Contractor |
| 39 | Making/Fixing/Tightening of Distribution Box etc with Nuts & Bolt, Material Provided by Contractor Please Enable Macros to View BoQ information |