| 1 | Safe loading & carriage including Loading-Unloading & proper stacking at a Place of work site of following store materials from ESC Tripula to site of work:- |
| 2 | 250 KVA T/F |
| 3 | 100 KVA T/F |
| 4 | PCC Pole 8.5 Mtr. |
| 5 | MS Dropper Channel (100X50X2028 mm) |
| 6 | MS Angle 75x75x6x2028 mm for Fuse Set |
| 7 | MS Top Channel (125X65X2240 mm) |
| 8 | 11 KV T&C Type 4500 KG Disc Insulator |
| 9 | 11 KV T&C Type 4500 KG Disc Fitting |
| 10 | MS \\"T\\" OFF Channel (125X65X1300 MM) |
| 11 | 11 KV Pin Insulator with fitting |
| 12 | 11 KV TPMO Set |
| 13 | 11 KV Fuse Set |
| 14 | LT PVC Cable 3.5x400 Sq.mm |
| 15 | LT PVC Cable 3.5x150/70 Sq.mm |
| 16 | Stay Set Complete (16X1800) |
| 17 | Earthing of PCC/ST Pole, with Earthing Rod 20x2500 mm, and 6 SWG Earthing wire etc.. As per RESPO Norms. |
| 18 | LT ABC (3X120+1X70+1X16) sq.mm |
| 19 | ASCR Weasal Conductor |
| 20 | ASCR DOG Conductor |
| 21 | 11 KV \\"V\\" Type X-Arms |
| 22 | Labour Ereection Charges:- |
| 23 | Digging of pits of PCC Pole 8.5 Mtr. Long from dump site to pit site then errection of PCC poles with fitting of all related accessories as per RESPO Norms. |
| 24 | Grouting of PCC poles 8.5 Mtr. along with grouting materials as per RESPO Norms. |
| 25 | Making/Prapairing of double pole structure by.PCC Pole then Pole grouting with grouting materials and earthinh including fitting of all equired accessories items, as per RESPO Norms. |
| 26 | Earthing of Pole with Complet fitting of all accessories |
| 27 | Earthing of T/F Body & Neutral alongwith fitting of All accessories, as per RESPO Norm. |
| 28 | Digging of Pits, fixing nozzling & grouting of Stay Rod inclucing fitting of all accessories with grouting materials as per RESSPO Norms |
| 29 | Laying , stringing & sagging of HT Line by ACSR weasal conductor including all associated work & making clearance of Road with Joint/jumpers & binding on insulators as required. |
| 30 | Laying , stringing & sagging of HT Line by ACSR DOG Conductor including all associated work & making clearance of Road with Joint/jumpers & binding on insulators as required. |
| 31 | The work for excavation of new Plinth size 2.00X2.00X1.50 for Mounting of 250 KVA T/Fs, under BUSINESS PLAN 2026-27, making outer wall of Plinth by 1st class brick work in Cement mortar of ratio1:6 of filling earth in Plinth and providing Stone ballast and then plastering the top and all side of plinth wall with cement Corse and sand in ratio 1:4 and then proper spraying of water alongwith fitting of all accessories, As per RESPO Norms. All required materials & Labour will be provided by Contractors in own resourses. |
| 32 | Mounting of 100 KVA Transformer on new Constracted double pole alongwith fitting of all acessories as per RESPO Norms. |
| 33 | Labour Charges for earthing of 250 KVA 11/0.4 KV Power Transformers completed for digging of 60 fit Borewell type pit (1.5-inch diameter) to install 60 fit long M.S. Pipe (60 fit long) with 1.5-inch diameter work followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fitting of spaces by homogeneous mixture of coke & sault against medium power transformer includes connection of M.S Strip for sepret common pit as there will be one pit of each earthing. All required material will be provided by contractor. |
| 34 | Making/Errection/Installation/painting/gouting/welding/febrication/earthig work of Wirmesh Fancing of Jali alongwith Angle isn size of 35X35X5X2500 mm with Nut & Bolts, Washer, Earthing Rod & G.I. wire. Making of 01 No. Gate by M.S. Angle in size of 35X35X5X1000 mm with Nut & Bolts Washer, Earthing Rod & G.I. wire. One No. Gate of M/S Angle in size of 25X5 mm with wiremesh and each of the same. Grouting of M.S. Angle and other required Angles with Grouting materials as per RESPO Norms, under BUSINESS PLAN 2023-24. All required material will be provided by contractor. |
| 35 | work for Installtion/Mounting/Instaiiation of MS Dropper Channel (100X50X2028 mm) as per RESPO Norms. |
| 36 | work for Installtion/Mounting/Instaiiation of MS Top Channel (125X65X2240 mm) |
| 37 | work for Installtion/Mounting/Instaiiation of 11 KV T&C Type 4500 KG Disc Insulator |
| 38 | work for Installtion/Mounting/Instaiiation of MS \\"T\\" OFF Channel (125X65X1300 MM) |
| 39 | work for Installtion/Mounting/Instaiiation of 11 KV TPMO Set. |
| 40 | Laying , stringing & sagging of LT Line by LT ABC 3X120+1X70+1X16 including all associated work & making clearance of Road with Joint/jumpers & binding on insulators as required. |
| 41 | work for Laying/Installtion/Fixing of 11 KV LT PVC Cable 3.5x400 Sq.mm |
| 42 | work forLaying/ Installtion/Fixing of LT PVC Cable 3.5x1.50/70 Sq.mm0 Sq.mm |
| 43 | work for Installtion/Fixing of 11 KV \\"V\\" Type X-Arms |
| 44 | work for Installtion/Mounting of Ston Pad (3X300X300X75)mm, Material Provided by Contractor |
| 45 | work for Jointing/Fixing/Instaiiation of LT Fuse Set in (SMC BOX, Material Provided by Contractor |
| 46 | work for Installtion/Fixing/Tightening of Holding Clamp, Material Provided by Contractor |
| 47 | work for Installtion/Fixing/Tightening of Cooper Piece 50x225x10mm), Material Provided by Contractor |
| 48 | work for Installtion/FixingTightening of Cooper Piece 65x225x12mm), Material Provided by Contractor |
| 49 | work for Installtion/Fixing/Tightening of AL.Lug Long Barrel off size (LS), Material Provided by Contractor |
| 50 | work for Installtion/Fixing/Tightening of Henly Type Tailless Unit for 250 KVA T/F, Material Provided by Contractor |
| 51 | work for Fixing/Instaiiation/Tightening of Suspension Clamp t for 250 KVA T/F, Material Provided by Contractor |
| 52 | work for Fixing/Instaiiation/Tightening of \\"I\\" Hook with Suspension Clamp, Material Provided by Contractor |
| 53 | work for Tightening/Fixing/Instaiiation of \\"Three Phase\\" Distribution Box, Material Provided by Contractor |
| 54 | work for Tightening/ Installtion/Fixing of 11 KV \\"F\\" Clamp, Material Provided by Contractor |
| 55 | work for Installtion/Fixing of LT Clamp T OFF with Bolt & Nuts, Material Provided by Contractor |
| 56 | work for Tightening/Installtion/Fixing of LT Clamp Pole Clamp for PCC Poles with Bolt & Nuts, Material Provided by Contractor |
| 57 | work for Installtion/Fixing/Tightening of Danger Board with covering of Barbed wire including Jumper Tightening of Bolt & Nuts, Material Provided by Contractor |
| 58 | Sundry item ( Required Materials), Provided by Contractor Please Enable Macros to View BoQ information |