| 1 | Total amount of the \\"Rate Schedule\\" sheet SCHEDULE OF QUANTITY AND RATE FOR REPLACEMENT OF ACSR CONDUCTOR BY AERIAL BUNCH CABLE IN DIFFERENT AREAS OF JOLLYGRANT SECTION UNDER EDSD, JOLLYGRANT UNDER EDD, DOIWALA AGAINST E-TENDER SPECIFICATION NO.27/EDCRDDUN/2026-27 Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Qty Rate Amount Part [A] (Supply Portion) |
| 2 | PG Clamp 70 sqmm. - 70 sqmm. |
| 3 | PG Clamp 95 sqmm. - 95 sqmm. |
| 4 | Suspension Clamp with J Hook |
| 5 | Dead End Clamp for AB Cable |
| 6 | Piercing Connector for 95 sqmm. - 70 sqmm. |
| 7 | Insulation Piercing Connector for 120 sqmm. - 50 sqmm. |
| 8 | Piercing Connector 95 sqmm. - 50 sqmm. |
| 9 | Piercing Connector 120 sqmm. - 95 sqmm. |
| 10 | PRC 120-120 |
| 11 | LT Bare N. Conn. PG Clamp for DB 50 sqmm. - 50 sqmm. |
| 12 | Piercing Connector 70 sqmm. - 70 sqmm. |
| 13 | Distribution Box Clamp |
| 14 | Special Type Holding Clamp for GI Hook N&B |
| 15 | LT XLPE Cable 1x50 sqmm. |
| 16 | LT XLPE AB Cable 3x70+1x50 Sq.mm. |
| 17 | LT Distribution Box 3 Phase |
| 18 | AL. Crimping Type Lugs 50 sqmm. |
| 19 | AL. Crimping Type Lugs 95 sqmm. Total - Part [A] 0.0 Part [B] (Labour Portion) |
| 20 | Fixing , tightening and nozzling of Stay with pole and stay rod on required tension as per drawing / RESPO manual. LT Stay Nos 16.0 0.0 |
| 21 | Erection of following Single support pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESPO construction Manual. SP-21 Nos 14.0 0.0 SP-33 Nos 22.0 0.0 |
| 22 | Dismantling of LT line 3 Phase 4 Wire (Weasel) |
| 23 | Cartage of following ST pole from store centre to construction site with loading, unloading at both points and proper stacking (21-50 Km). SP-21 Nos 14.0 0.0 SP-33 Nos 22.0 0.0 |
| 24 | Cartage of other material (other than poles) by vehicle fro Store Center to nearest construction site Store including loading and unloading at both ends (21-50 Km.) Rs.Per Qtl. Qtl 95.0 0.0 |
| 25 | Head load cartage of following Poles from road to site Upto 0 to 1 Km. SP-21 Nos 14.0 0.0 SP-33 Nos 22.0 0.0 |
| 26 | Head load cartage of Small material. Rates are per Km/Quintal including loading and Unloading. Upto 0 to 1 Km. Qtl 95.0 0.0 |
| 27 | Laying of LT AB Cable 3x70+1x50 sqmm. |
| 28 | Laying of LT XLPE AB Cable 3x95+1x70 sqmm. |
| 29 | Installation of LT DB 3 Phase for LT AB Cable |
| 30 | Disconnection & Reconnection of Consumer |
| 31 | Back Cartage of Petty Material , 0-20 Km. |
| 32 | Fixing of Dead End Clamp |
| 33 | Fixing of Suspension Clamp with I Hook |
| 34 | Fixing of Piercing Connector L2L 120-120 |
| 35 | Back Head Load Cartage of Petty Material. (0-1 Km.) |
| 36 | Fixing of 1x50 sqmm. XLPE Cable |
| 37 | Installation of 95 sqmm. LT Al. Lugs |
| 38 | Installation of 50 sqmm. LT Al. Lugs |
| 39 | Fixing of Piercing Connector 120 sqmm. - 95 sqmm. |
| 40 | Fixing of PG Clamp 95 sqmm. - 95 sqmm. |
| 41 | Fixing of PG Clamp 70 sqmm. - 70 sqmm. |
| 42 | Supply & Fixing of Al. Lugs 1x70 sqmm. |
| 43 | Laying, Erection & Commissioning of LT AB Cable 3x120+95 sqmm. |
| 44 | Fixing of Piercing Connector L2L 95-70 |
| 45 | Fixing of Piercing Connector L2L 70-70 |
| 46 | Removing Old Conductor by Opening Jumper |
| 47 | Fixing of Insulation PRC for Networking |
| 48 | Fixing of PG Clamp 50 sqmm. - 50 sqmm. |
| 49 | Fixing of Distribution Clamp |
| 50 | Fixing of Special type Holding Clamp for GI Hook Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer Please Enable Macros to View BoQ information |