| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (All kinds of soil) |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 4 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : (All kinds of soil) |
| 5 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. |
| 6 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
| 7 | Providing and laying in position cement concrete of specified grade including curing, but excluding the cost of centering and shuttering. All work up to plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 8 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 9 | 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 10 | Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 11 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 12 | CEMENT PLASTER; (IN FINE SAND)12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 13 | CEMENT PLASTER; (IN FINE SAND)12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 14 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 15 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:4:8 leaner mix (i/c equivalent design mix) |
| 16 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 17 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar |
| 18 | Dismantling old protection work including cutting of crates and stacking of stones |
| 19 | Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations. |
| 20 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal |
| 21 | Dry stone pitching (any thickness) excluding cost of stones. On slopes |
| 22 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 23 | Dumping stone excluding cost of stones. in Horizontal on level |
| 24 | Dumping stone excluding cost of stones. On slope (Behind pitching) |
| 25 | Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing. |
| 26 | Opening out old wire crates those and re-binding after filling. |
| 27 | Supply of Stone boulder (nallah) nominal size 225 mm incl. royalty and/or other taxes, (Stack measurements reduced by 15%) |
| 28 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / s]and |
| 29 | Unloading sand/earth filled bags from boats placing in dry |
| 30 | Unloading sand/earth filled bags from boats placing in wet |
| 31 | Engagement of Labour / Bullock man with single bullock / Chowkidar / Belder/ Coolie/ Mali / sewer man / Helper (Technician) {unskilled labour} |
| 32 | Mason (1st class), fitter (Grade-I),Carpenter(1st class), Black smith (1st class), Mistry, Technician etc. |
| 33 | Supply of Empty cement bags |
| 34 | Cement & steel, G.I/C.I pipe avg. lead upto 05 Kms |
| 35 | Cement & steel, G.I/C.I pipe avg. lead beyond 5 Kms upto 10 Kms (per Km) |
| 36 | Cement & steel, G.I/C.I pipe avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 37 | Cement & steel, G.I/C.I pipe avg. lead beyond 20 Kms per additional Km |
| 38 | Sand & Agg. 20 mm avg. lead upto 05 Kms |
| 39 | Sand & Agg. 20 mm avg. lead beyond 5 Kms upto 10 Kms (per Km) |
| 40 | Sand & Agg. 20 mm avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 41 | Sand & Agg. 20 mm avg. lead beyond 20 Kms per additional Km |
| 42 | 40 mm Agg. avg. lead upto 5 Kms |
| 43 | 40 mm Agg. avg. lead beyond 05 Kms upto 10 Kms (per Km) |
| 44 | 40 mm Agg. avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 45 | 40 mm Agg. avg. lead beyond 20 Kms per additional Km |
| 46 | Stone soling avg. lead upto 5 Kms |
| 47 | Stone soling avg. lead beyond 05 Kms upto 10 Kms (per Km) |
| 48 | Stone soling avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 49 | Stone soling avg. lead beyond 20 Kms per additional Km |
| 50 | Earth avg. lead of upto 05 Km |
| 51 | Earth avg. lead beyond 05 Kms upto 10 Kms (per Km) |
| 52 | Earth avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 53 | Earth avg. lead beyond 20 Kms per additional Km |
| 54 | Carriage of material by manual from road site to actual site of work, including loading, unloading and stacking etc. complete by manual labour Cement for an avg. lead upto 50 mtr. |
| 55 | Cement for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 56 | Steel for an average lead upto 50 Mtr |
| 57 | Steel for an every additional lead of 50Mtrs or part thereof beyond 1st 50 Mtrs |
| 58 | Soling for an avg. lead upto 50 mtr. |
| 59 | Soling for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 60 | Sand & stone below 40mm Agg for an average lead upto 50Mtr |
| 61 | Sand & stone below 40mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 62 | sand & stone agg40mm and above for an average lead upto 50Mtr |
| 63 | 40mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 64 | Earth for an average lead upto 50Mtr |
| 65 | Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 66 | Supply of B.A. wire 4mm dia Knitted crate boxes size 6.0mx1.50mx1.50m with lids (15cm x 15cm Mesh) |
| 67 | Supply of B.A. wire 4mm dia Knitted crate boxes size 6.0mx1.20mx1.20m with lids (15cm x 15cm Mesh) Please Enable Macros to View BoQ information |