| 1 | CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 50 Km.) |
| 2 | ACSR Dog Conductor |
| 3 | GI Wire 5 MM 6 SWG |
| 4 | MS Angle Iron 65x65x65 MM with Clamp |
| 5 | Cable Jointing Kit Straight Through 3x185 MM |
| 6 | 11 KV Fuse Set |
| 7 | 33 KV Fuse Set |
| 8 | 11 KV VCB O/G |
| 9 | Cable LT ABC (3x95+1x35+1x16) sq mm |
| 10 | Ms Guarding Angle |
| 11 | GI Wire 6 SWG |
| 12 | 11 KV 3x300 sq mm Cable Box |
| 13 | 33 KV 3x300 sq mm Cable Box |
| 14 | 33 KV Bus Isolator |
| 15 | Top Channel |
| 16 | 33 KV Line Isolator |
| 17 | 33 KV Lightening Arrestor |
| 18 | 33 KV Post Insulator |
| 19 | 33 KV Disc Insulator with fitting B&S type |
| 20 | 33 KV Pin Insulator with Nut |
| 21 | 33 KV Control Pannel for Single |
| 22 | 33 KV CT/PT Metering Pole Mounted Unit |
| 23 | 33 KV CT 200/100/1-1A |
| 24 | Earthing Complete |
| 25 | DE-CENTRALIZED MATERIALS, Provided Contractor |
| 26 | Nut & Bolt Washear |
| 27 | PG Clamp |
| 28 | Ms Guarding Angle Clamp with Nut Bolt |
| 29 | Earthing of LA (Delta Earthing) |
| 30 | Silica Gel |
| 31 | Lugs for 25/63/100 KVA |
| 32 | Stud for 25/63/100 KVA |
| 33 | HT Fuse wire 25/63/100 KVA |
| 34 | Meggar |
| 35 | Tong Tester |
| 36 | Danger Board with Clamp Nut Bolt |
| 37 | Control Cable 4x2.5 Sq mm |
| 38 | Control Cable 2x2.5 Sq mm |
| 39 | Clamp with Nut Bolt for Fuse set |
| 40 | 12 Volt Battery |
| 41 | Silica Gel Brether with Top Buttom Al Body of 10 MVA |
| 42 | Chemical Earthing for T/F |
| 43 | Pearcing Connector |
| 44 | Battery Charger |
| 45 | Silica Gel Brether with Top Buttom Al Body of 5 MVA |
| 46 | Clamp for CT/PT Unit |
| 47 | Plinth of 250/400 KVA T/F |
| 48 | Fencing of T/F |
| 49 | 33 KV Strcture of Line Isolator |
| 50 | Structure for 33 KV Fuse Set |
| 51 | Making of Stright Through |
| 52 | Plinth of Fuse Set |
| 53 | Work of following materials as Per RESSPO/PuVVNL norms at the work site. |
| 54 | Earthing Complete |
| 55 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR WEASEL Conductor, binding with insulators & jumpering. |
| 56 | 11 KV Fuse Set |
| 57 | 33 KV Fuse Set |
| 58 | 11 KV VCB O/G |
| 59 | Cable LT ABC (3x95+1x35+1x16) sq mm |
| 60 | 11 KV 3x300 sq mm Cable Box |
| 61 | 33 KV 3x300 sq mm Cable Box |
| 62 | 33 KV Bus Isolator |
| 63 | 33 KV Line Isolator |
| 64 | 33 KV Lightening Arrestor |
| 65 | 33 KV Control Pannel for Single |
| 66 | 33 KV CT/PT Metering Pole Mounted Unit |
| 67 | 33 KV CT 200/100/1-1A |
| 68 | Cable Jointing Kit Straight Through 3x185 MM |
| 69 | Earthing of LA (Delta Earthing) |
| 70 | Control Cable 4x2.5 Sq mm |
| 71 | Control Cable 2x2.5 Sq mm |
| 72 | Chemical Earthing for T/F |
| 73 | Plinth of 250/400 KVA T/F |
| 74 | Fencing of T/F |
| 75 | 33 KV Strcture of Line Isolator |
| 76 | Structure for 33 KV Fuse Set |
| 77 | Making of Stright Through |
| 78 | Plinth of Fuse Set Please Enable Macros to View BoQ information |