| 1 | Dismantling tile work in floors /wall and roofs laid in cement mortar includingstacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm |
| 2 | Demolishing cement concrete manually/by mechanical means includingdisposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Demolishing brick tile covering in terracing including stacking ofserviceable material and disposal of unserviceable material within 50meters lead. |
| 4 | Demolishing mud phaska in terracing and disposal of material within 50meters lead |
| 5 | Providing and laying integral cement based water proofing treatmentincluding preparation of surfaces as required for treatment of roofs,balconies, terraces etc consisting of following operations.a) Applying a slurry coat of neat cement using 2.75kg/sqm of cementadmixed with water proofing compound conforming to IS 2645 andapproved by Engineer-in-charge over the RCC Slab including adjoiningwalls upto 300mm height including cleaning the surface beforetreatment.b) Laying brick bats with mortar using broken bricks/ Brick Bats 25mmto 115mm size with 50% of Cement mortar 1:5 (1 Cement : 5 coarsesand) admixed with water proofing compound conforming to IS 2645and approved by Engineer-in-charge over 20mm thick layer of cementmortar of mix 1:5 (1 Cement : 5 coarse sand) admixed with waterproofing compound conforming to IS 2645 and approved by Engineerin-charge to required slope and treating similarly the adjoining wallsupto 300mm height including rounding of Junctions of walls and slabs)c) After two days of proper curing applying a second coat of cementslurry using 2.75kg/sqm of cement admixed with water proofingcompound conforming to IS 2645 and approved by Engineer-in-charge.d) finishing the surface with 20mm thick joint less cement mortar of mix1:4(1 cement: 4 coarse sand) admixed with water proofing compoundconforming to IS 2645 and approved by Engineer-in-charge includinglaying glass fibre cloth of approved quality in top layer of plaster andfinally finishing the surface with trowel with neat cement slurry andmaking pattern of 300x300mm/sq 3mm deep.e) The whole terrace so finished shall be flooded with water for aminimum period of two weeks for curing and for final test. All aboveoperations to be done in order and as directed and specified by Engineerin-charge.23.7.1 With a |
| 6 | Providing and laying Vitrified tiles in floor with different sizes(thickness to be specified by the manufacturer), with water absorptionless than 0.08% and conforming to IS: 15622, of approved brand andmanufacturer, in all colours and shades, laid with cement based highpolymer modified quick set tile adhesive (water based) conforming to IS:15477, in average 6 mm thickness, including grouting of joints (Paymentfor grouting of joints to be made separately). |
| 7 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS : 15622(thickness to be specified by the manufacturer), of approved make, in all colours, shadesexcept burgundy, bottle green, black of any size as approved by Engineer- in-Charge, inskirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 ( 1 cement :3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointingin white cement mixed with pigment of matching shade complete |
| 8 | Providing and fixing white vitreous china pedestal type water closet(European type W.C. pan) with seat and lid, 10 liter low level whiteP.V.C. flushing cistern, including flush pipe with manually controlleddevice (handle lever), conforming to IS:7231, with all fittings andfixtures complete, including cutting and making good the walls andfloors wherever required:A) W.C. pan with ISI marked white solid plastic seat and lid. (AIS -WHT-101851S220SPPSM) |
| 9 | Providing and fixing 8 mm dia C.P. / S.S. Jet with flexible tube upto1 metre long with S.S. triangular plate to European type W.C. ofquality and make as approved by Engineer - in - charge. ALE -CHR-585 |
| 10 | Providing and fixing uplasticized PVC connection pipe with brass unions 45cm 15mm |
| 11 | Proving & fixing of Exhaust fan. |
| 12 | Bib cock inch fittings SQT-512KN |
| 13 | angle wall SQT-526NKN |
| 14 | Wall mixer (SQT-520KN) |
| 15 | shower (EOS-491) |
| 16 | Towel rod(AEC-1111N) |
| 17 | soap Dish(AEC-1133) |
| 18 | Tumbler holder( AEC-1141N) |
| 19 | Towl shelf(AEC-1181N) |
| 20 | Wall hung basin(ECS-WHT-301) |
| 21 | waste coupling(ALE-544NFT) |
| 22 | cp grating |
| 23 | pillar cock DLX-516KN |
| 24 | cvpc pipes incl fittings |
| 25 | engaged plumbler for repair of sanitary fitting including leakage of Pipes and other allied works |
| 26 | Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5sqmand under, including cutting the patch in proper shape, raking out jointsand preparing plastering the wall surface with white cement basedpolymer modified self curing mortar, including disposal of rubbish, allcomplete as per the direction of Engineer-In-Charge. |
| 27 | provision for electrification |
| 28 | carriage of sand and agg 15km &50mtr head load Please Enable Macros to View BoQ information |