| 1 | Safe loading, carriage including unloading and proper stacking of following materials from Central Store Barabanki Store to site of work. |
| 2 | ACSR Panther Conductor |
| 3 | 600/300/5 AMP, 350 MVA Incoming |
| 4 | 33 kv Polumeric Pin Insulator with Nut & Washer |
| 5 | 33 kv Pin with Nut |
| 6 | 33 kv Line isolator |
| 7 | 33 KV Lightening Arrester |
| 8 | 10 MVA Transformer |
| 9 | Control Cable 2x2.5 sqmm |
| 10 | Control Cable 4x2.5 sqmm |
| 11 | Control Cable Tray |
| 12 | 11 kv 3x300 sqmm XLPE |
| 13 | 11 kv 3x300 sqmm XLPE Cable Outdoor |
| 14 | 11 kv 3x300 sqmm XLPE Cable indoor |
| 15 | Single Core PVC Cable, 1x630 sqmm |
| 16 | Erection and installation of 33/11KV 10 MVA T/F in a levelled position of the plinth. The work includes shifting of T/F to the site & installation within the S/S premises, assembling, fixing and fitting of all accessories with required packing and filling of T/F oil upto desired level. Ensuring that there is no leakage and all jumpering & connection & testing are included in the scope of work & at the time of T/F installation,damage plinth of T/F should be maintained by contractor. |
| 17 | Fabrication and grouting (1:4:8) of MS Channel 100x50mm in L Shape & in proper size and alignment to provide support through Gl earthing strips (50x6)mm size for power transformer neutral including supply & fixing of flexible copper bonds for neutral earthing as per RESPO Drg. 13.00 (All decentralised materials to be provided by Contractor). |
| 18 | Providing & Fixing of Single Core PVC Cable, 1x630 sq.mm. & fixing between Transformer 17.00 incoming 3x300 Sq.mm XLPE Cable and Transformer 11 KV/LV Side Bushing connector for reducing of tension at LV Side Bushing. |
| 19 | Stringing and sagging of 33 KV line with ACSR Panther Conductor including nuzzling binding and jumpering (weasal conductor will be provided by the department) |
| 20 | Installation of11 KV VCB Incoming CTR O/G 600/300/5 350 MVA |
| 21 | Fixing of 11 KV JOINTING KIT 3X300 SQ MM OUT DOOR |
| 22 | Fixing of 11 KV JOINTING KIT 3X300 SQ MM INDOOR |
| 23 | Laying of XLPE CABLE 3x300 SQ MM by Drill Method (XLPE Cable will be provided by the department) |
| 24 | Provinding & Fixing of various type materials. All materials shall be supplied by the contractor. |
| 25 | ACSR Panther Conductor PG Clamp |
| 26 | making of 11 kv Cable Boxes Mounted with Switchgear & Transformer |
| 27 | Providing of Rubber matting one side chequered and other side plane size 1900x800x12 mm |
| 28 | providing of Hand gloves As per IS 4770 and tested potential 33 Kv. |
| 29 | Fixing of Single Core PVC Cable, 1x400/630 sq.mm. & fixing between Transformer 17.00 incoming 3x300 Sq.mm XLPE Cable and Transformer 11 KV/LV Side Bushing connector for reducing of tension at LV Side Bushing. |
| 30 | Laying of 4x2.5 sq.mm. Sq. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor except Cable) |
| 31 | Laying of 2x2.5 sq.mm. Sq. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey chargèr, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor except Cable) |
| 32 | Repairng of T/F Plinth of 10 mva T/F |
| 33 | Painting of All Switchyard Sub Station Structures (Old+New+fencing) with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. |
| 34 | Construction of control cable trench of 200 mm wide and 300 mm deep with MS strip at a distance of 1mtr. With brick work 1:4:8 in foundation 12 mm thick plaster of 1:4 cement coarse sand for finishing along with MS strip. (All the material will be supplied by the contractor) |
| 35 | Hosting of 11 KV Cable on existing/erected support with provision of MS Pipe 150 mm dia 3 mtr long suitable for 3x185 sq mm cable fixing of proper support and its clamping ,providing long barral lugs 6 nos and P.G. Clamps & \\"Y shape jumpering properly and 02 nos. supporting angle 65X65X6, 2800 mm as per RESSPO Norms. (All material will be supplied by the contractor like MS Pipe, P.G. Clamps, Al. Lug And Supporting Angle 65X65X6, 2800 mm). |
| 36 | Erection of Delta Earthing of Power T/F. the cost of all material with all labour & T&P etc. Complete in all respect. (All material will be supplied by the contractor.) |
| 37 | Special Earthing by Way of Boring and Lowering of \\"B\\" Class GI Pipe 50 mm Dia 20 mtr Long from Ground upto the water level and it will be Connected to GI Strip 50x6 mm (Providing and Laying of G.S Strip including cutting, welding, bending etc.) for equipments(L.A, T/F, CT, VCB etc). The Earth Strip will be welded to the GI Pipe. The Work also Includes Cap and Clamps for pouring water. the cost of all material with all labour & T&P etc. Complete in all respect. (All material will be supplied by the contractor.) |
| 38 | Commissioning of 10 MVA T/F and its equipments installed in Switchyards and 11 kv incoming and outgoing panels complete in all respect upto energising. |
| 39 | Dismantling & safe shifting of existing & working 33/11 KV 05 MVA T/F from plinth to suitable storage place after opening jumper and cable connections as per instruction of Site Engineer. Please Enable Macros to View BoQ information |