| 1 | Site clerance and remove of refuse materials |
| 2 | Construction of Sub-grade and earth in shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of 97% of proctor density. |
| 3 | P/L P.C.C 1:4:8 cement sand 40 mm size ballast all complete work.(SI No.275) |
| 4 | R.C.C 1:1.5:3 cement coarse sand 20mm stone grit for Fundation & footing. (SI No 288A) |
| 5 | Rainforcement in R.C.C work (S.I.No 504) |
| 6 | M 150 class B/W with 1:4 cement and fine sand mortar all complete work (S.I.No 305) |
| 7 | Supply of 22.4-53mm stone ballast at site |
| 8 | Supply of stone dust / Screning material |
| 9 | Consolidation of stone ballast (S.I.No. 755) |
| 10 | Water Allowance |
| 11 | 2.5 Cm thick 1:2:4 Cement concrete floor with cement floring 1:5 corse sand all completed work. |
| 12 | 12 mm thick plaster 1:4 cement and fine sand all complete work.(SI No.584) |
| 13 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.(DSR-13.80) |
| 14 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) (DSR-13.47.1) |
| 15 | Finishing walls with water proofing cement paint of required shade :New work (Two or more coats applied @ 3.84 kg/10 sqm).(DSR-13.44.1) |
| 16 | Providing and Fixing M.S pole 100x100x5 |
| 17 | M.S Railing with fixing all completed work. |
| 18 | Providing and fixing M.S pate 20 mm with all completed work. |
| 19 | Providing and fixing M.S Truss.40x40x4 |
| 20 | Providing and fixing M.S Purlin.40x40x4 |
| 21 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (D.S.R. - 12.1.1) |
| 22 | S/fixing 80mm thick Zig-Zag Color interlocking bricks paver lock including local sand all complete work. |
| 23 | Public toilet Construction (for both men and women) with all facilities. Branded submersible pump for water supply and water storage on the roof (all sizes mentioned in the Drawing) and construction of a safety room as per the instructions of the engineer. |
| 24 | full Drainage in vending Zone Area all complete .Hume Pipe etc and water supply .Construction of public RO drinking water Area all complete. |
| 25 | Electric Supply , Light Arrangements , Connection all completeand writing and Gardening Harticulture work |
| 26 | S/F INAUGRATION STONE AND SITE BOARD Please Enable Macros to View BoQ information |