| 1 | Detail of Work |
| 2 | Safely cartage of PCC poles 11 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 3 | Erection of single support on PCC poles (11 Mtr long) with complete fitting of all accessories of 33 KV line. complete. |
| 4 | Safely carriage of 33 KV cable jointing kit outdoor 3x300 sq mm.from ESC, SRE to site of work including loading & unloading at both ends. |
| 5 | Installation of 33 KV cable jointing kit Outdoor 3x300 sq mm for XLPE Cable as per RESPO specification. |
| 6 | Safely cartage of 33 KV XLPE 3x300 sqmm from ESC, SRE store to site of work including loading & unloading at both ends. |
| 7 | Supply of HDPE pipe PE-80, PN-6, DN-160 mm dia for XLPE Cable. |
| 8 | Laying of HDPE Pipe PE-80, PN-6, DN-160 mm dia pipe and laying of 33 KV XLPE Cable 3x300 sq mm with HDD (trenchless) method including cable laying. |
| 9 | Laying, lifting, stringing proper sagging of 33 KV XLPE cable 3x300 sq mm in Air of including complete etc |
| 10 | Digging & laying of 33 KV XLPE Cable 3x300 sq mm in tranch with sand & brick. |
| 11 | Safely cartage of ACSR Panther Conductor from Transmission store to site of work including loading & unloading at both ends. |
| 12 | Laying, lifting, Stringing, sagging jumpring & binding ACSR Panther Conductor for 33 KV Line complete properly. |
| 13 | Fixing of 33 KV Cross Arm V-Type 100x50x6mm |
| 14 | Fixing of 33 KV Polymeric Pin Insulator properly. |
| 15 | Fixing of 33 KV Disc Insulator B&S 150 KN polymeric Type. |
| 16 | Fixing of 33 KV Disc Fitting for drop B&S Type. |
| 17 | Fixing of 33 KV stay rods (Stay Set) by digging of pits in block of 600X600X300 mm. & with new brick and nozzling of stay wire 7/10 SWG and fitting the same on the pole |
| 18 | Grouting of stay rod in ratio 1:4:8 with Ist class brick ballast with cement, sand. |
| 19 | Fixing of Stay wire 7/8 SWG and fitting the same on the pole. |
| 20 | Earthing of Pole by MS earthing rod 20x2500 properly |
| 21 | Fixing of GI wire 6/8 SWG for guarding. |
| 22 | Fixing of GI wire 16 SWG for Binding. |
| 23 | Providing and fixing of stone ped 300x300x75 |
| 24 | Providing and fixing of 33 KV V-Type Clamp arm with nuts & bolt . |
| 25 | Providing and fixing 33 KV F-Bracket Properly. |
| 26 | Providing and fixing of GI barbed wire on the each pole. |
| 27 | Providing and fixing of Binding wire Aluminum 6 SWG. |
| 28 | Providing and Fixing nuts & bolts washer of various sizes. |
| 29 | Concreting of PCC Pole 11 Mtr long with cement concreting in block of 600x600x1500 mm in ration 1:4:8 with cement sand and Brick ballast size 1x1.5 sq mm. |
| 30 | Providing and Fixing 33 KV Danger board with clamp nuts & bolts. for PCC Poles made of 3mm thick foam sheet (8\\" X 6\\") with |
| 31 | Providing and fixing of Number plate with clamp nut bolt on the each pole. |
| 32 | Providing & Fabrication charges of M.S. Angel 65x65x6, 4300mm long Brancing with 4 clamp. |
| 33 | Providng & Fabrication Charges of M.S. Channal 125x65x3200 mm (Top Channel) |
| 34 | Providing & Fabrication charges of Droper Chanal 100x50x2028 mm long |
| 35 | Providing and fixing Holding Clamp for with nuts &bolt for Top 7 Droper channel. |
| 36 | Providing and fixing PG clamp for Panther to Panther |
| 37 | Providing & fixing of E-bracket with nuts & bolt properly |
| 38 | Gaurding Angel 75x75x8-3010 mm long |
| 39 | Gaurding of Angle Clamp. |
| 40 | Providing & fixing of Eye Bolt 12x100 33 properly |
| 41 | Providing & fixing of Turn Buckle properly |
| 42 | Providing & fixing of Stay Insulator. |
| 43 | Fixing of Nozling of stay wire. |
| 44 | Providing & fixing of G.I. Pipe 160 mm 6\\" dia (Classs B) 3.5 mtr. Long at the both side of double pole/four pole structure including cost of clamp. |
| 45 | Providing & fixing of Holding Clamp for GI Pipe. |
| 46 | Providing & fixing of Holding Clamp for Pole. |
| 47 | Providing & fixing of cable Route Marker |
| 48 | Provding & fixing Lug for ACSR Panther Conductor. |
| 49 | Cutting of Tree Branch of 33 KV Line (5 Km). |
| 50 | Removal of old & used ACSR DOG conductor Screp (11051 Kg) from the Existing lines with making roll of conductor and shifting the same to ESC, SRE/J.E store including loading and unloading at both ends. |
| 51 | The contractor must obtain a work Permission/Approval/NOC FROM ANY Devlopment NHAI/Railway. Please Enable Macros to View BoQ information |