|
| 1 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth into the structure and the size of foundation |
| 2 | Laying Cement concrite in M-15 1:2:4 in cement coarse sand and stone grit mix. including all costs of T&P material required for proper complition of work. |
| 3 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. |
| 4 | Reinforced Cement Concrete work for Super structure of M20 A20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessasary centering and shuttering. required for proper completion of the work in all conditions. |
| 5 | Laying Cement concrite in M-10 1:3:6 in cement coarse sand and stone grit mix. including all costs of T&P material required for proper complition of work. |
| 6 | Centering and Shuttering in of R.C.C. work including all labour , T&P, etc. |
| 7 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. |
| 8 | Struck Pointing With Cement Mortar Consisting of 1:2 (Cement:Fine Sand of 1.25 Finenes Modulus On Brick Work Including Supply Of all Materials Labour And Completion Of Work. |
| 9 | S/f tar paper bearing over bed block. |
| 10 | S/F of wheel guard stone |
| 11 | Earth work in making Ramp and with compaction in 20.00 cm layers and dressing and also including labour T&Petc required for completion of work |
| 12 | Supplying & fixing 75mm.dia streel pipe for rain spout. |
| 13 | Supply and Fixing of M.S. Angle Sign Board 60x90 including cost of material,Taxes, labour T&P etc Complete,But excluding of G.S.T |
| 14 | Making Wall for Sopping traffic 1st class M-100 brick work 1:6 (cement : coarse sand) mortar i/c cost of all material, labour, T&P Complete. But excluding GST. |
| 15 | Dismantelling of Brick Work (Wall for stopping traffic) i/c all labour T&P required. |
| 16 | Earth work in making of Diversion with compaction in 20.00 cm layers, dressing and also including labour T&P etc required for proper completion of work. |
| 17 | Earth work in Disposal of Earth from the road of Diversion including cost of all labour and T&P etc complete. |
| 18 | Providing Brick on edge Soling including cost of all labour and T&P etc. Complete. |
| 19 | Dismantling of Brick on edge Soling form road including cost of all labour and T&P etc. Complete. |
| 20 | providing BOE on Soulders of Road i/c cost of Labour and T&P but Excludig cost of bricks. Please Enable Macros to View BoQ information |