| 1 | Earth work in excavation of foundation trench in all kinds of soil including levelling the bed & deposting the excavated soil within intial lead and lift etc complete and as per direction of the Engineer-in-charge.(Godown) |
| 2 | Earth work in excavation of foundation trench in all kinds of soil including levelling the bed & deposting the excavated soil within intial lead and lift etc complete and as per direction of the Engineer-in-charge.(Office) |
| 3 | Filling foundation and plinth with coarse river sand including watering and ramming etc. complete and as per direction of the Engineer-in-charge.(Godown) |
| 4 | Filling foundation and plinth with coarse river sand including watering and ramming etc. complete and as per direction of the Engineer-in-charge.(Office) |
| 5 | Providing cement concrete (1:3:6) mix with 40mm nominal size H.B stone aggregate in foundations including cost and conveyance of all materials to site and all labour charges complete or as per direction of E.I.C.(Godown) |
| 6 | Providing cement concrete (1:3:6) mix with 40mm nominal size H.B stone aggregate in foundations including cost and conveyance of all materials to site and all labour charges complete or as per direction of E.I.C.(Office) |
| 7 | Fly Ash brick work with 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth per cum and as per direction of the Engineer-in-charge.(In foundation)Godown |
| 8 | Fly Ash brick work with 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth per cum and as per direction of the Engineer-in-charge.(In foundation)Office |
| 9 | Fly Ash brick work with 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Super structure per cum and as per direction of the Engineer-in-charge.(In SS)(Godown (upto 3mt ht)) |
| 10 | Fly Ash brick work with 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Super structure per cum and as per direction of the Engineer-in-charge.(In SS)(Office) |
| 11 | Fly Ash brick work with 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Super structure per cum and as per direction of the Engineer-in-charge.(In SS)(Godown (above 3mt ht)) |
| 12 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floor(A)Column Base/ Footing(Godown) |
| 13 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floor(A)Column Base/ Footing(Office) |
| 14 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorB.Plint beam(Godown) |
| 15 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorB.Plint beam(Office) |
| 16 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorC.Column(upto 3.0 ht)(Godown) |
| 17 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorC.Column(upto 3.0 ht)(Office) |
| 18 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorC.Column(upto 3.0 ht)Godown( above 3mt ht) |
| 19 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorD.Lintel bend(Godown) |
| 20 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorD.Lintel bend(Office) |
| 21 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorE. Chajja(Godown) |
| 22 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorE. Chajja(Office) |
| 23 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorF. Wall beam(Godown( upto 3mt ht)) |
| 24 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorF. Wall beam(Godown( above 3mt ht)) |
| 25 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorG. RCC roofslabGodown( upto 3mt ht) |
| 26 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorG. RCC roofslabOffice |
| 27 | R.C.C. work M-20) using 20mm & down size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge.Ground floorG. RCC roofslabGodown( above 3mt ht) |
| 28 | Supplying cutting, bending, Straightening, placing & binding of TMT Bars reinforcement complete as per Drawing and technical specification and as per direction of the Engineer-in-charge. (Godown) |
| 29 | Supplying cutting, bending, Straightening, placing & binding of TMT Bars reinforcement complete as per Drawing and technical specification and as per direction of the Engineer-in-charge. (Office) |
| 30 | Supplying cutting, bending, Straightening, placing & binding of TMT Bars reinforcement complete as per Drawing and technical specification and as per direction of the Engineer-in-charge. (Above 3.0 m height) |
| 31 | Cement concrete (1:2:4) with 12 mm size hard crusher broken granite chips(Godown) |
| 32 | Cement concrete (1:2:4) with 12 mm size hard crusher broken granite chips(Office) |
| 33 | Providing 12mm thick cement plaster with cement mortar (1:6) including cost. Conveyance, royality and taxes of all materials, labour T&P etc. complete including watering , curing for required period as per specification and as per direction of the Engineer-in-charge.(a)Ground floor(Godown (upto 3mt ht)) |
| 34 | Providing 12mm thick cement plaster with cement mortar (1:6) including cost. Conveyance, royality and taxes of all materials, labour T&P etc. complete including watering , curing for required period as per specification and as per direction of the Engineer-in-charge.(a)Ground floor(Office) |
| 35 | Providing 12mm thick cement plaster with cement mortar (1:6) including cost. Conveyance, royality and taxes of all materials, labour T&P etc. complete including watering , curing for required period as per specification and as per direction of the Engineer-in-charge.(a)Ground floor(Godown (above 3mt ht)) |
| 36 | Providing 16mm thick cement plaster with cement mortar (1:6) including cost, conveyance, royality and taxes of all materials, labour T&P etc. complete including watering, curing for required period as per specification and direction of the Engineer-in-charge.(Godown (upto 3mt ht)) |
| 37 | Providing 16mm thick cement plaster with cement mortar (1:6) including cost, conveyance, royality and taxes of all materials, labour T&P etc. complete including watering, curing for required period as per specification and direction of the Engineer-in-charge.(Office) |
| 38 | Providing 16mm thick cement plaster with cement mortar (1:6) including cost, conveyance, royality and taxes of all materials, labour T&P etc. complete including watering, curing for required period as per specification and direction of the Engineer-in-charge.(Godown (above 3mt ht)) |
| 39 | 6mm thick celling plaster(1:4) over RCC surface including all cost and conveyance, royalty, taxes of all materials etc. complete as directed by the Enginner in Charge.(Godown (upto 3mt ht)) |
| 40 | 6mm thick celling plaster(1:4) over RCC surface including all cost and conveyance, royalty, taxes of all materials etc. complete as directed by the Enginner in Charge.(Office) |
| 41 | 6mm thick celling plaster(1:4) over RCC surface including all cost and conveyance, royalty, taxes of all materials etc. complete as directed by the Enginner in Charge.(Godown (above 3mt ht)) |
| 42 | Supplying fitting & fixing of M.S shutter of approved of approved design made out of M.S angle and sheet of approved specification including all cost , labour, carrige etc. compete. ( market rate)Godown |
| 43 | Supplying fitting & fixing of M.S shutter of approved of approved design made out of M.S angle and sheet of approved specification including all cost , labour, carrige etc. compete. ( market rate)Office |
| 44 | Priming one coat to wall surafce using water bound cement primer including cost, conveyance all materilas, labour and T & P etc complete.Godown (upto 3mt ht) |
| 45 | Priming one coat to wall surafce using water bound cement primer including cost, conveyance all materilas, labour and T & P etc complete.Office |
| 46 | Priming one coat to wall surafce using water bound cement primer including cost, conveyance all materilas, labour and T & P etc complete.Godown (above 3mt ht) |
| 47 | Wall painting two coats with Plastic Emulsion paint of approved shade including cost of materials & Labours etcGodown (upto 3mt ht) |
| 48 | Wall painting two coats with Plastic Emulsion paint of approved shade including cost of materials & Labours etcGodown (above 3mt ht) |
| 49 | Finishing wall surface with two coats of weather coat over a coat of cement priming including cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes etc all completes in all respects as per the direction of Engineer charges.Godown (upto 3mt ht) |
| 50 | Finishing wall surface with two coats of weather coat over a coat of cement priming including cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes etc all completes in all respects as per the direction of Engineer charges.Office |
| 51 | Finishing wall surface with two coats of weather coat over a coat of cement priming including cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes etc all completes in all respects as per the direction of Engineer charges.Godown (above 3mt ht) |
| 52 | 20mm thick grading plaster with cement mortar (1:4) over roof slab laid to proper slope finished smooth watering and curring including cost ,conveyance, royality , taxes of all materials and labour with T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-Charge.Up to 3m height(Godown) |
| 53 | 20mm thick grading plaster with cement mortar (1:4) over roof slab laid to proper slope finished smooth watering and curring including cost ,conveyance, royality , taxes of all materials and labour with T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-Charge.Up to 3m height(Office) |
| 54 | 20mm thick grading plaster with cement mortar (1:4) over roof slab laid to proper slope finished smooth watering and curring including cost ,conveyance, royality , taxes of all materials and labour with T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-Charge.Above 3m. Height(Godown) |
| 55 | Painting two coats with enamel paint over primer including cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes etc all completes in all respects as per the direction of Engineer charges.Godown |
| 56 | Painting two coats with enamel paint over primer including cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes etc all completes in all respects as per the direction of Engineer charges.Office |
| 57 | Distempering two coats with approved shade etc(Office) |
| 58 | Fixing Vitrified tiles in floors treads or steps and landing on 20mm thick bed of cement mortar 1:4 (1cement : 4sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost of precast tiles(Godown) |
| 59 | Fixing Vitrified tiles in floors treads or steps and landing on 20mm thick bed of cement mortar 1:4 (1cement : 4sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost of precast tilesOffice |
| 60 | Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete including cost of precast tiles.Godown |
| 61 | Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete including cost of precast tiles.Office Please Enable Macros to View BoQ information |