| 1 | Appendix I- Pucca repair and maintenance to the old devaswom office building |
| 2 | Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. |
| 3 | Supplying M P hip & ridge tiles 400 mm or nearest available size |
| 4 | Supplying Ist class M.P.roofing tiles of size 410 x 235 mm or nearest available size with single groove |
| 5 | Roofing with departmental (old and new) (400mm or nearest available size M.P hip & ridge first class set in CM 1:4 including finishing the edges |
| 6 | Roofing with departmental (old and new) first class MP tiles (size 410X235 mm) or nearest available size |
| 7 | Supplying and fixing Anjily wood wrought and put up for roof members including cost and conveyance of materials etc. complete . |
| 8 | Supplying and fixing Anjily wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc. complete. |
| 9 | Supplying and fixing Dept. wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc . complete. |
| 10 | Ceiling 12 mm Anjili wood planks, planed lap jointed and wire nailed to rafters and collars including all cost of materials labour charges etc complete |
| 11 | Carpenter IInd class engaged for repairs and maintenance to the old dislocated wrought and put up including re nailing etc. complete |
| 12 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 13 | Carpenter IInd class engaged for repairs to the damaged wooden ceiling wherever necessary. |
| 14 | Carpenter IInd class engaged for repairs and maintenance to the doors and windows. |
| 15 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to thedumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : finesand) |
| 16 | Valleying with new aluminium plain sheet 0.4mm thick of 900mm wide with overlap 150mm at joints excluding planking and including nails etc. complete. |
| 17 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work |
| 19 | Varnishing with varnish of approved brand and manufacture:One or more coats with copal varnish Please Enable Macros to View BoQ information |