| 1 | Itimad-Ud-Daulla tomb, AgraSweeping & cleaning the floor area 14367.34 Sqm. daily and partly roof area 2246.42 Sqm. weekly at Itimad-Ud-Daulla tomb, Agra. as so-called Main Mausoleum, Eastern Gate, Northern Gate, Southern Gate, Baradari complex, all Pathways, River side cells, burj, forecourt, ticket booking office, C.A's office, Baby feeding Room including removal of silt/debris from drains etc. including housekeeping of 2 nos. toilet block with 3 nos. number min. Safai Karmchari /equipment including materials, equipment’s, T&P etc. during the year 2026-2027. Detail of Item for 1.00 Month:-. Unskilled Labour/Sweeping- 2 Nos. X 30 =60 Units, Nariyal broom- 4 kg., Phoose for soft broom and jala work- 04 Kg. , Sutli- .1 Kg. , Solid bamboo Rod 2\\" dia 6\\" long -02 Nos. |
| 2 | Annual Maintenance of One R.O Plant 250 Lt/Hr. running water treatment plant 01 no. Water Coolers 150/150 Lit. capacity T&P etc. installed at Itimad-Ud-Daulla, Agra. (TDS report should be submitted in every month) during the year 2026-2027. :- Scope and Maintenance - (i) Filter & membrane of R.O plant, (iii) other minor repairing as taps, electric fitting, water supply fitting and R.O plant fittings, (iii) Man power – 01 No. Expert R.O. Operator (Semi Skilled Labour), (iv) Expert Supervisor/ Engineer visit (two or more visits in a month as and when required) , (v) 01no.Water coolers150 /150 Lit capacity including stabilizer T&P etc. during the year 2026-27. |
| 3 | Housekeeping of the toilet block inner side of the monument of daily including 2 nos Indian toilet seats & 2 nos western toilet seat & 4 nos Urinal, 4 nos bash basin for Gents toilet & 2 nos Indian toilet seats & 2 nos western toilet sets, 3 nos bash basin for Ladies toilet as well as 1 nos western toilet, 1 Bash basin for physically handicap toilet seats , 2 nos western toilet seats , 2 wash basin in office area with minimum 2 Nos. Unskilled-Labour including material for cleaning from sunrise to sunset. Details of Item for 1.00 Month: - Unskilled Labour 2 Nos. X 30 = 60 Units, Phenoil 5 ltr. Cane- 5 -1Nos. duster-5 Nos. Harpic1 ltr -2 Ltr. , hand wash liquid soap dettol/ santoor 5 ltr pack- .5 , odonil 1 No. toilet Bruss-02 No. nepthalene balls 0.1 Kg. etc. (As per Analysis) |
| 4 | Mehtab Bagh,AgraSweeping & Cleaning in Mehtab Bagh, all Pathways, structure, main entrance gate, steps, East side Burji, Store room, over area front road side, Yamuna side etc. approximate area 8405.08 Sqm. Daily sweeping by manual/mechanical including removal of vegetation growth with all sweeping & cleaning materials & minimum strength 2 Nos. Unskilled labour, during the year 2026-2027. Detail of Item for 1.00 Month: Unskilled Labour / Sweeping 2 Nos. X 26 = 52 Units, Nariyal broom - 5 Kg., Solid bamboo Rod 2\\" dia 6\\" long, 1 No. , Sutli, .5 kg. , Phoose for soft broom and jala work -4 Kg. etc.) |
| 5 | Annual Maintenance of One R.O Plant 250 Lt/Hr. running water treatment plant 01 no. Water Coolers 150/150 Lit. Capacity T&P etc. installed at Mehtab Bagh, Agra. terms & condition (for Contractor ) (a) RO Plant room should be clean (b) Chemical required to be used (c) Filter to be changed as & when required(d) Maintenance of cooling system in all respect including compressor & all accessories (e) maintenance the water supply & electric supply with all accessories including submersible Pump of 1 Nos. 5 KVA &1 No 1.5 KVAwith penal & electric panel.(f) TDS report should be provided near the plant & a copy to be submitted along with bill (g) Total 1 No. R.O operator should be engaged regularly on time (h) Visit of engineer twice in a month for proper functioning of R.O plant (By Department- changing the membrane by the department when required) during the year 2026-2027. |
| 6 | Provision for Housekeeping of the toilet block inner side of the monument of daily including 2nos Indian toilet seats & 1 nos western toilet seat & 2 nos Urinal for Gents , 2 nos Indian toilet seats & 1 nos western toilet sets for Ladies as well as 1 nos western toilet seats for physically handicap toilet area with minimum 2 Nos. Unskilled-Labour including material for cleaning from sunrise to sunset. Details of Item for 1.00 Month: - Unskilled Labour 2 Nos. X 30 = 60 Units, Phenoil 5 ltr. Cane- 01 No. duster- 5 Nos., Harpic1 ltr- 2 Nos., hand wash liquid soap dettol/ santoor 5 ltr pack -.5 Ltr., odonil, 1 No. , toilet Bruss-2 No. nepthalene balls- 0.1 Kg.etc. (As per Analysis) |
| 7 | Rambagh, AgraSweeping & cleaning the floor area of Rambagh, such as called Ticket Gate, Booking office, H.A. office, Interpretation Center, Baradhari complex, all athways, Burj etc. at all of area of the monument. approximate 12330.00 Sqm. by manual / mechanical including removal of vegetational growth during the year 2026-202 .List of Materials to be supplied per Month.1- Unskilled Labour Required- 2 Nos. x 30 days =60 Unit , Nariyal broom-2.00 Kg., Solid bamboo Rod 2\\" dia 6\\" long -2 Nos., Sutli - .1 Kg., Phoose for soft broom and jala work-4 kg., Duster/Mop for cleaning -2 Nos. etc. |
| 8 | Annual Maintenance of One R.O Plant 500 Lt/Hr. runnig water treatment plant 01 no. Water Coolers 150/150 Lit. capacity T&P etc. installed at Ram- Bagh, Agra. Terms & condition (for Contractor ) (a) Changing the membrane by department when required(b) Chemical required to be used (c) Filter to be changed as & when required(d) Maintenance of cooling system in all respect including compressor & all accesories (e) maintenance the water supply & electric supply with all accesories including submersibble Pump of 1 Nos 5 KVa & 1 No 1.5 KVA with penal & electric panel.(f) TDS report should be provided near the plant & a copy to be submitted along with bill (g) Total 1 No. R.O Plant Operator (Manpower) should be engaged regularly on time (h) Visit of engineer twice in a month for proper functioning of R.O plant (By Department- changing the membrane by the department when required) during the year 2026-2027 |
| 9 | Housekeeping of 2 nos. toilet block (including 2 nos. Indian toilets, 2 Nos. Western toilet seat, 3 nos. urinal pot, toilet for disable persons for 1 no western toilet seat) with sweeping and cleaning materials daily (list enclosed) with minimum strength of Unskilled labour 2 Nos unskilled labour for sweeping cleaning & housekeeping of toilet block of monument during the year 2026-2027. Details of Item for 1.00Month: - Unskilled Labour- 2 Nos. X 30 = 60 Units, Phenoil 5 ltr. Cane- 01 No. , duster- 05 Nos., Harpic1 ltrdo -02 Nos., hand wash liquid soap dettol/ santoor 5 ltr pack- .5ltr, odonil-1 No. , toilet Bruss-2 Nos., naphthalene balls- .1 No. etc. (As per Analysis) |
| 10 | Buriya-ka-Tal ,Etmadpur, AgraSweeping, dusting & cleaning the floor & Roof area in Buriya-ka-Tal, all of area approximate 1530.41 Sqm. daily with sweeping materials including removal of vegetaional growth during the year 2026- 2027.Unskilled labour / Sweeper (1 nos. x 26 days),Narial broom-6 kg.,Sutli - 0.50 kg.,Solid bamboo 6' long - 1no.,Phoose for soft broom and jala work 2- kg (Rate including G.S.T.) |
| 11 | Chauburji, AgraUnskilled Labour for Sweeping, Cleaning & dusting of monument i.e, tanks, roof, stairs chajjas etc .approximate total Area 2949.00 Sqm. and also removal of vegetation from the monument , . During the year 2026-2027 .Unskilled labour / Sweeper (1 nos. x 26 days),Narial broom-5 kg.,Sutli - 0.25 kg.,Solid bamboo 6' long - 1no.,Phoose for soft broom and jala work 2- kg (Rate including G.S.T.) |
| 12 | Chini ka Rauza,Agra Sweeping, Cleaning & dusting of approximate total Area 2655.33 Sqm. and removal of vegetation from the monument. During the year 2026-2027. During the year 2026-2027 .Unskilled labour / Sweeper (1 nos. x 26 days),Narial sticks-4 kg,Phoose for soft broom and jala work 2.00 kg Duster - 2.00 nos.,Solid bamboo 6' long - 1no.,(Rate including G.S.T.) Please Enable Macros to View BoQ information |