| 1 | Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5sq.mm FRLS PVC insulated copper conductor single core cable in surface/recessed medium class PVC conduit, with modular switch, modular plate, suitable PVC box and earthing the point with 1.5 sq mm. FRLS PVC insulated copper conductor single core cable ete as required.Group A |
| 2 | Rewiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq mm FRLS PVC insulated copper conductor single core cable and 1.5 sq.mm FRLS PVC insulated copper conductor single core cable as earth wire in existing surface/recessed steel/PVC conduit including dismantling as required. Group B |
| 3 | Wiring for circuit submain wiring along with earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in existing surface/ recessed as required. 2X1.5 sq.mm + 1X1.5 sq.mm |
| 4 | Wiring for circuit submain wiring along with earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in existing surface/ recessed as required. 2X2.5 sq.mm + 1X2.5 sq.mm earth wire |
| 5 | Wiring for light power plug with 2X4 sq. mm FRLS PVC insulated copper conductor single core cable in existing surface/ recessed along with 1 No 4 sq. mm FRLS PVC insulated copper conductor single core cable for loop earthing as required. |
| 6 | Service wire 2X6 SQMM copper |
| 7 | Supplying and fixing two module stepped type electronic fan regulator on the existing modular plate switch box including connections but excluding modular plate etc, as required. |
| 8 | Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 volts, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, eartlı bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/isolator). 6 wav, Double door |
| 9 | Supplying and fixing 5A to 32 As rating, 240/415 volts, 10 kA, \\"C\\" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. Single pole and neutral |
| 10 | Supplying, installing. testing and commissioning of following capacity TPN tap off box made of 1.6mm thick sheet steel enclosure duly painted with powder coating on existing rising mains complete with TPN disconnector FSU and HRC fuses, connections, earthing etc. as required.63 Α ΤΡΝ |
| 11 | Supplying and fixing following modular switch socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. |
| 12 | a) 5/6 A switch |
| 13 | b) 3 pin 5/6 A socket outlet |
| 14 | c) 15/16 A switch |
| 15 | d) 6 pin 15/16 A socket outlet |
| 16 | Supply of 35 Sqmm single core Flexible Aluminum Cable |
| 17 | Supply and fixing of 300 mm Exhaust fan (Reputed brand) |
| 18 | Supply and fixing of 450 mm wall fan (Reputed brand) |
| 19 | Supply and fixing of Aluminum lugs 35 sqmım |
| 20 | Earthing with copper earth plate 600 mm X 600 mm X 3 man thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required. |
| 21 | Supply, installation, testing and commissioning of UPS with isolation transformer & battery for backup, minimum load power factor 0.8.power factor 0.99. having OVCD (over voltage cut-off device), having CVCF (constant voltage constant frequency, bypass parameters configurable. 2 stage charging(constant current/float charge). having temperature compensated charger. Fan speed control, digital signal processor controller, total harmonic distortion (current) THDi (<10%@50% R Load, Input 1 phase voltage 230v, voltage range 110-300v. Output voltage (220AC/230AC/240AC±1%), Total harmonic distortion Voltage (THDv- <3% linear load, <5% nonlinear load, 90% AC/AC efficiency, Over load capacity(105-110%: 3min, 111-130%: 30Sec), operating temperature with full load 0-40°C, communication features (RS232, USB com port. Intelligent slot(optional). UPS installation with all required material arrangements as required as per IS specification. For 60 minute backup, min. 3200 VAH |
| 22 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |