| 1 | EGP. puff panels for O.T wall walls &ceiling |
| 2 | Supply, installation, testing and commissioning of modular OT Walland corner panels with insulated prefabricated puff Panels. The OT wall shall be constructed using EGP puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of 0.80 mm thickness are firmly bonded together by sprayed -in insulating foam, which hardens during the process. The core consists of rigid polyurethane foam, which has been injected under high pressure, with a minimum density of 40kg/m3. The thickness of Puff shall be minimum 40 mm. The sheet panel shall be of indigenous reputed make and be provided with manufactures test certificate. The puff panel shall be fixed to the floor with bottom track of 1.5 mm thick steel U channel section having min size of 50mm X 50mm. The bottom shall be fixed in the floor of the OT with 10mm thicknessand min. 60 mm long SS fasteners which shall be fully threaded and power drilled. The Panels of walls and ceiling shall be tied together by suitable SS coving. The individual wall panels of wall and ceiling shall be tied together by suitable SS coving. The individual wall panels shall be welded together by SS. All joints shall be filled with metal filler and shall be sand casted on site till smooth finish is obtained. Wall & panel joints shall not be visible after the final wall coating is applied. The gap between the masonry wall surfaces and the panel of the theatre shall be sufficient for |
| 3 | G.I. puff panels for OT ceiling |
| 4 | Modular OT ceiling panels with insulated prefabricated puff Panels. The OT ceiling shall be constructed using GI puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of 0.80 mm thickness are firmly bonded together by sprayed -in insulating foam, which hardens during the process. The core consists of rigid polyurethane foam, which has been injected under high pressure, with a minimum density of 40kg/m3. The thickness of Puff shall be minimum 40 mm. The sheet panel shall be of indigenous reputed make and be provided with manufactures test certificate. The puff panel shall be fixed to the floor with bottom track of 1.5 mm thick steel U channel section having min size of 50mm X 50mm. The bottom shall be fixed in the floor of the OT with 10mm thicknessand min. 60 mm long SS fasteners which shall be fully threaded and power drilled. The Panels of walls and ceiling shall be tied together by suitable SS coving. The individual panels of wall and ceiling shall be tied together by suitable SS coving. The individual wall panels shall be welded together by SS. All joints shall be filled with metal filler and shall be sand casted on site till smooth finish is obtained. Wall & panel joints shall not be visible after the final wall coating is applied. The gap between the masonry wall surfaces and the |
| 5 | Antibacterial / Antifungal Paint. |
| 6 | Providing and establishing anti-bacterial & anti fungicidal sterile coating of liquid plastic paint on GI Puff/SS panel of modular OT. The paint should be seamless, easy to clean, should have vapor permeability which allows substrate moisture to escape and protects against growth of bacteria, mound and yeasts, moisture resistance, freeze / thaw resistance. Anti- bacterial anti microbial quality should remain active throughout the life of the product. Vapors permeable structure should allow damp substrates to dry out without causing blistering. It should tolerate cleaning with hospital chemical agents. Filling of all joints and cavities should be with metallic epoxy filler and sand casted flush to provide a joint-less finish. This should include all fittings, accessories, hardware, support structures, etc. required for installation. Anti-bacterial and anti-fungus sterile coating shall be applied on the finished walls & ceiling with at least 2-3 coats to achieve a thickness of minimum 200 micron. Before application of sterile wall coating an appropriate primer shall be applied. The primer shall be supplied along with the paint and should be of the same make as that of paint. and shall be applied prior to coating of anti-bacterial & anti- fungus sterile paint on walls & ceiling 2-3 coats shall be applied to achieve a thickness of 200 |
| 7 | Laminar Air Flow |
| 8 | The range of ventilated ceiling should provide the sterility and cleanliness required for OT environ ment. Perfect tightness should be guaranteed by a n epoxy seal between filters and holding structure disabling “by pass†of HEPA filters. Two nos . pressure measurement ports shall be provided in each HousingAirflow: 50 +-10% FPM Class 100/ISO c lass 5 as per international standard & meets DIN 1 946-4. D.O.P. tested point to p oint scanned MINIPLEAT HEPA FILTERS having followi ng technical specifications to be fixed in above H ousings F rame – Aluminium. Type – Flange Type. Media – Micro Fiber Glass . Se aling of media – By means of epoxy. I.P.D. -< 15 mm WG. F.P.D. – 50 mm WG. Separators – Concealed Al. or Hot melt G lue. Capacity – 500 CFM Size of LAF - 2400 x 2400 mmThe work should be executed as per the direction of Enginee r in charge |
| 9 | Homogeneous Conductive PVC Vinyl Flooring in O.T.,ICU,OPD. |
| 10 | Providing and fixing 2 mm thick homogeneous conductive PVC JEOFlor Electro + SD Roll acts as a Continous Conductive 10^6 |
| 11 | Writing White Board. |
| 12 | Supply & Installation of writing unit/white boardof size 900/600 mm having 1.60 mm thick white laminate board top, bonded to a 40 mm high density fiber board sheet for additional rigidity. The unit should open to create a wall mounted writing surface within the operating room. The work should be executed as per the direction of Engineer-in-Charge. |
| 13 | Storage Unit . |
| 14 | Supply and installation of storage unit of SS 304of reputed make and having size 1665 x 865 x350 mm and having two or more glass shelves of toughened glass 10 mm thick, supported with D type bracket (SS 304 grade) with 10 mm thickness and rubber gasket of 2mm and mounted flush on wall. The work should be executed as per the directions of Engineer-in-Charge. |
| 15 | Pressure Release Damper. |
| 16 | Supply, installation, testing & commissioning of SS Fabricated Cascade pressure stabilizer having SS blades to control Operation Theatre Room - Air Pressure of approved make as per tech. specs attached. |
| 17 | Peripheral Lights (Dimmable). |
| 18 | Supplying & fixing of sturdy writing board of size: 840mm x 640mm with perfect marker writing surface in front and back is laminated to make water proof surface. The board has to be provided with anodized aluminium framing and its back should have hooks for wall hanging of approved make and type directly on wall |
| 19 | AHU With Outdoor Unit AC 11.5 Tr including Insttalation |
| 20 | DOUBLE SKIN AIR HANDLING UNIT :Supply, installatio n, testing and commissioning of double skin constr uction AIR HANDLING UNITS. With inner Sheet SS 304 and Ouer sheet PPGI with 40 mm Panel Thickness with mixing box with FA,RA,SA dampers, fitted with 2 stage filteration arrangment completed with 10 micron filters 5 mico nfilter after fan section. suitable for outdoor in stallation with 45 mm thick panels with inner skin 0.6mm thick aluminium sheet, thermal breack and w eather proof.Motor Efficiency Factor - IE-2â– Mix ing box with manually operated fresh & return air AL dampers.â– Filter section with 50 mm thick box type pre-filter (MERV-8) & 305 mm thick rigid med ia type fine filter (MERV-10) mounted on a common filter frame & Viscous/ wasable synthetic type air pre-filterâ– Coil section with 8 Row deep DX coi l . Fin Material - Plain Aluminium Fin spacing - 1 1-13 FPI, Condensing tray - 22G SS304, Test Pressu re - 38Kg/Sq.cm. Insulation Material for Drain Tra y-13mm thick close cell Nitrile Rubber.â– UV Lamp |
| 21 | Aluminum Ductiing 22 Gaze |
| 22 | Ducting : ( Al. sheet metal )Ducting:- Supply and fixing of site fabricatedAl sheet metal ducts in a ccordance with theapproved shop drawings and as re quired as per specifications.All necessary GI /MS supports using thread rods (as directed). Angle, f lat, and anchor bolts, food grade neoprene gaskets , food grade adhesive included in the scope. |
| 23 | Insulation |
| 24 | UNDERDECK INSULATION :Supplying and fixing of unde rdeck roof insulation of 13 mm thickness of mat fi nish closed cell Antimicrobile nitrile rubber ( cl ass 'O' ) insulation on existing surface after app lying two coats of cold setting adhesive as requir ed. |
| 25 | Surgical Scrub (2 Bay). |
| 26 | Supplying, fixing installation, testing andcommissioning of scrub sink with the following specifications:- Compact surgical scrub sink should be designed for use in OT complex for pre procedural scrub up. (Double sink combination size 1600 mm X 450mm X 1650 mm back height& 1200 mm and front heightas suitable) • Each fixture should be fabricated from heavy gauge type 304 stainless steel (minimum thickness1.5mm) and should be seamless welded construction, polished to a satin finish • The scrub sink should be provided with a front access panel which should be easily removed for access to the water controlled valve, waste connections, stoppers and strainers.• Hands free operation should include infra-red sensors with programmable adjustment.• Thermostatic mixing, valve control should be located behind the access panel and maintain constant water temperature.• Timing should be adjustable to meet individual application requirements.• Provided with infrared sensors, thermostatic control taps with feel safe temperature controls with foam flow attachments and provide with Betadine dispensers .• All units should have reduced anti- splash fronts. • Knee/foot operated switch should be provided additionally. The work |
| 27 | Sliding Type Hermitically sealed OT Door (Autometic) |
| 28 | Supply & fixing of sliding type OT door having high density particle board cores, high pressure laminate face on both sides, viewing window 300 x 300mm. Standard Size: 1500 x 2100 mm (W x H) |
| 29 | Surgeon Control Panel. |
| 30 | Supply, installation, testing & commissioning of multi colour coded Surgeon Control Membrane Touch Panel, flushed in the theatre wall comprising of the following features & as per technical specification attached:1. Display of Day Clock2. Display of Elapse Time Clock3. Dimmer for peripheral lights4. Medical Gas Alarm5. Hands free telephone6. Indicator for temperature & Humidity. |
| 31 | X-Ray View Screen. |
| 32 | Supply, installation, testing & commissioning of Twin Plate X- Ray viewing screen designed to provide a high level of control luminance without Flickering & as per the technical specification attached.X-ray view screen (two screen) LED Overall dimensions (LxHxT) 880 x 503 x 29mm View area (WxH) : 736 x 440 mm Light source : LED Power consumption / input power : 30W / AC 100-240V Illumination intensity : 5,500 LUX approx. |
| 33 | Surgeon Pendent |
| 34 | Providing & fixing of Singale arm multi moveable surgeons pendant with load carrying capacity of 80Kg and rotational values of 330-340 degree with adjustable stopper. The pendent should be designed with service head to host, base, gas module, electric modular and shelves upto 8 gas outlets & 10 Electrical switches. Racks & Shelves should be provided to mount the equipments like monitor etc. The surgeon pendent should have two arms |
| 35 | Anaesthesia Pendant . |
| 36 | Providing & fixing of single arm (900mm) anaesthesia pendant with load carrying capacity of 80Kg and rotational values of 330-340 degree with adjustable stopper. The pendent should be designed with service head to host, base, gas module, electric modular and shelves upto 8 gas outlets & 10 Electrical switches. Racks & Shelves should be provided to mount the equipments like monitor etc. The surgeon pendent should have two arms |
| 37 | Anaesthsia Trolley: Made of Composite Laminate - overall size 950mmx600mmx570mm H - ' Cosmokartz or equivalent |
| 38 | Eye OT Table Opthal OT Table |
| 39 | Cognate SS- is a sophisticated yet economical Operating Table Remote Control specially designed for 'C' ARM Image Intensifier. Its unique design permits it to excel over competitive offering in the areas of Micro-Neuro, Orthopaedics, Cardiovascular, Ob/Gyn, Ophthalmology, ENT, Urology and other major or minor operations, The Electro- Mechanical driving mechanism assures smooth and quiet movements of the Table Top. The Table Top is made of Radio-Translucent material for Fluroscopic capability, Operating Positions including Height Adjustment, Trendelenberg, Reverse Trendelenberg, Lateral Tilt and Back Section can be controlled quickly and accurately with the help of lightweight Hand Control Unit, The excentrically positioned Table Top, without cross members, to optimize image intensifier accessibility for both A/P & Lateral Exposures Standard Accessories L-shaped Anaesthetic Frame Shoulder Support with Pad Arm Board with S.S Top Lateral Support with pad Wrist Strap Knee Crutches Goepal Type Water proof Rubber Mattress1 Pc.1 Pair2 Pcs.1 Pair1 Pair1 Pair1 Set |
| 40 | Instrument Trolley fully SS - double shelf, three sides railings., mounted on 5\\" diawheels , two with brakes, size 30\\"x18\\"x36\\"H all 304GSS |
| 41 | LED Operating Light |
| 42 | Providing & installation of LED operating light having Maximum illuminance (1m): 160,000 + 160,000 Lux at 1m distance, Electrical power: 150 + 90 W, Power consumption: 2x 11 A, Fitting: Ceiling anchoring ring ceiling pendant with 2 brackets and 2 spring arms, Range of movement: 1x 360° / 1x 330°, Recommended room height: at least 2.45 m, Max. ceiling load: 2x 218 Nm / 650 N, Light body weight: 9.2 + 7.5Kgs, Light body depth: 1x 130 cm / 1x 140 cm, Air shielding surface: 2 x 330 cm2 Transformers: 2x 450VA/230V/26V, Brightness regulator: 2x 20 – 500 VA (primary voltage), Provided with 2 Sterilisable handles with each dome, Easy positioning by sterilisable handle, Focus adjustable by sterilisable handle, Life time of Bulbs : 45,000 hours etc as per technical specifications attached |
| 43 | Electrical works & Distribution Board : Supply laying, fixing and testing of flexible copper wire thick 2.5mm single core for equipment,electrical power control , lights, as per requirement |
| 44 | Floor Mate (ICU/OT Grade) Paint should not react with betadine (Yellow patch of Betadine one floor looks very ankwred) |
| 45 | Glove Box |
| 46 | Multiple Electric Plug Points (65A) for CARM lithoclast Lap Tower with complete electrical fittings. |
| 47 | Add 18% GST (In Basic Rate must fill 0.18) |
| 48 | Add 1% Labour cess (In Basic Rate must fill 0.01) Please Enable Macros to View BoQ information |