|
| 1 | Servicing & checking of Laundry plant including washer, hydra and extractor and it's accessories complete with the following : - (a) To check the All controller switches, selector switch, indicators, main panel, etc. (b) To check the complete Main switch panel, contactors, electrical and mechanical spares. (c) To check the power supply source. (d) Testing of entire laundry plant without load and with load. (e) To check all system components reliable or obsolete. Note: Checking will be carried out by OEM After replacement of the all defective components, Testing and functioning of system should be carried out satisfactorily. (a) Supply in repair 0-60 timer |
| 2 | Supply in repair 0-15 timer, complete all as specified and directed. |
| 3 | Supply in repair Off delay timer, complete all as specified and directed. |
| 4 | Supply in repair water pressure switch, complete all as specified and directed. |
| 5 | Supply in repair contactor NO 18 Amp, complete all as specified and directed. |
| 6 | Supply in repair 30 Kg washing bearing 22208, complete all as specified and directed. |
| 7 | Supply in repair 30 Kg washing sleeve H-308, complete all as specified and directed. |
| 8 | Supply in repair 16mm gland dori 1 mtr, complete all as specified and directed. |
| 9 | Supply in repair breake pale assembly, complete all as specified and directed. |
| 10 | Supply in repair reverse and forward controller, complete all as specified and directed. |
| 11 | Supply in repair 30 Kg hydro rubber buffer gasket, complete all as specified and directed. |
| 12 | Supply in repair Hydro spring, complete all as specified and directed. |
| 13 | Supply in repair 6 mm pneumatic pipe 2 mtr with gland, complete all as specified and directed. |
| 14 | Supply in repair 3 mtr door gasket with SR 555, complete all as specified and directed. |
| 15 | Supply in repair dryer heater 24 inch, complete all as specified and directed. |
| 16 | Supply in repair drier lupping, complete all as specified and directed. |
| 17 | Hydro Extractor motor rewinding, complete all as specified and directed. |
| 18 | Supply in repair Hydro Extractor bottom cover sheet including all accessories, complete all as specified and directed. |
| 19 | Comprehensive maintenance and servicing of existing size of AHU CHS plant and checking of Blower drum, Pulley, shaft, bearing, ) of and taking out old unsv, complete all as specified and directed.Note: Blower drum, Shaft, Bearing and pulley will be paid separately. |
| 20 | Taking out the blower drum shaft and drum assembly from the CHS plant AHU of existing, welding and grinding on Lathe to make suitable alignment with bearing and refixing, complete all as specified and directed. |
| 21 | S&F blower motor of AHU of capacity 3 HP copper winding as per existing gauge of super enameled copper winding including fixing and making alignment of existing shaft, complete all as specified and directed. |
| 22 | All as per Srl item No 21.00 above but for 5HP blower motor, complete all as specified and directed. Note Item No 21 to 27 deposit AGE E/M store |
| 23 | S&F blower drum, blower shaft , bearing and motor assy complete for CHS AHU unit of existing capacity make and taking out oldunsv, complete all as specified and directed. |
| 24 | S&F Blower drum for CHS AHU unit of existing capacity make and taking out old unsv, complete all as specified and directed. |
| 25 | S&F runner shaft for AHU drum as per existing size and making cut etc with lathe work including and taking out of shaft, complete all as specified and directed. |
| 26 | S&F bearing for shaft from existing AHU drum as per existing size and taking out of old unsv, complete all as specified and directed. |
| 27 | S&F pulley for blower of existing AHU drum as per existing size and taking out of old unsv, complete all as specified and directed. |
| 28 | M&L for taking out burned winding of 3HP blower motor of AHU and rewinding with new winding as per existing gauge of super enameled copper wire including making alignment of shaft (all lathe work), providing new bearing of existing bus, complete all as specified and directed.Note: Bearing will be paid separately. |
| 29 | All as per Srl item No 28.00 above but for 5HP blower motor, complete all as specified and directed. |
| 30 | S&F V belt of size B-31/32/34/36, complete all as specified and directed.Make: Fenner /Dunlop as approved by GE. |
| 31 | S&F V belt of size B-63/64, complete all as specified and directed. Make : Fenner / Dunlop as approved by GE. |
| 32 | S&F canvas cloth in between AHU and Hot air duct of CHS plant after removing the unserviceable cloth, complete all as specified and directed. |
| 33 | S&F in repair 3 way Actuator valve assembly operating on 230 volts, AC, existing model as per sample for suitable existing CHS Plant with & including replacing defective wiring, connected minor items, complete all as specified and directed. |
| 34 | S&F in repair Air filter as per sample for AHU of central heating system plant of existing, complete all as specified and directed. |
| 35 | S&F in repair meter gauge for temperature suitable for water pipe line as per sample, complete all as specified and directed. |
| 36 | M&L for taking out the damaged insulation portion of existing inside AHU room, fixing of glass wool alongwith aliminuim sheet/foil and chicken wire mesh, etc as per requirement suitable for fixing match with existing on wall/ duct, complete all as specified and directed. |
| 37 | M&L for taking out the damaged insulation portion of existing outside/inside duct, copper pipe etc, cleaning the duct/pipe, applying two coats of CPRX compound to cleaned portion of duct, fixing of 15 mm thick nitrile rubber along with out side aluminium coating and making good the disturbed portions, complete all as specified and directed. |
| 38 | S&F in repair pressure gauge 0-100 kg/cm2 suitable for condenser water pipe line, complete all as specified and directed. |
| 39 | S&F FCU 5000 CFM (Fan coil unit with motor as per existing model including taking down, complete all as specified and directed. |
| 40 | All as per Srl item No 39.00 above but for 3000 CFM, complete all as specified and directed. |
| 41 | S&F in repair Voltmeters digital type 0 to 500 Volt AC +/- 0.1 accuracy ,3 phase, 415 V including making necessary connections complete all as specified and as directed. Make L&T |
| 42 | S&F in repair Ammeters digital type 500A, +1.0 accuracy, 3 phase, 415 V direct type including making necessary connections, complete all as specified and directed. |
| 43 | S&F in repair selector switch for ammeter, voltmeter and necessary connections, complete all as specified and directed. |
| 44 | M&L for shifting/ relocating the existing 250 mm GI pipe ( up to 15 RM ) for fire hydrant pipeline from main line to near retaining wall, including necessary cutting and threading/welding and proper jointing to ensure leak proof, dismantling of old supports, and providing new supports with angle iron or PCC as per sire requirement, complete all as specified and directed. Note: PCC/ Angle iron will be measured and paid separately. |
| 45 | Comprehensive maintenance and repair including renewal/ replacement and installation of defective parts of all existing fire detection system complete consisting of addressable/ Conventional/ Remote terminal fire control panels, smoke/heat detector, response indicator, sounder, Manual call Point, Loop isolator, Zone monitor module, Modem, Fire control panel, etc. Located in entire Hospital area to make them serviceable incl checking of fire detector, checking the batteries and its connections, alarm system and its functions, functionality of fire control panel to be inspected and checked for its functionality and to make functional in all respect and if any defect observed to rectify it, complete all as specified and directed. Note:- (i) Cost of new components shall be paid separately under relevant items. (ii) Contractor's rep shall visit and to check all fire panel and system to check its functionality and to make them functional. if any defect observed. |
| 46 | Servicing of all multisensor detector with heat and smoke combination photoelectric (50 Nos)after taking down from its position and refixing after servicing as per OEM instructions , checking and testing its functionality, tracing and clearing any fault observed including cleaning detectors through air blower on site complete all as specified and directed. |
| 47 | Supply in repair of 12 V, 7 AH battery for back up to all FACP panel, complete all as specified and directed. Make: Exide/Amar Raja. |
| 48 | Supply in repair Optical conventional smoke detector 300 series,LPCB, complete all as specified and directed. Make:- Agni / System Sensor / GST. |
| 49 | Supply in repair RoR conventional Thermal detector 300 series, LPCB, complete all as specified and directed. Make:- Agni / System Sensor / GST. |
| 50 | Supply in repair conventional MCP ,Red colour with LED 470 ohms, with back box and surface mounting box red colour, complete all as specified and directed.Make:- Agni / System Sensor / GST. |
| 51 | Supply in repair conventional Horn cum trobe, wall mounted, red colour, complete all as specified and directed.Make :- Honeywell / Agni . |
| 52 | Supply in repair conventional Remote response indicator ABS body with dual LED, complete all as specified and directed. Make :- Honeywell / Agni . |
| 53 | Supply in repair Main Board (CPU) for fire panel of make Agni, complete all as specified and directed. |
| 54 | Supply in repair Transistor with heat sink for fire panel of make Agni, complete all as specified and directed. |
| 55 | Supply in repair Addressable Fire alarm Control Panel as per sample, complete all as specified and directed. |
| 56 | Supply in repair ELCB 2pole as per existing at Lift room including all accessories, complete all as specified and directed. |
| 57 | Supply in repair 12 Watt, 230 volts square lamp suitable for Lift cabin including all connection and accessories, complete all as specified and directed. |
| 58 | Supply, Fixing and testing in repair Microprocessor with & including display, relay circuit, sensors & display cable for CENTRAL HEATING PLANT units of capacity AHU including making all electrical connections, complete all as specified and directed. Make : Soft hand or equivalent |
| 59 | S&F in repair 25 A capacity 3 Pole Power contactor (AC 3 Rating 25Amp, AC 1 Rating 45 Amp) with aux 1 NO contact & 1 NC contact including making all necessary connections, complete all as specified and directed.Make: L&T/ Havells/ C&S |
| 60 | S&F in repair 32 A capacity 3 Pole Power contactor (AC 3 Rating 32 Amp, AC 1 Rating 55 Amp) with aux 1 NO contact & 1 NC contact, complete all as specified and directed. Make: L&T/ Havells/ C&S |
| 61 | Repair and servicing crank case heater (Dehumidifier) of existing size of AHU CHS plant and taking out old unsv, complete all as specified and directed. |
| 62 | S&F copper pipe of size 7/8\\" with elbow and sockets, complete all as specified and directed. |
| 63 | S&F copper pipe of size 5/8\\" with elbow and sockets, complete all as specified and directed. |
| 64 | Supply in repair MCCB 4 Pole, 415 V, Adjustable type, 160 Amps with breaking capacity 36 KA complete all as specified and directed. |
| 65 | S&F MCCB with Thermal - magnetic release of 125-160 Amps, 3 Pole, 415V, 36 kA, Ics=100%Icu with adjustable over load setting and adjustable short circuit setting including all accessories like spreader terminals and separator ,etc. and taking down old unserviceable one, complete all as specified and directed.Make : L&T Cat Part No. CM9200808OOM1OG or equivalent in Schneider/ Legrand |
| 66 | M&L for PCC 1:2:4, type B-1, using 20mm graded crushed stone aggregate slab flooring, bedded, and jointed in cement mortar 1:6 and pointed in cement mortar 1:3 will be used for road cutting, etc., complete all as specified and directed. |
| 67 | S&F joist, channel, angle, or tee sections, fixed independently with welding, without connecting plates, etc. cut to ordinary lengths i.e. within 20mm of the length indicated of Fe-410W, Gde E-250, quality-B, against worn out channel, angle iron etc., complete all as specified and directed . Please Enable Macros to View BoQ information |