|
| 1 | Material-Lines&Cable Decentralised.A1 |
| 2 | CLAMP FOR CHANNEL |
| 3 | 11 KV CROSS ARM HOLDING CLAMP |
| 4 | F- BRACKET(Ex GST) |
| 5 | DEAD END CLAMP WITH EYE HOOK(Ex GST) |
| 6 | SUSPENSION CLAMP WITH EYE HOOK(Ex GST) |
| 7 | Stay Clamps |
| 8 | TOP CHANNEL |
| 9 | DROPPER CHANNEL 100*50*1028MM |
| 10 | CLAMP FOR CHANNEL |
| 11 | S/S BASE ANGLE 75*75*6*2028MM WITH CLAMP NUT BOLT |
| 12 | T-OFF CHANNEL |
| 13 | LT DISRIBUTION BOX (3 PHASE) WITH CLAMP |
| 14 | 1*16 SQMM XLPE CABLE |
| 15 | PIERCING CONNECTOR |
| 16 | Material-Plant and Machinary (Decentralised.B2) |
| 17 | AL LUG 70SQMM(Ex GST) |
| 18 | LT FUSE SET with Box |
| 19 | ALL LUG 150MM((Ex GST)) |
| 20 | Taillles unit with Canopy (with 12 Lug,copper Busbar 500*500*5mm-03 Nos,Alum Plate 500*50*5 mm 01 No,Fuse wire 3Kg 8/10 SWG)Ex Gst |
| 21 | LUG 240 SQMM(Ex GST) |
| 22 | ALUMINUM LUG 400MM (Ex GST) |
| 23 | WORK DETAILS AND RATES(EXCLUDING GST)(उक्त कार्य के निष्पादन मे प्राक्कलन एवं इस सूची मे दर्ज सामग्री के अतिरिक्त यदि कोई अन्य टी एंड पी आइटम/ विकेंद्रीयकृत सामग्री की आवश्यकता पड़ती है तो कार्यदायी संस्था द्वारा उपलब्ध कराते हुये कार्य को ससमय पूर्ण करा लिया जायेगा एवं कोई अतिरिक्त धनराशि देय नहीं होगी ) |
| 24 | Carriage of Conductor/Material From Store To Site |
| 25 | Carriage of of PCC Pole From Store To Site |
| 26 | Carriage of 25 KVA Distrubution Transformer From Store To Site |
| 27 | Carriage of 63 KVA Distrubution Transformer From Store To Site |
| 28 | Carriage of 100 KVA Distrubution Transformer From Store To Site |
| 29 | Carriage of 250 KVA Distrubution Transformer From Store To Site |
| 30 | Carriage of 400 KVA Distrubution Transformer From Store To Site |
| 31 | Returning of 25 KVA Distrubution Transformer From Site to store |
| 32 | Returning of 63 KVA Distrubution Transformer From Site to store |
| 33 | Returning of 100 KVA Distrubution Transformer From Site to store |
| 34 | Returning of 250KVA Distrubution Transformer From Site to store |
| 35 | Returning of 10KVA Distrubution Transformer From Site to store |
| 36 | Returning of 16KVA Distrubution Transformer From Site to store |
| 37 | Mounting of 25KVA Distribution Transformer at DP/ with Channel and Clamp |
| 38 | Mounting of 63 KVA Distribution Transformer at DP/ with Channel and Clamp |
| 39 | Mounting of 100 KVA Distribution Transformer at DP/ with Channel and Clamp |
| 40 | Mounting of 250 KVA Distribution Transformer at Plinth with Channel and Clamp |
| 41 | Mounting of 400KVA Distribution Transformer at DP/ with Channel and Clamp |
| 42 | Laying of New ABC(3X50+1X35+1X16) With all Accessories |
| 43 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 44 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 45 | Construction of Transformer plinth for 250 KVA Transformer of 2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials. |
| 46 | Fencing of T/F with M.S. Square mesh welded/fixed on M.S. Angle of size 65x65x6 mm with gate hinges & shutter assembly, of over all size 3x3x2.5 mtr as per drawing |
| 47 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering |
| 48 | Erection of Sectional Double Pole Structure of ST pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets with materials & other required works. |
| 49 | Erection of single support ST/PCC pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work. |
| 50 | Earthing of Poles/DT |
| 51 | Intallation Of Tailles unit with Proper Grouting and Earthing as Per RESSPO Norms |
| 52 | Installtion of LT Fuse set Box Please Enable Macros to View BoQ information |