|
| 1 | DEPLOYMENT OF MAN POWER | DEPLOYMENT OF MAN POWER |
| 2 | Painting Work in HVAC System | Painting Work in HVAC System |
| 3 | Servicing of AHU's | Servicing of AHU's |
| 4 | Servicing of VFD, Pan Humidifier, PLC, | Servicing of VFD, Pan Humidifier, PLC, |
| 5 | Servicing of Cooling Tower | Servicing of Cooling Tower |
| 6 | Supply of various type roller bearing | Supply of various type roller bearing |
| 7 | Supply of Butterfly valve 125mm | Supply of Butterfly valve 125mm |
| 8 | Supply of MS pipe 150mm | Supply of MS pipe 150mm |
| 9 | Supply of Butterfly valve 150mm | Supply of Butterfly valve 150mm |
| 10 | Supply of MS pipe 125mm | Supply of MS pipe 125mm |
| 11 | Fabrication,Supply of Duct | Fabrication,Supply of Duct |
| 12 | ROBOTIC VAC DUCT CLEANING FOR AC SYSTEM | ROBOTIC VAC DUCT CLEANING FOR AC SYSTEM |
| 13 | Servicing of primary chilled water pumps | Servicing of primary chilled water pumps |
| 14 | Servicing of Secondary chilled water | Servicing of Secondary chilled water |
| 15 | Sericing of Condensor water pumps set | Sericing of Condensor water pumps set |
| 16 | Shift O&M of 33 kV Sub-station/LT MCCs | Shift O&M of 33 kV Sub-station/LT MCCs |
| 17 | Maintenance of Electrical System in PMI | Maintenance of Electrical System in PMI |
| 18 | Supply of 20W LED batten | Supply of 20W LED batten |
| 19 | Supply of 16A Modular Socket | Supply of 16A Modular Socket |
| 20 | Supply of 16/20A 3 pin plug | Supply of 16/20A 3 pin plug |
| 21 | Supply of 16A 1 way switch Modular Piano | Supply of 16A 1 way switch Modular Piano |
| 22 | LT MOTOR(<=2.2KW)-Rewdg | LT MOTOR(<=2.2KW)-Rewdg |
| 23 | LT MOTOR(>2.2-5.5KW)-Rewdg | LT MOTOR(>2.2-5.5KW)-Rewdg |
| 24 | LT MOTOR(>5.5-18.5KW)-Rewdg | LT MOTOR(>5.5-18.5KW)-Rewdg |
| 25 | SOLAR PLANT MAINTENANCE | SOLAR PLANT MAINTENANCE |
| 26 | Filteration of Transformer oil | Filteration of Transformer oil |
| 27 | Supply of Transformer oil | Supply of Transformer oil |
| 28 | Decorative lighting of PMI Building | Decorative lighting of PMI Building |
| 29 | Supply of 20/22 W LED bulb | Supply of 20/22 W LED bulb |
| 30 | Hiring of Loading vehicle | Hiring of Loading vehicle |
| 31 | Supervisior (Mandays) - As and when required | Supervisior (Mandays) - As and when required |
| 32 | Electrician Technical (Mandays) - As and when required | Electrician Technical (Mandays) - As and when required |
| 33 | CMCS of 1.5 Ton AC | CMCS of 1.5 Ton AC |
| 34 | CMCS of 1.0 Ton AC | CMCS of 1.0 Ton AC |
| 35 | CMCS of 2.0 Ton AC | CMCS of 2.0 Ton AC |
| 36 | CMCS of 1.5 Ton window AC | CMCS of 1.5 Ton window AC |
| 37 | CMCS of 4.0 Ton AC | CMCS of 4.0 Ton AC |
| 38 | CMCS of water coolers | CMCS of water coolers |
| 39 | CMCS of Deep Freezers | CMCS of Deep Freezers |
| 40 | Repair of 1.0 ton compressor | Repair of 1.0 ton compressor |
| 41 | Repair of 1.5 ton non-inverter compressor | Repair of 1.5 ton non-inverter compressor |
| 42 | Repair of 2.0 ton non-inverter compressor | Repair of 2.0 ton non-inverter compressor |
| 43 | Replacement of condenser coil in 1.0 Ton/ 1.5 Ton/ 2.0 Ton split AC | Replacement of condenser coil in 1.0 Ton/ 1.5 Ton/ 2.0 Ton split AC |
| 44 | Replacement of cooling coil in 1.0 Ton/ 1.5 Ton/ 2.0 Ton split AC | Replacement of cooling coil in 1.0 Ton/ 1.5 Ton/ 2.0 Ton split AC |
| 45 | Replacement of condenser coil in 1.0 Ton/ 1.5 Ton/ 2.0 Ton window AC | Replacement of condenser coil in 1.0 Ton/ 1.5 Ton/ 2.0 Ton window AC |
| 46 | Replacement of cooling coil in 1.0 Ton/ 1.5 Ton/ 2.0 Ton window AC | Replacement of cooling coil in 1.0 Ton/ 1.5 Ton/ 2.0 Ton window AC |
| 47 | Dismantling, shifting and re-installation of Split AC | Dismantling, shifting and re-installation of Split AC |
| 48 | Dismantling, shifting and re-installation of window AC | Dismantling, shifting and re-installation of window AC |
| 49 | Providing & fixing of refrigerant copper pipe with insulation | Providing & fixing of refrigerant copper pipe with insulation |
| 50 | Providing & fixing of refrigerant copper pipe with insulation | Providing & fixing of refrigerant copper pipe with insulation |
| 51 | Providing & fixing of Condenser Unit wall mounting stand | Providing & fixing of Condenser Unit wall mounting stand |
| 52 | Repair of 1.5 ton Inverter compressor | Repair of 1.5 ton Inverter compressor |
| 53 | Repair of 2.0 ton Inverter compressor | Repair of 2.0 ton Inverter compressor |
| 54 | Shift O&M of Fire system | Shift O&M of Fire system |
| 55 | Service for upkeeping of Jockey Pump | Service for upkeeping of Jockey Pump |
| 56 | Service for upkeeping of AC Pump | Service for upkeeping of AC Pump |
| 57 | Service for Upkeeping of Diesel Pump | Service for Upkeeping of Diesel Pump |
| 58 | Paint of fire fighting equipments | Paint of fire fighting equipments |
| 59 | Repair of water line leakage | Repair of water line leakage |
| 60 | Refilling of CO2 gas 2 kg fire extingui | Refilling of CO2 gas 2 kg fire extingui |
| 61 | Refilling of CO2 gas 4.5 kg fire extin | Refilling of CO2 gas 4.5 kg fire extin |
| 62 | refilling of CO2 gas 22.5 kg fire exitn | refilling of CO2 gas 22.5 kg fire exitn |
| 63 | Refilling of mechanical foam 9 ltr. | Refilling of mechanical foam 9 ltr. |
| 64 | Refilling of DCP 2 Kg Capacity | Refilling of DCP 2 Kg Capacity |
| 65 | Refilling of DCP 50kg capacity | Refilling of DCP 50kg capacity |
| 66 | Refilling of foam type fire extin 50kg | Refilling of foam type fire extin 50kg |
| 67 | Refilling of foam type fire extin 9kg | Refilling of foam type fire extin 9kg |
| 68 | Refilling of water type fire extin 9ltr | Refilling of water type fire extin 9ltr |
| 69 | Refilling of ABC type fire extin 5 Kg | Refilling of ABC type fire extin 5 Kg |
| 70 | S. of RRL fire hose pipe IS 636 | S. of RRL fire hose pipe IS 636 |
| 71 | S. thermoplastic fire hose reel tub 20mm | S. thermoplastic fire hose reel tub 20mm |
| 72 | S. of first Aid fire hose reel swinining | S. of first Aid fire hose reel swinining |
| 73 | S. of Foam Type Exting 50 ltr. | S. of Foam Type Exting 50 ltr. |
| 74 | S. of DCP Type Exting 50 Kg. | S. of DCP Type Exting 50 Kg. |
| 75 | S. of Sand Bucket 9 Kg | S. of Sand Bucket 9 Kg |
| 76 | S. of Stand for 4 Bucket with Top Cover | S. of Stand for 4 Bucket with Top Cover |
| 77 | S. of Non addressable Smoke Dectector | S. of Non addressable Smoke Dectector |
| 78 | S. of Non addressable Heat Dectector | S. of Non addressable Heat Dectector |
| 79 | S. of analogue addressable 4 loop fire alarm control panel-Ravel/Avani model | S. of analogue addressable 4 loop fire alarm control panel-Ravel/Avani model |
| 80 | S. of addressable loop card of Ravel/RE-LC model | S. of addressable loop card of Ravel/RE-LC model |
| 81 | S.Addressable Smoke detector with base of Ravel make | S.Addressable Smoke detector with base of Ravel make |
| 82 | S.Addressable Heat detector with base of ravel make | S.Addressable Heat detector with base of ravel make |
| 83 | S.Addressable manual call point of Ravel make | S.Addressable manual call point of Ravel make |
| 84 | S. Addressable 2 loop panel of GST/GST200N-1 model | S. Addressable 2 loop panel of GST/GST200N-1 model |
| 85 | S.Addressable Smoke detector with base of GST/DI-9102E+DB-01 | S.Addressable Smoke detector with base of GST/DI-9102E+DB-01 |
| 86 | HydroTesting Co2 Ext. Cap. of 2/4.5/22.5 | HydroTesting Co2 Ext. Cap. of 2/4.5/22.5 |
| 87 | Hydro Testing ABC/DCP Ext.Cap. of 2/5 Kg | Hydro Testing ABC/DCP Ext.Cap. of 2/5 Kg |
| 88 | Replacement of Non addressable fire control cum alarm panel with amplifier | Replacement of Non addressable fire control cum alarm panel with amplifier |
| 89 | DEPLOYMENT OF Facility Manager | DEPLOYMENT OF Facility Manager |