|
| 1 | Provision of car parking shed at certain locations of HQ SAC (U) Trivandrum. |
| 2 | M&L Surface excavation not exceeding 30 cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified and as directed. |
| 3 | M & L hardcore of broken stone or boulders of gauge n.exc.63mm,deposited,spread and levelled in layers n exc. 15 cm thick, watered and well rammed to a true surfaceall as specified and as directed.. |
| 4 | M&L for Shingle or gravel/granular chips 50mm thick, spread, rolled and consolidated to gradient and camber required complete all as specified and as directed |
| 5 | M&L machine pressed precast concrete interlocking paver block any shape and size conforming to IS 15658-2006 of 60mm thickness, M-35 grade with grey cement and no pigment complete all as specified and as directed. |
| 6 | M&L precast cement concrete block masonry with solid blocks, exc 10cm in width and setting in mortar, complete built in CM 1:6 complete all as specified and as directed |
| 7 | M&L rendering 15mm thick in cement mortar (1:4) on fair faces of brick or concrete surfaces finished even and smooth without using extra cementall as specified and as directed. |
| 8 | Removing excavated materials soil n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting pointall as specified and as directed. |
| 9 | Supply & Fabricate and complete erection of multiple pillar, powder coated, tensile car porch/parking shed comprises of posts/pillar of CHS 125-130mm dia GI of 2.8mm thickness, with main curve/rafter of CHS 75-80mm dia GI of 2mm to, and purlins of CHS 50mm dia GI section 2mm tk. The tensile cloth/membrane should be fire retardant and weight should be not less than 750 to 800 gms per sqm. Note :- The rate quoted by the tenderer for tensile car parking porch/parking shed structure shall be including, unloading & stacking of material at site, all civil works including excavation in post holes, PCC, and removal of soil, supervision of erection work, erection, accessories arrangement of required tools, tackles machinery, manpower required, scaffolding, structure fabrication with material to the entire satisfaction of Engr-in-Charge/GE. The height of car parking/porch should be approx 2.50 mtr high complete all as specified and as directed. |
| 10 | Provision of Arboriculture work at Vayu vihar Campus of HQ SAC(U) |
| 11 | Earth work excavation in any type of soil avg to a depth of 30 cm to a true surface as directed and removing to a distance with the station complex up to 2 Km and depositing. Filling back/spreading with red earth 25 cm thick, mixed with dairy farm yard manure, vermi compost, neem cake (2 Kg manure, 1 Kg vermi compost, 0.50 Kg neem cake per Sqm), treating the soil with pesticides(i.e., Bavitin, BHC 10%, linson dust, thimment and phorate as per manufactures instructions, applying chemical manure super, 19:19:19 (as per mfg Instructions) incl turfing/ laying of Mexican feathered carpet grass ready made of approved quality turfing side by side Without undulations and depressions and ramming the surface and maintaining by regular watering weeding gap filling with skilled labour etc complete all as specified and as directed. |
| 12 | Digging of pit n exc 1 cum (0.6x0.6x0.6 m) in any type of soil including removal and filling back the pit with suitable growing media i.e. Red earth/sandy soil etc mixing with dairy farm yard manure, vermi compost, neem cake (Manure 5 kg, vermi compost 2 kg, neem cake 1 kg per pit) treating the edges and soil with BHC 10 % Linson dust, Thimment and Phorate as per manufacturer instructions and making up the trench area by half filling with red earth & balance mixing with the above manures filled and making up the trench area to proper levels, including supplying and planting of shrubs, such as Ixora Red as approved by GE and maintaining by regular watering and weeding etcall as specified and as directed. |
| 13 | Digging of pit n exc 1 cum (0.6x0.6x0.6 m) in any type of soil including removal and filling back the pit with suitable growing media i.e. Red earth/sandy soil etc mixing with dairy farm yard manure, vermi compost, neem cake (Manure 5 kg, vermi compost 2 kg, neem cake 1 kg per pit) treating the edges and soil with BHC 10 % Linson dust, Thimment and Phorate as per manufacturer instructions and making up the trench area by half filling with red earth & balance mixing with the above manures filled and making up the trench area to proper levels, including supplying and planting of shrubs, such as Eugenia as approved by GE and maintaining by regular watering and weeding etc all as specified and as directed. |
| 14 | Digging of pit n exc 1 cum (0.9x0.9x1.00 m) in any type of soil including removal and filling back the pit with suitable growing media i.e. Red earth/sandy soil etc mixing with dairy farm yard manure, vermi compost, neem cake (Manure 5 kg, vermi compost 2 kg, neem cake 1 kg per pit) treating the edges and soil with BHC 10 % Linson dust, Thimment and Phorate as per manufacturer instructions and making up the trench area by half filling with red earth & balance mixing with the above manures filled and making up the trench area to proper levels, including supplying and planting of trees, such as panda ficus/ black ficus as approved by GE and maintaining by regular watering and weeding etc all as specified and as directed. |
| 15 | Digging of pit n exc 1 cum (0.9x0.9x1.00 m) in any type of soil including removal and filling back the pit with suitable growing media i.e. Red earth/sandy soil etc mixing with dairy farm yard manure, vermi compost, neem cake (Manure 5 kg, vermi compost 2 kg, neem cake 1 kg per pit) treating the edges and soil with BHC 10 % Linson dust, Thimment and Phorate as per manufacturer instructions and making up the trench area by half filling with red earth & balance mixing with the above manures filled and making up the trench area to proper levels, including supplying and planting of trees, such as Phyllanthus as approved by GE and maintaining by regular watering and weeding etcall as specified and as directed. |
| 16 | Digging of pit n exc 1 cum (0.9x0.9x1.00 m) in any type of soil including removal and filling back the pit with suitable growing media i.e. Red earth/sandy soil etc mixing with dairy farm yard manure, vermi compost, neem cake (Manure 5 kg, vermi compost 2 kg, neem cake 1 kg per pit) treating the edges and soil with BHC 10 % Linson dust, Thimment and Phorate as per manufacturer instructions and making up the trench area by half filling with red earth & balance mixing with the above manures filled and making up the trench area to proper levels, including supplying and planting of trees, such as Buddha Bamboo as approved by GE and maintaining by regular watering and weeding etc all as specified and as directed. |
| 17 | Supply and filling with Red soil including spreading, levelling, Watering and well ramming in layers as per the required thickness directed by Engr in charge complete all as specified and directed |
| 18 | M&L for Brickwork with sub- class ‘B’ bricks straight or curved on plan exc 6 m mean radius in CM 1:6, complete all as specified and directed. |
| 19 | M&L for rendering 15mm thick on fair faces of brick work or concrete surfaces in CM 1:4 including finished the surface even and smooth with out using extra cement complete all as specified and directed. |
| 20 | M&L for 20mm thick Granite (of any type) work (table rubbed and polished) in steps, jambs, pillars, window-cills, cooking platforms and like in cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of pigment to match with shade of granite complete all as specified and directed. |
| 21 | M&L for rendering 15mm thick on fair faces of brick work in CM 1:4 as backing coat to receive tiles/granite complete all as specified and directed. |
| 22 | Maintenance of ornamental plants/trees/hedges etc for Defect Liability Period (Two year) by using the provided watering system and chemical measuring with system such as drip irrigation/ sprinkler system etc. and applying vermi compost , neem cake, pesticides & micro nutrients as per Mfg Instructions once in a every three monthsall as specified and as directed. Please Enable Macros to View BoQ information |