|
| 1 | Hiring including Operation & Maintenance of vacuum sweeping machine including all consumables for sweeping and cleaning of Carriageway, Service Roads/Pucca side berms etc. within the right of way of road having(a) Exhaust air quality within the ambient air quality standard in respect of PM 10 particles(b) Engine emission norms as legally permissible in National Capital Region of Delhi(Presently BS-VI Norms for Diesel machines or CNG engine machines).(c) Machines with minimum dust tank capacity of 5 cum and minimum sweeping width of 2 m and fitted with hydraulic dust unloading facility and fitted with GPRS for tracking its movement.(i) All necessary consumable such as brushesoil and lubricants and any other required for smooth running and functioning of vacuum sweepers shall be provided by the supplier / contractor / owner of machine and no claim shall be entertained on this account.(ii) The operator for operating the machine and helper / supervisor shall be supplied by the supplier / contractor / owner of machine and no claim shall be entertained on this account.(iii) The machine shall always be neat and clean and in good working condition not older than 5 years(iv) The working hours for staff and machine are 8 hours. However due to traffic restriction or any other reason not attributable to department, the timing of working may changei.e. cleaning can be done early in the morning or late in the night. No claim shall be entertained on this account.The price quoted should be Lum sump Quote per month ( excluding GST) for daily cleaning of areas under specified Industrial Areas as directed by Engineer Incharge |
| 2 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. |
| 3 | Clearing jungle including up rooting of rank vegetations grass,push wood trees and samplings of grith upto 30 cms measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of area cleared. |
| 4 | Tractor with trolly including POL and driver. |
| 5 | Supply of labour SOR-2020/ SI NO-12 |
| 6 | Providing Sweeper for sweeping Roads including Miscellaneus charges ( uniform ,Jackets,shoes ,gloves,mask,caps etc |
| 7 | Water Tanker with sprinkler 6000 Litre or above cap with POL/Driver including filling of water etc. copmlete. SOR-2022 |
| 8 | Providing Wheeled excavator cum loader including POL & driver (as per SOR Ghaziabad Labour rate sl.no.31) |
| 9 | Supply of Water Lifting Doesel Pump Set on rent basis for 8 hours per day including fuel, Wages of Pump Operator, Helper and all Other taxes rewuired for proper Cpmletion of the work as per Direction Engineer Incharge. |
| 10 | Excavation in foundation in ordinary soil (loam clay or sand) including lift up to 1.5 m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m. from the foundation trenches. |
| 11 | Cartage of earth or fly ash when added to schedule item no- 253 Lead upto 1.0 KM Rate as per SOR-2022 S.N0-4.11 Item N0-261 |
| 12 | Providing and laying at or near ground level factory made kerb stone of M- 25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge)..DSR-18/16.69/AR |
| 13 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost) DSR-18/16.85/AR |
| 14 | M.S.or Iron work of heavy size such as trusses builtup gates record rackers roof works gates etc.wrought to required including riveting welding where necessary grill for central verge mising /damage at siteUPPWD SOR /503/P-28 |
| 15 | Cement Concrete with 2 cm gauge approved stone ballast coarse sand & cement in the proportion of 1:2:4 including supply of all materials labour tools & plants etc reguired for proper complection of the work Rate as per UPPWD SOR-2022/279 (a) |
| 16 | Painting roofs or other iron work in large areas with one coat priming and two coat of approved (above one Sq. Metre) paint (British antesol or equivalent) including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm. the ISI no. 103-109 |
| 17 | White washing one coat including supply of all materials ,labour,Tools & plants etc.required for proper completion of the work .As in item 671 above but Two coatsRate as per SOR-2022 /671 |
| 18 | Providing and applying 2.5 mm thick road marking strips (retroreflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in charge and accordance with applicable specifications.Rate as per SOR-2022 Item N0-Road Sefty (New Item) S.N0-22.02 |
| 19 | Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work Rate as per UPPWD SOR-2022/275 |
| 20 | M-150 brick work in 1:6 cement & coarse sand 1.25F.M mortar in foundation and plinth including supply of all materials labour complection of the work. UPPWD SOR 303 |
| 21 | Laying of I shaped precast Interlocking Tiles of thickness 80 mm (Ordinary grey) (Compressive strength not less than 30 Mpa and weight 4.50 Kg) Including 25mm thick local sand base leveling and dressing of surface to required level and slope, filling joints with local sand all complete work. Including vat.Rate as per Sanction wide Job No-CD-III(40) |
| 22 | 12 mm thick Plaster with Cement and Coarse sand of 1.25 fineness modules in 1:6 over brick work minimum thickness not to be lessthen 1 Cm including supply of all materials, labour, tools & Plants etc required for proper completion of the work.Rate as per UPPWD SOR-2022/582 S.N0-13.14 (New Item) |
| 23 | Repair to pot holes and removal of loose material,trimming of sides ,cleaning of surface by providing tack coat @ 0.30 kg per sqm,20 mm thick pre-mix carpet composed of 13.2 mm to 5.6 mm aggreggates and seal coat type B specification , compacted by three wheel 80-100 KN static roller as directed by Engineer-in-charge by using mixoll machine including all T&P and sundries etc.required for proper completion of work but excluding cost of bitumen and grit |
| 24 | Supply of packged bitumin (pack of 156 kg)Analys is attach as per IOCL |
| 25 | Supply of 13.2 mm to 5.6 mm crushed stone aggregates |
| 26 | Cement Concrete with 4 cm guage approved stone ballast coarse sand & cement in thr proportion of 1:1.5:3 including supply of all material labour tools & plants etc reguired for proper complection of the work rate as per UUPWD SOR-2022/279 (C) Please Enable Macros to View BoQ information |