| 1 | PART-1.A:-1. Supply & Laying of 11 KV UG Cable Using 11KV spare. (Refer point B-C in SLD)Supply, Laying, Commissioning & Testing of 11KV, 3Core, 95 sqmm, XLPE insulation armoured UG cable(SC rating of cable in kA-9kA and SC rating of Armour in kA-9kA) |
| 2 | Supply & Erection of Outdoor termination kits, Heat Shrinkable type suitable for 11KV, 3Core, 95 sqmm, HT UG Cable kits |
| 3 | Supply & Laying of materials for High Density Polyethylene (HDPE) pipe 160mm diameter, PE 80-PN8 for laying of 11KV UG cable |
| 4 | Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P etc or UG Cable TrenchEarth work excavation of soil. |
| 5 | Earth work excavation of hard rock. |
| 6 | Back filling with excavated soil outside and above the trench. |
| 7 | Supply and erection of Gl pipe dia. 150mm, Class-B (8Mtr.). |
| 8 | Supply and erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works. |
| 9 | Part-I.B:-1. Supply & Installation of 01 No. of DP with AB Sw Unit (Refer point C in the proposed SLD).2. Installation of 3 nos. of LA on existing pole for UG Cable rating (Refer P SLD \\"B\\")WPB (GI) Pole 160x152 (11Mtr. Long. 30.44KG/Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner-334.84 KG+10.74 KG=345.58 KG) |
| 10 | Top Channel (GI) 100X50X6mm, 9.56 KG/Mtr., each Channel (GI) length 3 mtr.. 2 no's Channel(GI) required =(2x9.56x3) |
| 11 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr.. each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 12 | AB switch Mounting Channel (GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel (GI) required (7.14x3x2) |
| 13 | HT MU Mounting Channel (GI) 100X50X6mm, 9.56KG/Mtr, each Channel (GI) length 3 Mtr., 2 no's Channel (GI) required =(9.56x3x2) |
| 14 | HG/ DO Fuse Mounting Channel (GI) 75x40x4.8 mm Gl Channel (GI) (3000) mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 15 | Cantilever Support Channel (GI) 75x40x4.8 mm GI Channel (GI) (810 mm long.2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14) |
| 16 | Angle(GI) for Cantilever arrrangement for HT MU 50 x 50 x 61282 mm.each 2 nos. (4.5 K.g. per mtr.) |
| 17 | MU and AB Switch Side Support Channel (GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 4 no's Channel (GI) required (9.56x4x0.35) |
| 18 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel (GI) length 0.8 Mtr., 1 no's Channel (GI) required =(7.14x0.8x1) |
| 19 | Double Pole Belting Channel (GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel (GI) length 3 Mtr., 2 no's Channel (GI) required (7.14x3x2) |
| 20 | 50x50x6mm.Gl Bracing Angle(GI). 4.5Kg./mtr., each Angle (GI) length 3.512 mtr., 2 nos Angle (GI) required = (4.5x3.512x2) |
| 21 | Danger Plate, 2 no's. |
| 22 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 23 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 24 | H.T. Stay clamp, 50x8 mm. Flat (GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required (1 Pair) |
| 25 | H.T. Stay set (Complete) |
| 26 | H.T. Stay Insulator Type-C |
| 27 | 7/10 SWG Stay Wire 15kg /stay |
| 28 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 29 | Flat(GI) for 50x6mm earthing, 2.36kg/mtr., (12.5+12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 33x2.36 |
| 30 | GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty, required =(2x3kg) |
| 31 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's (8x0.59x0.510) |
| 32 | Lightning Arrester (12KV,10KA) (Station Class,class-2) |
| 33 | AB Switch (11KV,200A.3pole, 50Hz) |
| 34 | 11 KV pin insulator polymer |
| 35 | HW fitting (B&S) 70KN, 3Bolt |
| 36 | Disc insulator (B&S) 70 KN polymer |
| 37 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 38 | GI Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch) |
| 39 | POLYCARBONATE BIRD GUARD |
| 40 | Black Paint(GIS Numbering & Zebra Stripping) |
| 41 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 42 | DO.Fuse (11KV.200A.3Pole) |
| 43 | 20 AMP Fuse Link |
| 44 | Fixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mm x 500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 45 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) =0.45Cu.mtr |
| 46 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450) = 0.1125 Cu mtr(Per Pole) |
| 47 | Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth, resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe. |
| 48 | Supply and Erection of Gl Fencing with Gate |
| 49 | WPB (GI) Pole 160x152 (11Mtr. Long. 30.44KG/Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner-334.84 KG+10.74 KG=345.58 KG) |
| 50 | Top Channel (GI) 100X50X6mm, 9.56 KG/Mtr., each Channel (GI) length 3 mtr.. 2 no's Channel(GI) required =(2x9.56x3) |
| 51 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr.. each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 52 | AB switch Mounting Channel (GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel (GI) required (7.14x3x2) |
| 53 | HT MU Mounting Channel (GI) 100X50X6mm, 9.56KG/Mtr, Channel (GI) length 3 Mtr., 2 no's Channel (GI) required =(9.56x3x2) |
| 54 | HG/ DO Fuse Mounting Channel (GI) 75x40x4.8 mm Gl Channel (GI) (3000 mm long) (7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14 42.84 Kg) |
| 55 | Cantilever Support Channel (GI) 75x40x4.8 mm Gl Channel (GI) (810 mm long.2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14) |
| 56 | Angle(GI) for Cantilever arrrangement for HT MU 50 x 50 x 6 1282 mm.each 2 nos. (4.5 K.g. per mtr.) |
| 57 | MU and AB Switch Side Support Channel (GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 4 no's Channel (GI) required (9.56x4x0.35) |
| 58 | Channel (GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel (GI) length 0.8 Mtr., 1 no's Channel (GI) required =(7.14x0.8x1) |
| 59 | Double Pole Belting Channel (GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel (GI) length 3 Mtr., 2 no's Channel (GI) required (7.14x3x2) |
| 60 | 50x50x6mm.Gl Bracing Angle(GI). 4.5Kg./mtr., each Angle (GI) length 3.512 mtr., 2 nos Angle(GI) required (4.5x3.512x2) |
| 61 | Danger Plate, 2 no's. |
| 62 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 63 | H.T. Stay clamp, 50x8 mm. Flat (GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required (1 Pair) |
| 64 | H.T. Stay set (Complete) |
| 65 | H.T. Stay Insulator Type-C |
| 66 | 7/10 SWG Stay Wire 15kg /stay |
| 67 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 68 | 50x6mm Flat(GI) for earthing. 2.36kg/mtr., (12.5+12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For 33x2.36 mesh formation and 2.5 mtr. For raising)=33x2.36 |
| 69 | Gl barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 70 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 71 | Lightning Arrester (12KV,10KA) (Station Class.class-2) |
| 72 | AB Switch (11KV,200A.3pole, 50Hz) |
| 73 | 11 KV pin insulator polymer |
| 74 | HW fitting (B&S) 70KN, 3Bolt |
| 75 | Disc insulator (B&S) 70 KN polymer |
| 76 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 77 | GI Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch)d) |
| 78 | POLYCARBONATE BIRD GUARD |
| 79 | Black Paint(GIS Numbering & Zebra Stripping) |
| 80 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 81 | SITC of 500 KVA, 11/0.4 KV (Cu) M Transformer with BIS Energy level II make: OEU/ALFA/OTPL |
| 82 | LT Distribution Box with MCCB, N Aluminium Busbar for 3 Bay with kit kat fuse for 500 KVA S/S |
| 83 | 55mm2 All Alloy Aluminum Conductor N (AAAC) PVC Insulated (50 Mtr. Each Dtr.) |
| 84 | 1 Cx 400 mm2 LT XLPE Cable(Un-M Armoure) |
| 85 | H.G Fuse(11kv 200A 3 Pole |
| 86 | PG Clamp for 55 sq.mm AAA conductor |
| 87 | Fixing of complete 11KV line Completestay set includes1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 88 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) =0.45Cu.mtr(Per |
| 89 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450) = 0.1125 Cu mtr(Per Pole) |
| 90 | Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth, resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe. |
| 91 | LTDB Plinth |
| 92 | DTR Plinth Up to 1000 KVA |
| 93 | Laying of 1.1 KV Cable upto 185 to 400 Sq mm |
| 94 | Supply and Erection of Gl Fencing with Gate |
| 95 | (Part II) SITC of 500 KVA Cu. DTR with DP structure for HTMU & other accessories for power supply to hostel areas to be installed near Service building SCBMCH, CuttackPART-II.A :-1. Construction of 11 KV O/H Line of 0.005 CKM using 11 KV 55 sq.mm XLPE covered conductor from existing DP with ABS (Refer SLD Point-D-F)Supply, Stringing, Commissioning & Testing of 55 SO MM AAAC XLPE Covered Conductor |
| 96 | Supply & erection of Insulation Piercing Connectors (IPCs) for 55 sq.mm AAA conductor (For covered conductor-11kV |
| 97 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 98 | Part-II, B :- Supply & Installation of 01 No. of DP with AB Switch using 11mtr WPB pole for HT meterring unit (Refer point F in the proposed SLD).WPB (GI) Pole 160x152 (11Mtr. Long. 30.44KG/Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner-334.84 KG+10.74 KG=345.58 KG) |
| 99 | Top Channel (GI) 100X50X6mm, 9.56 KG/Mtr., each Channel (GI) length 3 mtr.. 2 no's Channel(GI) required =(2x9.56x3) |
| 100 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 101 | AB switch Mounting Channel (GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel (GI) required (7.14x3x2) |
| 102 | HT MU Mounting Channel (GI) 100X50X6mm, 9.56KG/Mtr. each Channel (GI) length 3 Mtr., 2 no's Channel(GI) required (9.56x3x2) |
| 103 | HG/ DO Fuse Mounting Channel (GI) 75x40x4.8 mm Gl Channel (GI) (3000) mm long) (7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 104 | Cantilever Support Channel (GI) 75x40x4.8 mm Gl Channel (GI) (810 mm long.2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14) |
| 105 | Angle(GI) for Cantilever arrrangement for HT MU 50 x 50 x 6 1282 mm.each 2 nos. (4.5 K.g. per mtr.) |
| 106 | MU and AB Switch Side Support Channel (GI) 100X50X6mm, 9.56 KG/Mtr., each Channel (GI) length 0.35 mtr., 4 no's Channel (GI) required (9.56x4x0.35) |
| 107 | Channel (GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel (GI) length 0.8 Mtr., 1 no's Channel (GI) required =(7.14x0.8x1) |
| 108 | Double Pole Belting Channel (GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel (GI) length 3 Mtr., 2 no's Channel (GI) required (7.14x3x2) |
| 109 | 50x50x6mm.Gl Bracing Angle(GI), 4.5Kg./mtr., each Angle (GI) length 3.512 mtr., 2 nos Angle(GI) required= (4.5x3.512x2) |
| 110 | Danger Plate, 2 no's. |
| 111 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 112 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 113 | H.T. Stay clamp, 50x8 mm. Flat (GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required (1 Pair) |
| 114 | H.T. Stay set (Complete) |
| 115 | H.T. Stay Insulator Type-C |
| 116 | 7/10 SWG Stay Wire 15kg /stay |
| 117 | GI Pipe Earthing 40mm. 3 Mtr. Long |
| 118 | 50x6mm Flat(GI) for earthing. 2.36kg/mtr., (12.5+12.5 Mtr. For L.A. 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 33x2.36 |
| 119 | Gl barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 120 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's (8x0.59x0.510) |
| 121 | Lightning Arrester (12KV,10KA) (Station Class,class-2) |
| 122 | AB Switch (11KV,200A.3pole, 50Hz) |
| 123 | 11 KV pin insulator polymer |
| 124 | HW fitting(B&S) 70KN, 3Bolt |
| 125 | Disc insulator (B&S) 70 KN polymer |
| 126 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 127 | GI Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch) |
| 128 | POLYCARBONATE BIRD GUARD |
| 129 | Black Paint(GIS Numbering & Zebra Stripping) |
| 130 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 131 | DO.Fuse(11KV.200A.3Pole) |
| 132 | 20 AMP Fuse Link |
| 133 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 134 | Concreting ratio 1:1.5:3(M-20 Grade)(500mmX500mmX1800mm) =0.45Cu.mtr(Per |
| 135 | Couping ratio 1:1.5:3(M-20 Grade) with mtr(Per Pole) dimension (500X500X450) = 0.1125 Cu |
| 136 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder. calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe. |
| 137 | Supply and Erection of Gl Fencing with Gate |
| 138 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner-334.84 KG+10.74 KG=345.58 KG) |
| 139 | Top Channel (GI) 100X50X6mm, 9.56 KG/Mtr., each Channel (GI) length 3 mtr.. 2 no's Channel(GI) required =(2x9.56x3) |
| 140 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required= (6x2.36x0.280) |
| 141 | AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel (GI) required =(7.14x3x2) |
| 142 | HT MU Mounting Channel (GI) 100X50X6mm, 9.56KG/Mtr. each Channel (GI) length 3 Mtr., 2 no's Channel(GI) required (9.56x3x2) |
| 143 | HG/ DO Fuse Mounting Channel (GI) 75x40x4.8 mm GI Channel (GI) (3000) mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 144 | Cantilever Support Channel (GI) 75x40x4.8 mm GI Channel (GI) (810 mm long.2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14) |
| 145 | Angle(GI) for Cantilever arrrangement for HT MU 50 x 50 x 6 1282 mm.each 2 nos. (4.5 K.g. per mtr.) |
| 146 | MU and AB Switch Side Support Channel (GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 4 no's Channel (GI) required (9.56x4x0.35) |
| 147 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel (GI) length 0.8 Mtr., 1 no's Channel (GI) required (7.14x0.8x1) |
| 148 | Double Pole Belting Channel (GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel (GI) length 3 Mtr., 2 no's Channel (GI) required =(7.14x3x2) |
| 149 | 50x50x6mm.Gl Bracing Angle (GI), 4.5Kg./mtr., each Angle (GI) length 3.512 mtr., 2 nos Angle(GI) required= (4.5x3.512x2) |
| 150 | Danger Plate, 2 no's. |
| 151 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 152 | H.T. Stay clamp, 50x8 mm. Flat (GI). 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty.required (1 Pair) |
| 153 | H.T. Stay set (Complete) |
| 154 | H.T. Stay Insulator Type-C |
| 155 | 7/10 SWG Stay Wire 15kg/stay |
| 156 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 157 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (12.5+12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 33x2.36 |
| 158 | Gl barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty, required =(2x3kg) |
| 159 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 160 | Lightning Arrester (12KV,10KA) (Station Class,class-2) |
| 161 | AB Switch (11KV,200A.3pole, 50Hz) |
| 162 | 11 KV pin insulator polymer |
| 163 | HW fitting (B&S) 70KN, 3Bolt |
| 164 | Disc insulator (B&S) 70 KN polymer |
| 165 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 166 | GI Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch) |
| 167 | POLYCARBONATE BIRD GUARD |
| 168 | Black Paint(GIS Numbering & Zebra Stripping) |
| 169 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 170 | SITC of 500 KVA, 11/0.4 KV (Cu) Transformer with BIS Energy level II make: OEU/ALFA/OTPL |
| 171 | LT Distribution Box with MCCB, fuse for 500 KVA S/S Aluminium Busbar for 3 Bay with kit kat |
| 172 | 55mm2 All Alloy Aluminum Conductor (AAAC) PVC Insulated (50 Mtr. Each Dtr.) |
| 173 | 1 Cx 400 mm2 LT XLPE Cable(Un-Armoured) |
| 174 | H.G.Fuse(11KV.200A.3Pole) |
| 175 | PG Clamp for 55 sq.mm AAA conductor |
| 176 | Fixing of complete 11KV line Completestay set includes 1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 177 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) =0.45Cu.mtr(Per |
| 178 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450) = 0.1125 Cu mtr(Per Pole) |
| 179 | Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe |
| 180 | LTDB Plinth |
| 181 | DTR Plinth Up to 1000 KVA |
| 182 | Laying of 1.1 KV Cable upto 185 to 400 Sq mm |
| 183 | Supply and Erection of Gl Fencing with Gate Please Enable Macros to View BoQ information |