|
| 1 | ELECTRICAL WORK |
| 2 | Supplying, installation, testing & commissioning of 12V 7Ah Battery as required. |
| 3 | Supplying, installation, testing & commissioning of Smoke detector with base as required. |
| 4 | Supplying, installation, testing & commissioning of Manual Call Point as required. |
| 5 | Supplying, installation, testing & commissioning of Conventional Hooter as required. |
| 6 | Supplying, installation, testing & commissioning of GSM Auto Dialer as required. |
| 7 | Zone rectification as required. |
| 8 | Supplying, installation, testing & commissioning of Loop card as required. |
| 9 | Supplying, installation, testing & commissioning of RS 485 card as required. |
| 10 | Supplying, installation, testing & commissioning of SMPS as required. |
| 11 | Supplying, installation, testing & commissioning of Hooter as required. |
| 12 | Supplying, installation, testing & commissioning of Base Board as required. |
| 13 | Supplying, installation, testing & commissioning of Morley IAS Zx2Se-2lOOP Panel as required. |
| 14 | Supplying, installation, testing & commissioning of Morley IAS Zx5Se as required. |
| 15 | Supplying, installation, testing & commissioning of TCP/IP Card as required. |
| 16 | Supplying, installation, testing & commissioning of Isolator Module as required. |
| 17 | Supplying & laying of Cable: 2Cx1.5sq.mm Armoured copper cable as required. |
| 18 | Final Integration of all buildings and commissioning of fire alarm system of the whole factory. |
| 19 | System layout drawing shall be designed against the respective building CAD drawings of BEL. (This can be done only after complete readiness of all the systems and in fully working condition). Please Enable Macros to View BoQ information |