| 1 | Wiring for circuit / submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor , single core cable in surface /recessed medium class PVC conduit as reqd. | Wiring for circuit / submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor , single core cable in surface /recessed medium class PVC conduit as reqd. |
| 2 | Supplying and drawing following sizes of FRLS PVC insulated copper conductor , single core cable in the existing surface /recessed steel/PVC conduit as reqd. | Supplying and drawing following sizes of FRLS PVC insulated copper conductor , single core cable in the existing surface /recessed steel/PVC conduit as reqd. |
| 3 | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size in the existing masonry open duct as required.(Including transportation of cable from Kadri store to Kundapura TE) | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size in the existing masonry open duct as required.(Including transportation of cable from Kadri store to Kundapura TE) |
| 4 | Supplying & making end teriminations with brass compression glands with Al. lugs to the following size Al.AUG cable including crimping with Al. end teriminations etc asrequired. | Supplying & making end teriminations with brass compression glands with Al. lugs to the following size Al.AUG cable including crimping with Al. end teriminations etc asrequired. |
| 5 | Dismantling of 3 1/2 x 35 sqmm UG cable from Mescom pole to Mescom meter board laid at a height of 5mtrs from floor at TE Adyarpadav, without any damage. Including transportion to Kadri Store as reqd. (Appr. 15Km, cable length appr. 50mtrs two runs) | Dismantling of 3 1/2 x 35 sqmm UG cable from Mescom pole to Mescom meter board laid at a height of 5mtrs from floor at TE Adyarpadav, without any damage. Including transportion to Kadri Store as reqd. (Appr. 15Km, cable length appr. 50mtrs two runs) |
| 6 | Dismantling of 1No 125A ON Load change over switch from surface of panel with enclosure and refixing the same to another place in same room. Incuding , cutting the welding portion,dismantling of incoming and out going cable, reconnecting the same etc… as redq. | Dismantling of 1No 125A ON Load change over switch from surface of panel with enclosure and refixing the same to another place in same room. Incuding , cutting the welding portion,dismantling of incoming and out going cable, reconnecting the same etc… as redq. |
| 7 | Fixing of EA set Control panel in proper manner in existing trench with suitable modifications and connect the UG cable in and out as reqd. | Fixing of EA set Control panel in proper manner in existing trench with suitable modifications and connect the UG cable in and out as reqd. |
| 8 | Servicing of sub main distribution Panel of size 1.50mtrs x 1.00mtrs x0.30mtrs. Including titening of nut bolts and find any loose connection in cable joints , busbars connections etc…. And Painting ,including removing the rusted partcles , sign writing etc... as reqd. | Servicing of sub main distribution Panel of size 1.50mtrs x 1.00mtrs x0.30mtrs. Including titening of nut bolts and find any loose connection in cable joints , busbars connections etc…. And Painting ,including removing the rusted partcles , sign writing etc... as reqd. |
| 9 | Dismanatling of 125A floor mounted LT panel (Size 1.70m Height , 1.60m Width , 0.40m Depth).Including dismantling of IN/OUT cables ( with terminations and glands , disconnecting the AC unit DB and EI & Fans circuits & subamain wiring( MS Conduit), earthing, dismantling of DC DB , fittings, switch boards MS conduits wiring , metal junction boxes, removing checknuts , DC wirings, tube fittings etc from wall….without any damage as reqd.. | Dismanatling of 125A floor mounted LT panel (Size 1.70m Height , 1.60m Width , 0.40m Depth).Including dismantling of IN/OUT cables ( with terminations and glands , disconnecting the AC unit DB and EI & Fans circuits & subamain wiring( MS Conduit), earthing, dismantling of DC DB , fittings, switch boards MS conduits wiring , metal junction boxes, removing checknuts , DC wirings, tube fittings etc from wall….without any damage as reqd.. |
| 10 | Installing of existing 125A LT panel on floor. Including shifting from existing location to new loacation( Aprox: 20mtrs) , tightening all joints, like busbar connections , replacing of backlite type125 A HRC fuse base -3Nos , claening , panting etc… as reqd. | Installing of existing 125A LT panel on floor. Including shifting from existing location to new loacation( Aprox: 20mtrs) , tightening all joints, like busbar connections , replacing of backlite type125 A HRC fuse base -3Nos , claening , panting etc… as reqd. |
| 11 | S/F of 20watts LED fittings with lamp, including dismatling of existing faulty fittings, testing commissioning etc… as reqd. (Make : M/s Philips or Similar superior make) | S/F of 20watts LED fittings with lamp, including dismatling of existing faulty fittings, testing commissioning etc… as reqd. (Make : M/s Philips or Similar superior make) |
| 12 | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size in the existing masonry open duct as required. (Including transportation of cable from TE Pandeshwra to Site)a) up to 35Sq.mm | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size in the existing masonry open duct as required. (Including transportation of cable from TE Pandeshwra to Site)a) up to 35Sq.mm |
| 13 | Laying and fixing of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size on wall surface as required..(Including transportation of cable from TE Pandeshwra to Site)a) Upto 35 sq. mm (clamped with 1mm thick saddle) | Laying and fixing of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size on wall surface as required..(Including transportation of cable from TE Pandeshwra to Site)a) Upto 35 sq. mm (clamped with 1mm thick saddle) |
| 14 | Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required. a) 4 x16 sqmm | Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required. a) 4 x16 sqmm |
| 15 | Providing and fixing 4.00 mm dia copper wire on surface or in recess for loop earthing as required. | Providing and fixing 4.00 mm dia copper wire on surface or in recess for loop earthing as required. |
| 16 | Wiring for circuit / submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor , single core cable in surface /recessed medium class PVC conduit as reqd. a) 2x1.5sqmm + 1x1.5sqmm earth wire | Wiring for circuit / submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor , single core cable in surface /recessed medium class PVC conduit as reqd. a) 2x1.5sqmm + 1x1.5sqmm earth wire |
| 17 | Fixing of existing 4way TPN DB with isolator , SPMCBs etc..on wall. Including re connecting the all AC unit and EI Fans circuit wiring and wiring the submain to DB from LT Panel as reqd. | Fixing of existing 4way TPN DB with isolator , SPMCBs etc..on wall. Including re connecting the all AC unit and EI Fans circuit wiring and wiring the submain to DB from LT Panel as reqd. |
| 18 | Wiring for circuit / submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor , single core cable in surface /recessed medium class PVC conduit as reqd. a) 2x4sqmm + 1x4 sqmm earth wire | Wiring for circuit / submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor , single core cable in surface /recessed medium class PVC conduit as reqd. a) 2x4sqmm + 1x4 sqmm earth wire |