| 1 | Cleaning shurb jungle including uprooting stumps & small bushes and removal of rubbish up to a distance of 50m outside the periphery of the area complete in all respect as directed by the Engineer in charge. |
| 2 | Earthwork in excavation of foundation in all kinds of soil to proper profile including stoney earth, gravel and moorum etc. interspread with boulders up to ½ cum size with all leads, lifts and delifts including dressing and leveling the bed to design slope and bed making it fit for laying concrete including dewatering if any & depositing the excavated materials clear of work site as directed by the Engineer-in-charge. |
| 3 | Filling in foundation & plinth with sand, well watered and rammed with all leads, lifts and delifts including making arrangements for carriage of water and with cost,conveyance of all materials, labour required for the work etc complete excluding GST as per the direction of the Engineer in Charge. |
| 4 | Filling of foundation with the excavated earth with all leads and lifts, delfts including watering and ramming in layers complete in all respect etc. completed as directed by the Engineer in charge. |
| 5 | Excavation, loading , unloading and carriage by mechanical means of all kind of soil excluding Disintigrated rock, moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and laying in layers not exceeding 0.3M in depth and as directed by EIC within all leads and lfits from the place of excavation etc complete excluding GST as directed by Engineer in Charge. ( Measurement will be taken on finished level section) |
| 6 | Cement concrete in M15 grade using 20 mm down graded size crusher broken granite chips of approved quality quarried and free from weathered skin and foreign materials including mixing the materials by use of concrete mixtures and laying concrete in layers not exceeding 0.15 m in depth to required level curing vibrating with vibrators, finishing etc with all leads lifts and delifts complete in all respect to proper profile and leveling including dewatering if necessary and cost, conveyance and royalty , etc of materials including hire & running charges of the machineries complete as directed by the Engineer - in - Charge. |
| 7 | Providing Reinforced Cement Concrete M20 grade for RCC works on approved surface or shape and size using 20mm and down graded crusher broken hard granite stone aggregates of approved quality quarried, free from weathered skin, quarry debris and foreign materials, clean and sharp sand of approved grading and quality confirming to the design specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrators and finishing the exposed surface smooth, curing for required time, providing beads and grooves including cost, conveyance, royalty of all materials, ( excluding cost, carriage of M.S. rod and labour for cutting, bending, binding and fixing of M.S. rod) with all cost of tools and plant, cost and carriage of water etc, with supply of all labour and supervision Charges including mobilisation & demobilisation of machineries, T&P with all incidental Charges required for the work complete in all respect as directed by the Engineer-in-Charge. |
| 8 | Supplying, fitting & placing HYSD bars reinforcement and tying the grills as per approved design & drawing and placing in position including cost, conveyance, & binding wires of 18 to 20 gauge with supply of all labour, as per prvailing norm and T&P required for the work etc, complete in all respect as directed by the Engineer-in-Charge. (Weight of the binding wire will not be included in the measurement for payment) |
| 9 | Providing rigid and smooth centering & shuttering wiht the box type steel shutteing plates with keys for intermediate construction joints in rafts of wires, barrage and dam blocks of all materials with all labour T & P materials and depositing the debries clear of the work site with all leads & lifts completed in all respect etc complete excluding GST as directed by Engineer in Charge. |
| 10 | Rough stone dry packing in approns and revetments to all heights with hard stone other than granite and laterite of 30 cm and above size of approved quality quarried and free from weathered skin including filling interstices with small stones with cost, conveyance, royalty of all materials required for the work and finished to proper slope and level complete in all respect as directed by the Engineer-in-Charge. |
| 11 | Removing old revetments and approns and repacking with old stones with all leads and lifts labour, T&P excluding GST etc. complete as directed by the Engineer-in-Charge. |
| 12 | Providing weep holes in Brick or stone masonary/ plain / Reinforced Concrete aboutment, wingwall/ Return wall with 100mm dia P.V.C pipe, extending throgh the full width of the structure with slope of 1 v:20 H towards drawing face etc. complete as per drawing & techincal etc comleted excluding GST directed by the Engineer-in-charge. including cost of PVC pipes. |
| 13 | Supplying and spreading well graded coarse sand of approved specification for filter in rock toe riprap and filter drains in earth dam & dyke to proper thickness, slope and level with all leads & lifts including cost, conveyance, royalty of all materials, supply of all labour and T&P materials required for the item etc. complete as directed by the Engineer-in-charge |
| 14 | Supplying and filling 40mm down graded broken hard granite aggregate of approved quality and texture and free from weathered skin and other deterious materials for Rock toe, riprap and filter drains in earth dam & dyke to proper thickness, slope & level with all leads & lifts including transportation of materials to site with cost, conveyance, royalty of all materials including supply of all labour, T&P required for the item etc. complete as directed by the Engineer-in-charge |
| 15 | Providing Grade-II metal of size (45mm to 63mm) laying & spreading the same and compacting the stone aggregate to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stage to proper grade and camber, applying and brooming moorum as binding materials to fill the interstices of course aggregate, watering and compacting to required density as per clause 404 of MoRT&H specification for road and bridge works (4th Revision) including cost, carriage, royalty of all materials such as metal, moorum and water with all labour, T&P including hire and running charges of PRR required etc. complete as directed by the Engineer-in-charge |
| 16 | Collecting,supplying and laying moorum in layers not exceeding 100mm watering & compacting to the required dencity in O.M.C. with PRR including cost and conveyance of moorum etc completed excluding GST as per the direction of Engineer-in-charge. |
| 17 | Providing and applying of post construction Antitermite treatment by drilling 12mm dia holes at distance of 30cm at junction of wall and foot about 300mm deep enough to reach the soil below and chemical emulsion ( PREMISE IMIDACHI OPRIED 30.5 SC of BAYER Make mixed with 475ltr water) pumped to soak the soil @ 1ltr solution of each hole as per manufacturers application and the holes should be pluged with filling materials including cost of all materials, labour charges, conveyance, hiring charges of machineries excluding GST as per the direction of Engineer-in-charge.(For Removal of termite) Please Enable Macros to View BoQ information |