| 1 | Part- A Supplysuspension clamp with eye hook |
| 2 | J HOOK |
| 3 | DEAD END CLAMP |
| 4 | PG CLAMP |
| 5 | T OFF CHANNEL WITH CLAMP |
| 6 | STONE PAD |
| 7 | NUT AND BOLT |
| 8 | HOLDING CLAMP |
| 9 | LT POLE CLAMP |
| 10 | AL LUG of all size suitable for 25/63/100/250 kva DT |
| 11 | LT FUSE SET PROTECTION UNIT WITH SMC BOX FOR 25 /63/100KVA WITH NUT AND BOLT CLAMP |
| 12 | 11 KV F BRACKET |
| 13 | DANGER BOARD |
| 14 | HENLEY TYPE TAILESS UNIT PROTECTION CUBICAL PANEL 500A 650 VOLT FOR 250 KVA DT |
| 15 | THREE PHASE DISTRUBUTION BOX CLAMP |
| 16 | Part- B CarrigeLOADING UNLOADING AND CARRIAGE OF LINE ITEM FROM PADRAUNA STORE TO SITE 0-50 KM WITH SAFETY (i) PCC POLE 8.5 M LONG |
| 17 | PCC POLE 9 M LONG |
| 18 | ACSR WEASEL CONDUCTOR |
| 19 | LT ABC CABLE 3*50/3*95/3*120 |
| 20 | LT PVC CABLE 3.5*70 SQMM |
| 21 | LT XLPE CABLE AL 1/3.5*400 SQMM |
| 22 | 25 /63/100 KVA TRANSFORMER |
| 23 | 250 KVA TRANSFORMER |
| 24 | OTHER LINE ITEM INCLUDING PIN DISC TOP DROPPE MS CHANNEL EARTHING ROD DISTRIBUTRION BOX ETC |
| 25 | Part-C WorkERECTION OF SINGLE PCC POLE 8.5 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 26 | ERECTION OF SINGLE PCC POLE 9 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANNDARD RESPO |
| 27 | ERECTION OF DOUBLE PCC POLE 8.5 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 28 | STAY COMPLETE AS PER STANDARD RESPO |
| 29 | INSTALLATION OF 25 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING FITTING OF 3.5*70 SQMM CABLE,LUG, 11 KV FUSE SET,TOP,DROPPER,BASE CHANNEL AND EARTHING ( BODY AND NEUTRAL) |
| 30 | INSTALLATION OF 63 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING FITTING OF 3.5*70 SQMM CABLE,LUG, 11 KV FUSE SET,TOP,DROPPER,BASE CHANNEL AND EARTHING ( BODY AND NEUTRAL) |
| 31 | INSTALLATION OF 100 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING FITTING OF 3.5*70 SQMM CABLE,LUG, 11 KV FUSE SET,TOP,DROPPER,BASE CHANNEL AND EARTHING ( BODY AND NEUTRAL) |
| 32 | INSTALLATION OF 250 KVA DT WITH EARTHIN BODY AND NEUTRAL |
| 33 | PLINTH FOR 250 KVA DT (2X2X1.5 M) |
| 34 | FENCING FOR 250 KVA DT |
| 35 | SAFELY SUBMIT OF OLD 10/16 KVA TF TO PADRAUNA STORE |
| 36 | SAFELY SUBMIT OF OLD 25KVA TF TO PADRAUNA STORE |
| 37 | SAFELY SUBMIT OF OLD 63 KVA TF TO PADRAUNA STORE |
| 38 | SAFELY SUBMIT OF OLD 100 KVA TF TO PADRAUNA STORE |
| 39 | INSTALLATION OF LT FUSE SET ON 25 /63/100 KVA DT WITH ALL FITTING |
| 40 | INSTALLTION OF ABC CABLE 3*50/3x95/3x120 SQMM |
| 41 | CONSTRUNCTION OF 3PHASE 3 WIRE LINE |
| 42 | FITTING OF DISTRUBUTION BOX |
| 43 | INSTALLATION OF TAILLESS UNIT WITH ALL FITTING ON 250 KVA DT |
| 44 | TREE CUTTING Please Enable Macros to View BoQ information |