| 1 | Earth work in excavation in trenches n.exc. 1.5 M wide and 1.5M deep and getting out, returning filling in, including spreading & leveling in layers all as specified in MES SSR 2020. |
| 2 | M/L PCC bed 1:5:10 in fillings & Mass concrete all as specified in MES SSR 2020. |
| 3 | M/L RCC work 1:1½:3 for slabs supported on walls, columns , roofs, landing, balconies, canopies deck slabs and in shelves and the like all as specified in MES SSR, 2020. Note : Only OPC cement will be used for all RCC works. |
| 4 | M/L RCC work 1:1½ :3 for foundation including raft footing foundation beams plinths beams bases for columns basement slabs under reamed piles and mass concrete and the like all as specified in MES SSR, 2020. Note : Only OPC cement will be used for all RCC works. |
| 5 | M/L Brickwork in C. Mortar 1:4 Straight or curved on plan exe. 6 m mean radius with sub class 'A' bricks all as specified in MES SSR 2020. |
| 6 | M/L of brickwork with fly ash bricks class designation 75 (Kgf/cm2) straight or curved on plan exc 6m mean radius built all as specified in MES SSR 2020. |
| 7 | M/L sand filling under floors including watering & well ramming all as specified in MES SSR,2020. |
| 8 | M/L screed 15-20 mm thick in C. mortar 1:4 for laying of marble/tiles all as sp. in MES SSR 2020. |
| 9 | S/f of Marble tiles upto 0.60 Sqm x20mm thick machine cut, bedded jointed and pointed with grey cement slurry including cutting and polishing type (excluding screed)White Marble. |
| 10 | S/F machine cut kota stone slab flooring 20-25mm thick over cement screed base laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete all as specified in MES SSR, 2020. (Excluding screed). |
| 11 | Use & waste of formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of Foundation and Plinth Beams and similar work; vertical or to batter fair finished surface all as sp. in MES SSR 2020. |
| 12 | Use & waste of formwork to soffits of suspended slabs such as roof slabs, floor slabs, Columns, beams, landings and similar work, not exceeding 200mm thick (Horizontal or sloping)fair finished surface all as sp. in MES SSR 2020. |
| 13 | S/F Mild steel bars 10 mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hoping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips all specified in MES SSR, 2020. |
| 14 | M/L PC plaster 12 mm thick in cement mortar 1:4, fair finishes over and without using extra cement all as specified in MES SSR, 2020. |
| 15 | M/L glazed ceramic tiles 300 mm x 200mm or 300 mm x 300 mm x 7 mm thick etc. on walls set and jointed in neat cement slurry and pointed in white or colored cement to match all as specified in MES SSR,2020 ( colored tiles). |
| 16 | S/F Aluminium Frame (color coated) Made of Aluminium rectangular section of 1.3 mm Thickness of size 2 ½” x 1 ½” Complete including fixing of 5 mm thick Glass Black/Brown for widows, doors & partly fixed partly openable frame, including hinges door closer, handle etc. complete all as specified in MES SSR 2020. |
| 17 | Providing & fixing 10-12mm thick plaster of paris ceiling (Gypsum anhydrous) to flat surface (RCC ceiling surface) with design as per requirement and approved by the Engineer-in-charge all as specified in MES SSR, 2020. |
| 18 | M/L point wiring for one light point or one fan point controlled by one switch with cables 1.5 Sqmm in size copper conductor PVC sheathed single core in PVC conduit all as sp. in MES SSR 2020. |
| 19 | M/L for modular switch 1 way 6A 1 module complete all as sp. in MES SSR 2020. |
| 20 | M/L Putty two coats grinding plaster surface with sand paper, putty filling again grinding to even smooth surface and one coat of primer followed by two coats of premium Acrylic emulsion such as Asian/nerolac/Berger or equivalent to smooth interior finish all as sp.(on ceiling/walls) |
| 21 | M/L Putty two coats grinding plaster surface with sand paper, putty filling again grinding to even smooth surface and one coat of primer followed by super fine roller coat finish of spectrum or equivalent to be applied with foam Roller, Finally coated with two coat premium exterior emulsion/Apex or equivalent all as sp. |
| 22 | S/F framed work such as grills, grating, etc., with ends of bars shouldered and/ or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters ;trusses, M.S. pipe purlins, M.S bar fencing, walk ways; railings; frame work of water tanks and similar work confirming to Fe 410-0 or Fe 310-0 all as specified in MES SSR, 2020. |
| 23 | S/F of pre-painted galvalume aluminum zine coating GI based corrugated steel sheet 0.50 mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall fixed with self tapping screws as specified in MES SSR 2020. |
| 24 | The other works to be carried out shall be payable as per MES Schedule of rate all as specified in MES SSR 2020. Please Enable Macros to View BoQ information |