| 1 | DW-DMB-RCC-MM) Dismantling RCC by Manual/ By using deploying machineries carefully stacking |
| 2 | DW-B/S-CMW-U3) Dismantling, clearing away and carefully stacking materials |
| 3 | DM-R-E-SE) Dismantling clean and Removal of surplus earth available in the site |
| 4 | DM-FL-TI-CM) Dismantling floor finish & Dadooing walls in cement mortar with Mosaic tiles/Glazed tiles |
| 5 | BW-MW-KB-CM 1:6) Brick Work in Cement Mortor 1:6 (one of cement and six of crushed stone sand) including mortor plasticizer (Liquid) at 200ML per Bag) using kiln burnt country bricks of size 8%\\"x4\\"x2\\" (22x11x7cm) In First Floor |
| 6 | PL-OU-CM 1:5-12MM) Plastering with CM 1:5 (one of cement and five of crushed stone sand) including mortor plasticizer (Liquid) at 200ML per Bag) 12mm thick |
| 7 | PL-CL-CM 1:3 10MM THICK) Special Ceiling plastering in Cement Mortar 1:3 (one of cement and three of crushed stone sand inlcuding Mortar plasticizer (liquid) at 200ML per Bag)10mm thick |
| 8 | JN-JVC-D-SL-L) Providing and fixing factory made Polyvinyl Chloride (PVC) Door frame of size 50x47mm |
| 9 | Pointing the pressed tile over the roof with cement mortar 1:3 (One of Cement and three of crushed stone sand) |
| 10 | CN-F&S-PCS-M-20-20/40) Providing precast concrete slab for cupboard ward robes40mm thick CN-FB-PCS-M20-40) In Foundation and Basement |
| 11 | CN-SS-PCS-M20-40-(1F) In First floor |
| 12 | CN-F&S-RCC-M20) Providing and laying in position, Standardised Concrete Mix M-20 Grade in a accordance with IS:456-2000 using 20mmCN-SS-RCC-M20-(FF) In Foundation &Basement |
| 13 | CN-SS-RCC-M20-(GF) In Ground Floor |
| 14 | CN-SS-RCC-M20-(1F) In First floor |
| 15 | RE-RTS-FE-NC) Supplying, fabricating and placing in position of Mild steel Grills / Ribbed Tor Steels (without cement slurry) |
| 16 | TL-FL-CT-CM-1:3) Supplying and fixing of colour ceramic tiles Anti skid with corrugated - Grout (Tile Joint Filler) |
| 17 | TL-WL-GZT-CM-1:2) Supplying and fixing of Colour glazed tiles of best approved quality (the colour and shade shall be got approved from the executive engineer before using) over cement plastering in cm 1:2 with Grount (TILE Joint Filler) |
| 18 | SA-IN-EWC-W) Supplying and fixing EWC Superior Variety (white) 500mm with PVC SWR grade |
| 19 | WS-IN-CP-LBT) Supplying and fixing of half turn C.P Long body Tap of 15mm dia of best quality including cost of half turn CP tap |
| 20 | WS-IN-CP-SBT) Supplying and fixing of half turn C.P short body Tap of 15mm dia of best quality including cost of half turn CPtap |
| 21 | WS-EX-ASTM-PVC) Supplying, laying. fixing and jointing the following PVC pipes as per ASTM D-1785 of schedule 40 WS-EX-ASTM-32PVC) 32MM DIA |
| 22 | WS-EX-ASTM-32PVC) 25MM DIA |
| 23 | WS-IN-HW-20-FC) Supplying Laying and fixing of the 20mm dia GI Pipe \\"B\\" Class Fully concealed |
| 24 | EL-IN-EF-FH) Supply and fixing of best approved superior variety concealed type fibre box with M.S.Fan Hook |
| 25 | EL-EX-EF-SL-25W) Supplying and fixing of 25 watts LED Bulb with street light |
| 26 | EL-IN-LED-F-TL) Supply and fixing of 4\\" Long 18 W Crystal glass LED Tube light |
| 27 | EL-IN-EF-F) Supply and delivery of following Electric Ceiling fan with ISI mark with blades and double ball bearing. capacitor.etc., complete with 300mm down rod, canopies, capacitor, shackle blades with dimmer electronic regulator EL-IN-EF-48F) 48\\" Electric fan 1200mm sweep |
| 28 | EL-IN-EF-AC) Charges for assembling and fixing of ceiling fan |
| 29 | WS-EX-RWD-75) Supplying and fixing of 110mm dia PVC SWR pipe with ISI mark conforming to IS 13952:1992- type 'A' for Rain water down fall pipeWS-EX-RWD-75) 110MM DIA PVC SWRPIPE |
| 30 | WS-EX-RWD-110) 75MM DIA PVC SWR PIPE |
| 31 | SA-IN-NT-PVC) Supplying and fixing of PVC Nahani Trap not less than 75mm 4 way/2 way (Superior variety) |
| 32 | PA-CE-WW-SL-3C) White washing three coats using clean shell |
| 33 | EL-IN-WR-2X1.5M2) Run off Main with 2 Wires of 1.5Sq.MM PVC insulated Fully concealed |
| 34 | EL-IN-WR-2X2.5M2) Run off Main with 2 Wires of 2.5Sq.MM PVC insulated Fully concealed |
| 35 | PA-IN-PEP-EC BPC) Painting the falce ceiling / New Walls with two coats of Plastic Emulsion Pain |
| 36 | PA-IN-OWP-2C EP) Painting the old wood work with two coats of Approved 1st class Thorough Scapping |
| 37 | FW-FW-WOS-RCC) Providing Form work and centering for reinforced cement concrete works including supports and strutting up to 3.30m heightFW-SS-WS-PS) Plain surfaces such as Roof slab, floor slab, Beams, lintels, lofts, sill slab, staircase waist, portico slab and other similar works |
| 38 | EL-IN-WR-2 X 4M2) Run off main with 2 wires of 4 Sq.MM PVC Insulated Fully Concealed |
| 39 | Weathering course with broken brick jelly 20mm gauge |
| 40 | TL-RO-PT-CM-1.3) Finishing the top of roof with one course of pressed tiles of approved superior quality of size 23CM X 20MM Thick |
| 41 | TL-FL-NVT-CM 1:3) Supplying and fixing of stain free Nano Polish vitrified tiles of size (600 x 600 x 8mm) for flooring |
| 42 | SA-IN-WB-P) Supplying and fixing of following porcelin wash hand basin superior variety of size 550 x 400mm Please Enable Macros to View BoQ information |