| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 2 | 12mmcementplasterofmix:1:4(1cement:4coarsesand) |
| 3 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 4 | Providingandapplyingwhitecement-basedputtyofaveragethickness1mm,of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 5 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC(VolatileOrganicCompound)contentlessthan50gram/litre,ofapproved brandand manufacturerincludingapplyingadditionalcoatswherever required toachieveevenshadeandcolour.Old work(one or morecoats) |
| 6 | Paintingwithsyntheticenamelpaintofapprovedbrandandmanufactureof required colour to give an even shade :(a) One or more coats on old work |
| 7 | Distemperingwith1stqualityacrylicdistemper(readymixed)havingVOC content less than 50 gram/litre, of approved manufacturer and of required shade and colour all complete to achieve even shade and colour : New work (two a or more coats) over and including water thinnable priming coat with cement primer havingVOCcontentlessthan50gram/litre |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate)finishedwithafloatingcoatofneatcement,includingcementslurry, but excluding the cost of nosing of steps etc. complete.(a)40mmthickwith20mmnominalsizestoneaggregate. |
| 9 | Weldingbygasorelectricplantincludingtransportationofplantatsiteetc. complete. |
| 10 | Renewingglasspanes,withputtyandnailswherevernecessaryincludingracking out the old putty:(a) Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm) |
| 11 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead (I) of area 3 sq. metres and below |
| 12 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part1)non-decorativetype,coreofblockboardconstructionwithframeof1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters: 30 mm thick including 1SI marked Stainless Steel butt hinges with necessary screws |
| 13 | Steel work welded in built up sections/ framed work, including cutting, hoisting,fixinginpositionandapplyingaprimingcoatofapprovedsteelprimer using structural steel etc. as required.(a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 14 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trussesetc.,includingcutting,hoisting,fixinginpositionandapplyinga primingcoatofapprovedsteelprimer,includingweldingandboltedwithspecial shaped washers etc. complete.: Hot finished welded type tubes |
| 15 | Providing and laying integral cement based water proofing treatment includingpreparation of surface asrequiredfortreatmentof roofs, balconies, terracesetc consisting of following operations:(a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer- in-charge over the RCC slab including adjoining walls upto 300 mm heightincludingcleaningthesurfacebeforetreatment.(b)Layingbrickbatswithmortarusingbrokenbricks/brickbats25mmto115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs(c)Aftertwodaysofpropercuringapplyingasecondcoatofcementslurryusing2.75 kg/ sqmof cement admixed with waterproofing compound conforming to IS : 2645 and approved by Engineer-in-charge.(d)Finishingthesurfacewith20 mmthickjointlesscement mortarofmix1:4(1 cement:4coarsesand)admixedwithwaterproofingcompoundconformingto IS:2645andapprovedbyEngineer-in-chargeincludinglayingglassfibrecloth ofapprovedqualityintoplayerofplasterandfinallyfinishingthesurfacewith trowelwithneatcementslurryandmakingpatternof300x300mmsquare3 mm deep(e)Thewholeterracesofinishedshallbefloodedwithwaterforaminimumperiod of two weeks for curing and for final test. “All above operations to bedoneinorderandasdirectedandspecifiedbytheEngineer-in-Charge”:With averagethicknessof120mmandminimumthicknessatkhurraas65mm |
| 16 | Providingandfixingprecoatedgalvanisedironprofilesheets(size,shapeand pitchofcorrugationasapprovedbyEngineer-in-Charge)oftotalcoated thickness0.50mm(basemetalofminimum0.45mmthicknesswithtotal coatingthicknessof0.05mm)withzinccoating120gramspersqmasperIS: 277,in240mpasteelgrade,5-7micronsepoxyprimeronbothsideofthesheet andpolyestertopcoat15-18microns.Sheetshouldhaveprotectiveguardfilm of25micronsminimumtoavoidscratchesduringtransportationandshouldbe suppliedinsinglelengthupto12metreorasdesiredbyEngineer-in-charge.Thesheetshallbefixedusingselfdrilling/self-tappingscrewsofsize(5.5x55 mm)withEPDMseal, completeuptoanypitchinhorizontal/verticalorcurved surfaces,totalexcludingthecostofpurlins,raftersandtrussesandincluding cutting to size and shape wherever required. |
| 17 | Providing and fixing APP (Atactic Polypropylene Polymer) modified prefabricated five layer 2 mm thick water proofing membrane, black finished reinforced withglassfibremattconsistingofacoatofbitumenprimerforbitumenmembrane@0.40litre/sqmbythesamemembrancemanufactureofdensityat25°C,0.87-0.89 kg/ litre and viscosity 70 - 160 cps. Over the primer coat the layer of membrane shall be laid using Butane torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength inm longitudinal andtransverse direction at 23°C as 350/300 N/ 5 cm. Tear strength in longitudinal and transverse direction as 60/80N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacture of membrane.(a)2mm(forcorrugatedroofsheets) |
| 18 | Chippingofunsound/weakconcretematerialfromslabs,beams,columnsetc. withmanualChiseland/orbystandardpowerdrivenpercussiontypeorof approvedmakeincludingtaperingofalledges,makingsquareshouldersof cavities including cleaning theexposed concrete surface and reinforcement withwirebrushesetc.anddisposalofdebrisforallleadandliftsallcompleteasper directionofEngineer-In-Charge:75mmaveragethickness |
| 19 | Providing,mixingandapplyingbondingcoatofapprovedadhesiveonchipped portion of RCC as per specifications and direction of Engineer-In-charge completeinallrespect.:SBRPolymer(@10%ofcementweight)modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specifiedproportionofapprovedpolymer |
| 20 | Providing,mixing andapplying SBRpolymer(ofapprovedmake) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used)as per specifications and directions of Engineer-in-charge.Note: Measurement and payment: The pre- measurement of thickness shall be donejust after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding/ tapping with a blunt metal instrument and/or the 75 mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2). :25 mm average thickness in 2 layers. |
| 21 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08%andconformingtoIS:15622,ofapprovedmake,inallcoloursandshades,laidon 20mmthickcement mortar1:4(1cement:4coarsesand),jointingwithgrey [email protected]/sqmincludinggroutingthejointswithwhitecement andmatchingpigmentsetc.,complete.:SizeofTile600x600mm |
| 22 | Deductfornotusing20mmthickcementmortar1:4(1cement:4coarsesand) [email protected]/ sqm. |
| 23 | Fixing glazed/ Ceramic/ Vitrified floor tiles with cement based high polymermodified quick-set tile adhesive (Water based) conforming to IS: 15477,inaverage 3mm thickness. |
| 24 | Supplyingandfixingrollingshuttersofapprovedmake,madeofrequiredsizeM.S.Iaths,interlockedtogetherthroughtheirentirelengthandjointedtogether at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.:80x1.20 mm M.S. Iaths with 1.20 mm thick top cover |
| 25 | Disposalofmoorum/buildingrubbish/malba/similarunserviceable,dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for all leads and lifts, complete as per directions of Engineer-in-charge.(The item is applicable in urban areas having directions for restricted hours for movement/ plying of load carrying motor vehicle of 3.5 cum or more.) The rate includes the dumping& disposalchargesofC&DprocessingplantsauthorisedbyGovt.(Thisitemshall be paid only after the deposition of payment receipt by the agency issued from approved municipal dumping ground) |
| 26 | Correction factoronal litem of DSR 2023 on account of GST @0.973 |
| 27 | Add3%costIndex Please Enable Macros to View BoQ information |