| 1 | Excavation in foundation in ordinary soil( Loam,clay or sand) including lift up to 1.5 M,and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplush earth as directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches (Where machine con not reach/move) For building work only,(Excluding royalty) |
| 2 | Earthwork in cutting or in embankment by manual mean in ordinary soil, excavationto be in the from of regular pits not exceeding1/2 meter (20\\") depth and earth work in embankment to be in 20cm (8\\") layers including ramming and dressing the surface to required level and slopes and also including 1.5 M(5') lifts and 30M (100ft) lead.distanceas directed by the engineer-in-charge |
| 3 | Cement Concrete with 4cm gauge approved Stone ballast coarse sand and cement in proporation of 12:6:1 inculuding supply of all materail labour and T&P etc.required for proper completion. |
| 4 | M-150 brick work in One part cement and Six part Fine sand in foundation and plinth including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 303 |
| 5 | M-150 brick work in One part cement and Six part Fine sand in superstructure including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 303 & 310. |
| 6 | 12mm thick plaster in 1:4 with one part cement and four part of approved coarse sand mortar including supply of all material, labour and T&P etc. required for proper completion of work. |
| 7 | Cement Concrete with 4cm gauge approved stone ballast coarse sand and cement in proporation of 4:2:1 but with 2 cm gauge stone grit instead of 4cm gauge stone ballast including supply of all materials labour and T&P etc for proper completion of work. |
| 8 | R.C.C raft foundation work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:1.5:3 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. |
| 9 | R.C.C lighter beam having spans upto 6M work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:2:4 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. |
| 10 | R.C.C columns work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:1.5:3 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. |
| 11 | supplying, fitting and placing un-coated HYSD bar Reinfrcement in foundation complete as per Drawing and Technical Specifications complete as per MORTH IInd Revision 2019 Specification 1600. |
| 12 | Mild steel of iron of samll size and section such as holding down bolts hold fast road,grathings etc of fabrication of hold fast nosing hold fast including bending for proper completion of the work |
| 13 | Providing and fixing flush door & window commercial quality conforming to ISI 2202 oart I (1983) including supply of all material,labour and T&P etc.required for proper completion of work |
| 14 | Supply and fixing 6 to 8 mm thick ivory or light shades vitrified tiles 600x600 mm size in flooring and skirting with 1:3 approved cement and coarse sand mortar finished with in its cement colour slurry, jointing and polished of approved quality complete including supply of all materials, labour tools and plants etc. required for proper completion of the work as per direction of Engineer-in-charge. As per Ch. 14 S.I. No. 22-5. |
| 15 | Providing wall Putty on new srface with approved quality materail of berger/J.K/Birla or similar make 2 coat |
| 16 | Applying Oil Bond distempering/ snowcem with primer coatincluding supply of all material ,labour and T&P etc.required for proper completion of work |
| 17 | Applying two coat enaimel paint over one coat primer including supply of all material ,labour and T&P etc.required for proper completion of work |
| 18 | Providing & Fixing of 6mm thick fiber board hard bord sheet lining with but joining and nails (frame work and cover fillers to be mearurement and paid for separately) |
| 19 | Supply & fixing innaurgation stone board including supply of all materials labour and T&P etc for proper completion of work. |
| 20 | Add Internal & External Elecrical Fitting @8% |
| 21 | Add Internal & External Sanitory Fitting @8% |
| 22 | Add Say amount Please Enable Macros to View BoQ information |