|
| 1 | Earth work in excavation Earth work in excavation by machanical means (hydraulic excavator)/manual means in foundation trenches or drains(not exceeding 1.5mtr.in width or 10 sqm on plan) excavated soil and disposal of surplus excavated soil as directedearth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by th within a lead of 50m including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the all kind of soil.DSR(2.8.1) |
| 2 | Providing and Laying, in cement concrete 1:4:8 (1cement : 4 Finesand : 8 stone ballast 40mm./ Nominal size) and curring complete, including cost of form work in foundation and floos.DSR(4.1.8) |
| 3 | M-150 class brick work in foundation in 1:4 etc all complete.DSR(6.1.1) |
| 4 | R.C.C. in (1:1.5:3) with cement, C/sand and 20mm gauge stone gritt i/c all comp. at site. RAFT DSR(5.1.2) |
| 5 | R.C.C. in (1:1.5:3) with cement, C/sand and 20mm gauge stone gritt i/c all comp. at site. Beam DSR(5.1.2) |
| 6 | R.C.C. in (1:1.5:3) with cement, C/sand and 20mm gauge stone gritt i/c all comp. at site. column DSR(5.2.2) |
| 7 | M-150 class brick work in super structure in 1:4 etc all complete.DSR(6.3.1) |
| 8 | R.C.C. in (1:1.5:3) with cement, C/sand and 20mm gauge stone gritt i/c all comp. at site. Beam DSR(5.3) |
| 9 | R.C.C. in (1:1.5:3) with cement, C/sand and 20mm gauge stone gritt i/c all comp. at site. Slab DSR(5.3) |
| 10 | 12mm thick plaster in 1:4 etc all complete.DSR(13.1.1) |
| 11 | Providing and Laying of1mm thick putty etc all complete.DSR(13.8) |
| 12 | Providing and Laying of acrylic smooth rxterior paint of two coat etc all complete.DSR(13.46.1) |
| 13 | Mild steel or Iron in plain work such as reinforced concrete or Reinforced brick work wrought to required shape as necessary incuding bemdimg for proper compeletion of the work and including supply of steel its wastage bend books and authorised overlapping sall be measured upto floor two level.DSR(5.22.1) |
| 14 | Centering and Shuttring including strutting propping etc and removal of form for Raft DSR(5.9.1) |
| 15 | Centering and Shuttring including strutting propping etc and removal of form for Col DSR(5.9.6) |
| 16 | Centering and Shuttring including strutting propping etc and removal of form for Beam DSR(5.9.5) |
| 17 | Centering and Shuttring including strutting propping etc and removal of form for Slab DSR(5.9.20) |
| 18 | Supply and fixing of flush door and window etc all complete. |
| 19 | Providing and Laying of iron paint etc all complete. |
| 20 | Providing and Laying, in cement concrete 1:4:8 (1cement : 8 Finesand : 8stone ballast 40mm./ Nominal size) and curring complete, including cost of form work in foundation and floos.DSR(4.1.8) |
| 21 | Providing and fixing of first quality saramic glazed floor tiles etc all complete. DSR(11.37A) |
| 22 | Provinding and fixing of first quality saramic glazed wall tiles etc all complete. |
| 23 | Supply & Fixing of Granite stone with letter writing board. |
| 24 | Dismentling of Rcc slab etc all complete DSR(15.3) |
| 25 | Dismentling of existing plaster etc all complete.DSR(15.56) |
| 26 | 12mm thick plaster in 1:4 etc all complete.DSR(13.1.1) |
| 27 | Providing and Laying of1mm thick putty etc all complete.DSR(13.8) |
| 28 | Providing and Laying of acrylic smooth exterior paint of two coat etc all complete.DSR(13.46.1) |
| 29 | Divyang shauchalaya |
| 30 | Interlocking work. |
| 31 | Multiple hand wash. |
| 32 | GST @ 18% Please Enable Macros to View BoQ information |