Name of Work:- AM & R Of Galdera Dam, Dujana Dam,Takhatgarh Dam For The Year 2026-27
Sl. No.
Item Description
1
Civil Work
2
Cutting & clearance of jungle, bushes, shrubs Ankra/lpomoea, Julieflora tpna etc. on canals and bunds in dry/moist/slushy conditions including disposal as per instructions of the engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick
3
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. (b).With lead beyond 250 m and up to 750 m (for average lead ½ Km) 17(b) Deduct in item no 16(a) to (d) above if Standard Proctor's density to be achived is at least 90%
4
Supplying of well stitched earth filled bags of capacity, weigh not less than 40 kg per bag at site etc. complete. Plastic bag
5
Empty bag of 50 kg capacity in good condition Plastic / Polythene
6
Providing and applying grease of approved quality to gate and hoist components requiring greasing as part of annual maintenance using grease gun wherever necessary including cost of all materials, machinery, labour, scaffolding etc. complete.
7
Providing and filling/ replacing gear oil of approved quality up to the required gauge level for Reduction gear unit of hoists/ gantry cranes including cost of all materials, machinery, labour with all leads and lifts etc. complete.
8
Painting standard type gauge with black, red and white un-washable paints including cost of material
9
UNSKILLED Beldar/ Coolie / Chowkidar / Water man / Earthdresser
10
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. Add extra over item no. 1 to 7 for (a) Masonry work in superstructure
11
Inspection Vehicles with driver such as car /jeep/Boler or equivalent model not older than two years but including or GST , higher charges without diesel but with operational staff M.oil spares and lubricants model not older than 2 years
12
Supply of Diesel excluding contractor profit and GST input. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.