|
| 1 | Electricity Distribution Division-RUDHAULI, Basti |
| 2 | Safe Loading carrige & Unloading of PCC Poles from store to different work site |
| 3 | Safe Loading & Carriage of 25 & 63 KVA Transformer From Store to Site |
| 4 | Loading carrige & Unloding of Remaining HT/LT Line & other material (ACSR Weasal+ABC Cable) from store to Different work site |
| 5 | Safe Loading & Carriage of 100 & 250 KVA Transformer From Store to Site |
| 6 | Errection of Single PCC Pole with all fitting at Different Work Site |
| 7 | Errection of Double PCC Pole with all fitting at Different Work Site |
| 8 | Laying, Stringing, Tentioning & Binding of New Weasel Conductor of HT overhead Line |
| 9 | Laying, Stringing, Tentioning & Binding of New ABC Cable(3*50 Sq. Mm, 3*95 Sq. Mm, 3*120 Sq. Mm.) of LT Line |
| 10 | Safe Mounting & Charging of 25/63/100/250 KVA TF on Double Pole |
| 11 | Safe Unmounting of 10/16/25/63/100 KVA TF Old & Used from Double Pole |
| 12 | Safe Loading & Carriage of 10/16/25/63/100 KVA transformer from Different work site |
| 13 | Constructon of transformer plinth size 2x2x1.5 mitr Solid with bricks work in ratio 1:4:8 with cement, Cource sand & Bricks Baillat laid on the base & 75 MM thick on all Exposed sides to the plinth for transformer |
| 14 | Constructon of Fencing for transformer Size 3x2.4 mitr Including cost of MS Angle Size 40x40x5 mm & MS Flat size 35x5 fixing of welded steel wire fire bricks of steel frame with required all material |
| 15 | Chemical Earthing installation charge |
| 16 | Installation charges of Fuse set with SMC Box |
| 17 | Installation charges of Tailless Unit with all fitting as per satnderd specifications |
| 18 | Earthing of PCC Pole as per satnderd specifications |
| 19 | Earthing of DTR as per satnderd specifications |
| 20 | Grouting of Stay |
| 21 | Grouting of PCC Pole with Cement Bricks Ballast & coarse sand as per satnderd specifications |
| 22 | Decenterlized Materials |
| 23 | Supply for T/F Lug size 240 mm sq. For 250 KVA T/F |
| 24 | Supply for T/F Lug size 120 mm sq. For 100 KVA T/F |
| 25 | Clamp for T-OFF, Top, Dropper |
| 26 | GI Wire 8 SWG |
| 27 | Dead End Clmap |
| 28 | Suspention Clmap |
| 29 | Eye Hook |
| 30 | Disribution box |
| 31 | Copper Z-Clamp |
| 32 | Chemical Earthing |
| 33 | GI Strip |
| 34 | Tailless Unit |
| 35 | Fuse Set with SMC Box |
| 36 | Nut Bolt isM+ dh Mkfy;ksa ds NVkbZ dk dk;Z Please Enable Macros to View BoQ information |