| 1 | Name of Work: Supply of Materials and Erection for Increasing Capacity of T/F installed at 33/11 KV S/s Jahanabad Distt. Fatehpur in Business Plan 2026-27 on \\"Semi Turnkey Basis\\" under EDC, Fatehpur. |
| 2 | Supply of De-Centralised Materials |
| 3 | Control cable 4x2.5 mm2 |
| 4 | Control cable 2x2.5 mm2 |
| 5 | 11 kv Cable Jointing kit 300 mm.sq. |
| 6 | 11 kv Cable Jointing kit 3x185 mm.sq. |
| 7 | G.I. Strips of size 35x6 mm |
| 8 | G.I. Strips of size 50x6 mm |
| 9 | PG Clamp for dog conductor |
| 10 | G.I. Pipe 2\\" dia |
| 11 | Carriage of following material |
| 12 | 33 KV CTs, Single T/F Control Pannel, 33kv VCB,11 KV Outgoing. Incoming Pannel, Battery & Battery Charger and other associated accessiories etc. (availibility at concern store center of store division) |
| 13 | Erection work |
| 14 | Installation of 33 KV transformer control pannel in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. Work includs fitting of all accessories in all respect with complete connection of control cable with pannel.Grouting material will be provided by the Contractor. |
| 15 | Repairing of Existing T/F plinth size 4.46 x 3.46 x 1.0 Mtr. |
| 16 | Dismantling of Switchyard fencing for safe shifting of old 3/5 MVA power T/Fs |
| 17 | Safe Shifting & dragging of old 3/5 MVA T/F from inside to out side of Switch Yard after detaching its accessories i.e. Radiator, conservator etc and empting the T/F i.e taking out the T/F oil and disconnecting all 33 KV and 11 KV connections as well as dismantling of 11 KV cable stand and neutral stand. All tools & T&P shall be provided by the contractor. |
| 18 | Special earthing of neutral and body of 5/10MVA T/F with the help of 3 Nos.G.I. pipe 2\\" dia. length 60 feet. G.I. pipe for making of delta, and 2 nos for body earthing complete in all respect and connected with 50x6 m.m GI Strip. G.I. Pipe, G.I. Strip etc. required for completion of work in all respect shall be provided by the Contractor. |
| 19 | Earthing of each Structure erected in the yard with 35x6 mm. G.I. strip in duplicate fully welded at both ends to be connected to the earthmat, necessary G.I. strip shall be provided by the contractor. |
| 20 | Earthing of 11 KV indoor equipments, switch gears as per RESPO Drawing. with G.I. Strip of Size 50x6 mm, provided by which will be the contractor. |
| 21 | Earthing of 33 KV C.T. Structure complete as per schedule with 50x6 mm.G.I. Strip. All earthing material shall be provided by the contractor. |
| 22 | Special earthing of lightening arrestor structure with 6 Nos. additional 40 mm dia 2.5 Mtr. Long G.I. pipe electrodes/rod by digging 3 Mtr. deep pits and connecting it with L.A. through G.I. Strip 35x6 mm welded at both ends. All the material Like G.I. pipe, G.I. strip shall be provided by the contractor. |
| 23 | Laying and stringing of ACSR dog conductor for busbar between busbar gantry as well as terminal gantry. Three phase jumpering from bus to bar L.A, VCB, C.T., Post insulator and 33/11 KV T/F, Terminal Gantry, Isolator etc. properly with jumpering with P.G. Clamp, T. Clamp and Post Insulator clamp, P.G. clamp, T.clamp, A.C.S.R. Dog conductor and any other clamp required for jumpering shall be provided by the contractor. |
| 24 | painting of All structure and equipment inside the switch yard with two coats of red oxide primer and thereafter two coats of aluminium paint, giving silver white finish, painting is to be done after proper cleaning of the structures. paint, primer, thinner etc. required shall be provided by the contractor himself. |
| 25 | Providing and erection of fire stand as per drawing for fire bucket with M.S. Angle Iron 50x50x6 mm with shed of M.S. sheet to cover the bucket and stand properly. All matrial required for this work like M.S. Angle. 5 Nos fire bucket shall be provided by the contractor. |
| 26 | Laying of 11 KV 3 x /120/185/300 Sqmm. XLPE power cable by digging 0.75 Mtr. deep trench, putting layer of sand in the bottom, ramming it, laying of cable over it RMT and covering the cable from sides and top by laying bricks, finally covering the same by earth and levelling of the same, all the materials, except cable, will be provided by the contractor. Rates may be quoted per RMT |
| 27 | Laying of following copper control cable form C.T. T/F to transformer control pannel/protection Board. All control cable shall be supplied by the contractor. |
| 28 | 2x2.5 mm2 |
| 29 | 4x2.5 mm2 |
| 30 | Installation of 24 volt Battery & Battery Charger shall be provided by the Department |
| 31 | Following items shall also be provided by the contractor at the Sub-station. |
| 32 | Hand Gloves |
| 33 | Rubber Matting Please Enable Macros to View BoQ information |