|
| 1 | Annual Maintenance of INTECH make Electronic weigh bridges in Ambalamedu and Q10 FACT CD for two years (2026-2028). |
| 2 | Comprehensive Annual Maintenance and Service (AMC) for 60T Electronic Weigh Bridge at Q-10, W.Island.CAMC includes the following works:-Comprehensive Annual Maintenance Contract for 60T Electronic Weigh Bridge at Q10, W Island. The work includes on-call visit/ Breakdown visit/ service visit for routine service / calibration /preventive maintenance of weigh bridge throughout the AMC period as per Annexure II –Special Terms and condition of the work. |
| 3 | Comprehensive Annual Maintenance and Service (AMC) for 80T Electronic weigh bridge at Phase-I gypsum yard.CAMC includes the following works:-Comprehensive Annual Maintenance Contract for 80T Electronic Weigh Bridge at Phase-I gypsum Yard, Ambalamedu. The work includes on-call visit/ Breakdown visit/ service visit for routine service / calibration /preventive maintenance of weigh bridge throughout the AMC period as per Annexure II -Special Terms and condition of the work. |
| 4 | Comprehensive Annual Maintenance and Service (AMC) for 80T Electronic weigh bridge at Phase-II.CAMC includes the following works:-Comprehensive Annual Maintenance Contract for 80T Electronic Weigh Bridge at Phase II, Ambalamedu. The work includes on call visit/ Breakdown visit/ service visit for routine service / calibration /preventive maintenance of weigh bridge throughout the AMC period as per Annexure II -Special Terms and condition of the work. |
| 5 | Lifting-up& Descending down of the Weighbridge Platform for Inspection works/ Refurbishment/ Painting etc.The work involves:-i) Lifting of the entire Weighbridge platform using hydraulic jack/lifting tools to a specified height (upto 1m) as needed for any Mechanical inspections underneath the platform structure. The platform then shall be supported on Blocks/Supports provided by FACT.ii) Removal of all Load cells (max 8 numbers) from the Weighbridge after proper disconnections at the Load cell junction Box.iii) After the inspection & subsequent related works by FACT, descending the uplifted Weighbridge platform using hydraulic jack/lifting tools. All load cells to be fixed back along with proper connections at the junction Box and routing through the cable pipes. The platform shall be descended to a level just above all the Load cell corners as required for further final alignments.iv) Performing calibration check, corner testv) Checking/ ensuring normal functionality .After completion, the weigh bridge should be handed –over to FACT for stamping. |
| 6 | Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of 60T Electronic Weighbridge at Q10 area, Willingdon Island.Contractor`s scope of work:(i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges.(ii) All the transportation arrangements & related costs incurred shall be borne by the contractor.(iii) The contractor shall meet all the incidental expenses in connection with verification & stamping.(iv) All necessary tools & tackles required for the work.(v) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electronic Weighbridge at Q10 area, Willingdon Island (60T).(vi) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay.FACT’s scope of work:(i). The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT. |
| 7 | Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of 80T Electronic Weighbridge at Phase-I Gypsum yard area.Contractor`s scope of work:(i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges.(ii) All the transportation arrangements & related costs incurred shall be borne by the contractor.(iii) The contractor shall meet all the incidental expenses in connection with verification & stamping.(iv) All necessary tools & tackles required for the work.(v) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electronic Weighbridge at Phase-I Gypsum Yard area, Ambalamedu (80T).(vi) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay.FACT’s scope of work:(i) The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT. |
| 8 | Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the 80T weigh bridge at phase-II.Contractor`s scope of work:(i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges.(ii) All the transportation arrangements & related costs incurred shall be borne by the contractor.(iii) The contractor shall meet all the incidental expenses in connection with verification & stamping.(iv) All necessary tools & tackles required for the work.(v) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electronic Weighbridge at Phase-II area, Ambalamedu (80T).(vi) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay.FACT’s scope of work:(i) The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT. |
| 9 | Liaison and coordination with Legal Metrology Department for any stamping & re-verification required in addition to the regular Annual re-verification and stamping for any of the following weighbridges:(i) Electronic Weighbridge (60T) at Q10 area, Willingdon Island.(ii) Electronic Weighbridge(80T)at Phase-IGypsum Yard area, Ambalamedu.(iii) Electronic Weighbridge(80T)at Phase-II area, Ambalamedu.Contractor`s scope of work:(i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges.(ii) All the transportation arrangements & related costs incurred shall be borne by the contractor.(iii) The contractor shall meet all the incidental expenses in connection with verification & stamping.(iv) All necessary tools & tackles required for the work.(v) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay.FACT’s scope of work:(i) The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT. Please Enable Macros to View BoQ information |