|
| 1 | Annual Maintenance and up keep of Remains of an old Hindu Temple at Hathras Distt. HathrasA) Provision for House keeping and cleaning of 1 nos. toilet blocks (02 no. ladies, 02 Gents, 01 No. Handicaped , 3 no. urinals, 01 no. water plant room on tourist visiting hours and night watch and ward) per day out side the Dauji temple at Hathras including Repairing & replacement of angle cock, long & short body, connection pipe etc. for the year 2026-2027 (Details of Materials, 1- Nariyal Broom 3 Kg., 2-Phool Broom 1 No., 3- PVC Pan 1 No., 4- Soopdi 1 No., 5- Small Towle 2 Nos., 6- Wiper 1 No., 7- Toilet cleaning brush 1 No., 8- Harpic 5 ltr. 1 No., 9- Phynle 3 Nos. 10- Odonil 4 Nos., 11- Duster 1 No., 12- Hand soap liquid 200 ml 6 Nos., 13- Handwash 180 ml 1 No., 14- Toilet Perfume 1 No., 15- Garbage Polythene 60 Nos., 16- Bamboo Rod 1 No. (Included GST) |
| 2 | B) Provision for Annual maintenance of 01 No. R.O. plant 500 Ltr./Hr. running water treatment plant 01 no. water cooler 300Ltr. capacity T&P etc. installed at Dauji temple Hathras (Replacement filters and TDS report should be submitted in every month) during the year 2026-2027. Terms & condition for contractor:- (a) Changing the membrane by department when required (b) Chemical required to be used (c) Filter to be changed as and when required (d) Maintenance of the cooling system in all respect including compressor and other accessories (e) Maintenance the water supply and electric supply with all accessories (f) TDS report should be provided near the plant for the visitor and a copy to be submitted along with bill (g) One R.O. operator should be engaged 8 hours daily for each plant (h) Visit of Engineers twice in a month for proper functioning of the R.O. plant. (i) Maintenance and operating of one number submersible pump 3.00 KWT. |
| 3 | Annual Maintenance and up keep of Madan Mohan temple at Vrindavan Distt. Mathura.A) Provision for Sweeping & cleaning work of the floor and roof area in monument Madan Mohan Temple complex etc. area 2170.68 x 2 time (due to monkey waste) 4341.35 sqm. + 348.60 sqm. X 8 time in a month = 2788.80/30 = 92.96 Sqm. Per day = 4434.41 Sqm. Daily with all sweeping materials complete etc. including Repairing & replacement of angle cock, long & short body, connection pipe etc. for the year 2026-2027. (Details of Materials, 1- Nariyal Broom 3 Kg., 2-Phool Broom 1 No., 3- PVC Pan 1 No., 4- Soopdi 1 No., 5- Wiper 15” long 1 No., 6- Toilet cleaning brush 1 No., 7- Floor cleaning brush 5 Nos., 8- Duster 2 Nos., 9- Hand soap liquid 200 ml 10 Nos., 10- Handwash 180 ml 1 No., 11- Garbage Polythene 30 Nos., 12- Bamboo Rod 1 No. (Included GST) |
| 4 | B) Annual maintenance charge of 01 No. R.O. plant 500 Ltr./Hr. running water treatment plant 01 no. water cooler 300 Ltr. capacity T&P etc. installed at Madan Mohan temple, Vrindavan (Replacement filters and TDS report should be submitted in every month) during the year 2024- 2025. Terms & condition for contractor:- (a) Changing the membrane by department when required (b) Chemical required to be used (c) Filter to be changed as and when required (d) Maintenance of the cooling system in all respect including compressor and other accessories (e) Maintenance the water supply and electric supply with all accessories (f) TDS report should be provided near the plant for the visitor and a copy to be submitted along with bill (g) One R.O. operator should be engaged full day regularly for each plant (h) Visit of Engineers twice in a month for proper functioning of the R.O. plant. (i) Maintenance and operating of one number submersible pump. |
| 5 | Annual Maintenance and up keep of Govind Deo temple at Vrindavan Distt. Mathura.A) Provision for Sweeping & cleaning the floor area, approach pathway and its surrounding etc. complete are approximate 2844.27 sqm. Two Time daily (Due to monkey waste) with roof Total 5688.54 Sqm. area by manual/mechanical including Housekeeping of 2 nos. toilets with sweeping materials as specified by Department including Repairing & replacement of angle cock, long & short body, connection pipe etc. for the year 2026-2027. (Details of Materials, 1-Nariyal Broom 3 Kg., 2- Phool Broom 1 No., 3- Soopdi 1 No., 4- Wiper 15” long 1 No., 5- Toilet cleaning brush 1 No., 6- Harpic 5 ltr. 0.50 ltr., 7- Phenyl 5 Ltr., 8- Odonil 2 Nos., 9- Duster 1 No., 10- Hand soap liquid 200 ml 4 Nos., 11- Garbage Polythene 30 Nos. |
| 6 | B) Annual maintenance charge of 01 No. R.O. plant 500 Ltr./Hr. running water treatment plant 01 no. water cooler 300Ltr. capacity T&P etc. installed at Govind Deo temple Vrindavan (Replacement filters and TDS report should be submitted in every month) during the year 2026-2027. Terms & condition for contractor:- (a) Changing the membrane by department when required (b) Chemical required to be used (c) Filter to be changed as and when required (d) Maintenance of the cooling system in all respect including compressor and other accessories (e) Maintenance the water supply and electric supply with all accessories (f) TDS report should be provided near the plant for the visitor and a copy to be submitted along with bill (g) One R.O. operator should be engaged 4 hours daily for each plant (h) Visit of Engineers twice in a month for proper functioning of the R.O. plant. (i) Maintenance and operating of one number submersible pump 1.50 KWT. |
| 7 | Annual Maintenance and up keep of Jugal Kishore temple at Vrindavan, Distt. Mathura.Provision for Routine Sweeping, dusting including vegetation grass, small trees, growing of over the wall & roof & cleaning of the monument proper maintenance etc. area 889.14 x2 time (due to monkey waste) 1778.28 sqm. + 250 sqm x 8 time + 257 Sqm. 4 time vegetation work in a month = 3030.40/30 = 101.01 sqm. Per day = 1879.30 Sqm. Daily with all sweeping materials complete for the year 2026-2027. (Details of Materials, 1- Nariyal broom 2 Kg., 2- Phool broom 2 No., 3- Soopdi 2 Nos. 4- Wiper 15” long 1 No., 5- PVC Pan 2 Nos. |
| 8 | Annual Maintenance and up keep of Radha Ballabh temple at Vrindavan, Distt. MathuraProvision for Routine Sweeping & cleaning work of the floor and roof area in monument Radha Ballabh temple complex etc. area 668.10 x 3 time (due to monkey waste) 2004.30 Sqm. + 281.80 Sqm. X 8 time + 512.36 Sqm. 4 time removal of vegetation in a month = 4303.84/30 = 143.46 Sqm. Per day = 2147.76 Sqm. Daily with all sweeping materials complete for the year 2026-2027. (Details of Materials, 1- Nariyal broom 02 Kg., 2- Phool broom 01 No., 3- Soopdi 1 No., 4- Wiper 15” long 1 No. |
| 9 | Annual Maintenance and up keep of Kankali tila jail and choubara mound at Mathura Distt. Mathura.Provision for Housekeeping of toilet and cleaning of office in monument premises, removal of vegetation from the walls and structure and day to day maintenance of monument including Repairing & replacement of angle cock, long & short body, connection pipe etc. for the year 2026-2027. (Details of Materials, 1-Nariyal Broom 5 Kg., 2- Phool Broom 1 No., 3- Soopdi 1 No., 4- Small towle 2 Nos., 5- Wiper 15” long 1 No., 6- Toilet cleaning brush 1 No., 7- Harpic 5 ltr. 1 ltr., 8- Phenyl 5 Ltr., 9- Odonil 5 Nos., 10- Duster 1 No., 11- Hand soap liquid 200 ml 6 Nos., 12- Handwash 180 ml, 13-Toilet Perfume 1 No., 14-Garbage Polythene 60 Nos. Please Enable Macros to View BoQ information |