| 1 | Supply of following materials:- Additional 5 MVA T/F at 33/11 KV S/S Sukrit, Sonbhadra the works site as per RESSPO norms. (Provided by Contractor) |
| 2 | Transformer connecting clamp |
| 3 | PG clamp suitable for dog conductor |
| 4 | LA connecting clamp suitable for dog conductor |
| 5 | Post connecting clamp suitable for dog conductor |
| 6 | CT connecting clamp suitable for dog conductor |
| 7 | Cable stand |
| 8 | VCB connector suitable for dog conductor |
| 9 | 90 LBS rail pieces (44.6KG /M) |
| 10 | 24 Volt battery & battery charger with cabinet |
| 11 | Control cable copper 2x2.5 sqmm |
| 12 | Control cable copper 4x2.5 sqmm |
| 13 | Control cable copper 6x2.5 sqmm |
| 14 | Cable joining Kit 3×300 SQ MM 11 KV O/D |
| 15 | Cable joining Kit 3×300 SQ MM 11 KV I/D |
| 16 | Structure for L.A. |
| 17 | Structure for 33 KV CT (as post insulator structure used for 33 KV CT) |
| 18 | Structure for bus isolator |
| 19 | Structure for post insulator |
| 20 | Neautral stand |
| 21 | Terminal Gantry |
| 22 | 33 KV Fuse Set with structure |
| 23 | Structure for 33 KV VCB (as line isolator structure used for 33 KV VCB) |
| 24 | Providing fire extinguisher for 33/11 KV S/S (04 no. dry powder type, 04 no. CO2 type) |
| 25 | Providing & Installation of LED street lights in switch yard/campus with installation of street light poles, also providing and connecting ON/OFF switch |
| 26 | Cable joining Kit 3×185 SQ MM 11 KV O/D |
| 27 | Cable joining Kit 3×185 SQ MM 11 KV I/D |
| 28 | Cartage of following materials from ESC, Mirzapur/Bhadohi/Sonbhadra to work site & remaining material from the work site to the ESC, Mirzapur/Bhadohi/Sonbhadra including loading & unloading charge. (Provided by Department) |
| 29 | 5 MVA transformer |
| 30 | 33 KV LA |
| 31 | 33 VCB with T/F control panel and CT 200/100/1A |
| 32 | (I) 33 KV VCB |
| 33 | (II) Control panel I/C for 33 kv single T/F |
| 34 | (III) CT 200/100/1-1A |
| 35 | 33 KV Bus Isolator |
| 36 | 33 KV Post Insulator |
| 37 | 11 KV VCB incoming CTR 600/300/5A 350MVA |
| 38 | 11 KV VCB outgoing |
| 39 | 11 KV Bus Coupler 350 MVA |
| 40 | 11 KV 3×300 SQ MM Cable XLPE |
| 41 | ACSR Dog Conductor |
| 42 | Disc Insulators B&S type 7000 Kg Polymeric |
| 43 | Disc fitting Dog |
| 44 | 11 KV 3×185 SQ MM Cable XLPE |
| 45 | 33 KV Pin Insulator Polymeric |
| 46 | ERECTION OF WORK |
| 47 | Transformer connecting clamp |
| 48 | PG clamp suitable for dog conductor |
| 49 | LA connecting clamp suitable for dog conductor |
| 50 | Post connecting clamp suitable for dog conductor |
| 51 | Cable stand |
| 52 | 90 LBS rail pieces (44.6KG /M) |
| 53 | 24 Volt battery & battery charger with cabinet |
| 54 | Control cable copper 2x2.5 sqmm |
| 55 | Control cable copper 4x2.5 sqmm |
| 56 | Control cable copper 6x2.5 sqmm |
| 57 | Cable joining Kit 3×300 SQ MM 11 KV O/D |
| 58 | Cable joining Kit 3×300 SQ MM 11 KV I/D |
| 59 | Structure for L.A. |
| 60 | Structure for 33 KV CT (as post insulator structure used for 33 KV CT) |
| 61 | Structure for bus isolator |
| 62 | Structure for post insulator |
| 63 | Neautral stand |
| 64 | Terminal Gantry |
| 65 | 33 KV Fuse Set with structure |
| 66 | Structure for 33 KV VCB (as line isolator structure used for 33 KV VCB) |
| 67 | Providing fire extinguisher for 33/11 KV S/S (04 no. dry powder type, 04 no. CO2 type) |
| 68 | Providing & Installation of LED street lights in switch yard/campus with installation of street light poles, also providing and connecting ON/OFF switch |
| 69 | Cable joining Kit 3×185 SQ MM 11 KV O/D |
| 70 | Cable joining Kit 3×185 SQ MM 11 KV I/D |
| 71 | 5 MVA transformer |
| 72 | 33 KV LA |
| 73 | 33 VCB with T/F control panel and CT 200/100/1A |
| 74 | (I) 33 KV VCB |
| 75 | (II) Control panel I/C for 33 kv single T/F |
| 76 | (III) CT 200/100/1-1A |
| 77 | 11 KV VCB incoming CTR 600/300/5A 350MVA |
| 78 | 11 KV VCB outgoing |
| 79 | 11 KV Bus Coupler 350 MVA |
| 80 | ACSR Dog Conductor |
| 81 | Disc Insulators B&S type 7000 Kg Polymeric |
| 82 | Disc fitting Dog |
| 83 | 33 KV Pin Insulator Polymeric |
| 84 | Plinth of transformer |
| 85 | Plinth of VCB |
| 86 | Neutral Earthing of transformer with material as delta earthing in very hard rock area |
| 87 | Body earthing of transformer with material in very hard rock area |
| 88 | Earthing of all structure like VCB, CT, Post insulater, Bus isolater etc. by boring earthing & connect it with all materials |
| 89 | Earthing of LA in very hard rock area by boring earthing including with all materials |
| 90 | Painting of all old and new structure |
| 91 | Earthing of indoor equipment by making boring earthing and connecting it all old & new pannel in very hard rock area |
| 92 | Laying of 11 kv cable |
| 93 | Making of 11 kv cable boxes and connect with DP/Transformer/Pannel |
| 94 | Wiring and connection of switch gear and transformer |
| 95 | Making control cable trench |
| 96 | Concreting & muffing of all new structure |
| 97 | Cutting of stone in switchyard |
| 98 | Leveling of switchyard |
| 99 | Laying of stone ballast in switchyard |
| 100 | Centrifusing of T/F oil & replacement of gaskit/packing of power T/F |
| 101 | Installation, fixing & connecting of 11KV I/C VCB,O/G VCB inside Control Room |
| 102 | Installation, fixing & connecting of 11KV Bus Coupler VCB inside Control Room |
| 103 | Installation, fixing & connecting of 33KV VCB Control Panel inside Control Room |
| 104 | Expansion of control room(approx. 6.5 mtr in length with existing height and width) with provision of covered window and entry in control room with mettalic door, jointing slab/roof with proper safety, making the roof of whole control roon with brick & sand to avoid water logging, leakage/seapage |
| 105 | Making new trench for new fabrication and also repairing of old trench inside control room(open) and in yard (covered) |
| 106 | Making protection wall (10 inch thick) between power T/Fs with plastering over it.(Approx size 12ft*15ft) |
| 107 | Demolition of brick wall for entry of Power T/F. and providing & fixing of 02 nos Mettalic Gates (approx 6.5 mtr wide upto boundry wall height) for entry and exit of Power T/Fs |
| 108 | Barbed wire fencing on boundry wall of Substation.(approx 160 mtr running length) |
| 109 | Supply of following materials:- Increasing capacity of 33/11 KV S/S Kone, Sonbhadra from 5+8 MVA to 5+10 MVA the works site as per RESSPO norms. (Provided by Contractor) |
| 110 | Transformer connecting clamp |
| 111 | PG clamp suitable for dog conductor |
| 112 | LA connecting clamp suitable for dog conductor |
| 113 | CT connecting clamp suitable for dog conductor |
| 114 | Cable stand |
| 115 | 90 LBS rail pieces (44.6KG /M) |
| 116 | 24 Volt battery & battery charger with cabinet |
| 117 | Control cable copper 2x2.5 sqmm |
| 118 | Control cable copper 4x2.5 sqmm |
| 119 | Control cable copper 6x2.5 sqmm |
| 120 | Cable joining Kit 3×300 SQ MM 11 KV O/D |
| 121 | Cable joining Kit 3×300 SQ MM 11 KV I/D |
| 122 | Neautral stand |
| 123 | 33 KV Fuse Set with structure |
| 124 | Cartage of following materials from ESC, Mirzapur/Bhadohi/Sonbhadra to work site & remaining material from the work site to the ESC, Mirzapur/Bhadohi/Sonbhadra including loading & unloading charge. (Provided by Department) |
| 125 | 33/11 KV 10 MVA Transformer |
| 126 | 33 KV LA |
| 127 | 33 KV Line Isolator |
| 128 | 33 KV VCB |
| 129 | Control panel I/C for 33 kv single T/F |
| 130 | CT 200/100/1-1A |
| 131 | 11 KV 3×300 SQ MM Cable XLPE |
| 132 | 11 KV Bus Coupler 350 MVA |
| 133 | ERECTION OF WORK |
| 134 | Transformer connecting clamp |
| 135 | PG clamp suitable for dog conductor |
| 136 | LA connecting clamp suitable for dog conductor |
| 137 | CT connecting clamp suitable for dog conductor |
| 138 | Cable stand |
| 139 | 90 LBS rail pieces (44.6KG /M) |
| 140 | 24 Volt battery & battery charger with cabinet |
| 141 | Control cable copper 2x2.5 sqmm |
| 142 | Control cable copper 4x2.5 sqmm |
| 143 | Control cable copper 6x2.5 sqmm |
| 144 | Cable joining Kit 3×300 SQ MM 11 KV O/D |
| 145 | Cable joining Kit 3×300 SQ MM 11 KV I/D |
| 146 | Neautral stand |
| 147 | 33 KV Fuse Set with structure |
| 148 | 33/11 KV 10 MVA Transformer |
| 149 | 33 KV LA |
| 150 | 33 KV Line Isolator |
| 151 | Control panel I/C for 33 kv single T/F |
| 152 | 11 KV Bus Coupler 350 MVA |
| 153 | Repair of Plinth of transformer |
| 154 | Neutral Earthing of transformer with material as delta earthing in very hard rock area |
| 155 | Body earthing of transformer with material in very hard rock area |
| 156 | Earthing of all structure like VCB, CT, Post insulater, Bus isolater etc. by boring earthing & connect it with all materials |
| 157 | Earthing of LA in very hard rock area by boring earthing including with all materials |
| 158 | Painting of all structure |
| 159 | Earthing of indoor equipment by making boring earthing and connecting it all old & new pannel in very hard rock area |
| 160 | Laying of 11 kv cable |
| 161 | Making of 11 kv cable boxes and connect with DP/Transformer/Pannel |
| 162 | Wiring and connection of switch gear and transformer |
| 163 | Making control cable trench |
| 164 | Laying of stone ballast in switchyard |
| 165 | Dismentling of old 8 MVA T/F from plinth & shifting at the safe place of S/S |
| 166 | Installation, fixing & connecting of 11KV Bus Coupler VCB inside Control Room Please Enable Macros to View BoQ information |