| 1 | Important Note: The Bidders shall fill 1st year rates in Row from Sl.no. 1.01 to 1.17 , 2nd year rates in Row from Sl.no. 2.01 to 2.17 . The Item at Sl no. 1.01 & 2.01 are AMC work (Fixed monthly rate) and rest are ARC work (Unit rate). |
| 2 | 1st Year Part-A Lump-sum rates per month for Part-A (Scope of work as per Annexure-III )The rates quoted should be lump sum per month including wages, ESI, EPF,T&P, consumables etc. |
| 3 | 1st Year Part-B Local shifting (with in plant) of LT motors both side & placing it on its foundation/proper position (both side) including decoupling, coupling and alignment for Above 2KW to 10 KW |
| 4 | Above10KW to 50 KW |
| 5 | Above 50 KW to 100 KW |
| 6 | Above100 KW to 180 KW |
| 7 | Laying of underground cables (depth Max upto 3 feet) including excavation, covering the cable with bricks & sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cables. Control cables (in mtr.) All size of control cables up to 10 Core |
| 8 | All size of control cables above 10 Core |
| 9 | Power cables (in mtr.) 2C/2C/4C up to size 25mm² |
| 10 | 2C/2C/4C above size 25mm² & up to 50mm² |
| 11 | 2C/2C/4C above size 50mm² & up to 70mm² |
| 12 | 2C/2C/4C above size 70mm² & up to 150mm² |
| 13 | 2C/2C/4C above size 150mm² & up to 240mm² |
| 14 | 2C/2C/4C above size 240mm² |
| 15 | Laying of power cables in cable trench/overhead (in mtr.) 2C/2C/4C up to size above 95mm2 to240mm2 |
| 16 | 2C/2C/4C up to size above 240mm2 |
| 17 | Supply of man power (in nos.) Skilled - A man power |
| 18 | Semi-skilled -A manpower |
| 19 | 2nd Year Part-A Lump-sum rates per month for Part-A (Scope of work as per Annexure-II )The rates quoted should be lump sum per month including wages, ESI, EPF,T&P, consumables etc. |
| 20 | 2nd year Part-B Local shifting (with in plant) of LT motors both side & placing it on its foundation/proper position (both side) including decoupling, coupling and alignment for Above 2KW to 10 KW |
| 21 | Above10KW to 50 KW |
| 22 | Above 50 KW to 100 KW |
| 23 | Above100 KW to 180 KW |
| 24 | Laying of underground cables (depth Max upto 3 feet) including excavation, covering the cable with bricks & sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cables. Control cables (in mtr.) All size of control cables up to 10 Core |
| 25 | All size of control cables above 10 Core |
| 26 | Power cables (in mtr.) 2C/2C/4C up to size 25mm² |
| 27 | 2C/2C/4C above size 25mm² & up to 50mm² |
| 28 | 2C/2C/4C above size 50mm² & up to 70mm² |
| 29 | 2C/2C/4C above size 70mm² & up to 150mm² |
| 30 | 2C/2C/4C above size 150mm² & up to 240mm² |
| 31 | 2C/2C/4C above size 240mm² |
| 32 | Laying of power cables in cable trench/overhead (in mtr.) 2C/2C/4C up to size above 95mm2 to240mm2 |
| 33 | 2C/2C/4C up to size above 240mm2 |
| 34 | Supply of man power (in nos.) Skilled - A man power |
| 35 | Semi-skilled -A manpower Please Enable Macros to View BoQ information |