|
| 1 | Earth work in excavation by mechanical means (HydraulicExcavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or10 sqm on plan)including dressing of sides and ramming of bottoms, lift upto 1.5m, including gettingout the excavated soil and disposal of surplus excavated soil asdirected, within a leadof 50 m,all kinds of soil. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) |
| 3 | Random rubble masonry with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 7 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinthlevel upto floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 8 | Reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete Thermo-Mechanically Treated bars above in plinth level |
| 9 | Providing and laying cement concrete in kerbs, steps,hold fast,sill and the likeat or near groundlevel excluding the cost of centring, shuttering and finishing 1:2:4 (1 Cement : 2coarse sand : 4 graded stone aggregate 20 mm nominal size). |
| 10 | 15 mm cement plaster of mix 1:6 (1 cement : 6 fine sand) incld.supply of materials, labour, T&P etc. reqd. for proper completion of work. |
| 11 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. 13.9.2 20 mm cement plaster |
| 12 | 12 mm cement plaster of mix 1:6 (1 cement : 6 fine sand) incld.supply of materials, labour, T&P etc. reqd. for proper completion of work. |
| 13 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. |
| 14 | Providing and fixing glass strips in joints of terrazo/ cement metre concrete floors. 40 mm wide and 4 mm thick. |
| 15 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering,lead up to 50 m and lift upto 1.5 m. |
| 16 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 17 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm |
| 18 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/sqm including grouting the joint with white cement & matching pigments etc. complete. |
| 19 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and including priming coat with cement primer |
| 20 | Finishing walls with Premium Acrylic Smooth Exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.43 ltr/ 10 sqm. over and including base coat of water proofing cement paint applied @2.20 kg/ 10 sqm). |
| 21 | Centring and shuttering including strutting, ropping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. |
| 22 | Centring and shuttering including strutting, ropping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. |
| 23 | Centring and shuttering including strutting, ropping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform |
| 24 | Centring and shuttering including strutting, ropping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. |
| 25 | Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer-in-charge: Fixing with adjustable lugs with split end tail to each jamb |
| 26 | Providing and fixing ISI marked flush door shutters conforming to IS: 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws. |
| 27 | Steel work welded in built up section/framed work includingm cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 28 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. all complete. Fixed to steel windows by welding. |
| 29 | Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with :4.0 mm thick glass panes |
| 30 | Providing and fixing ISI marked oxidised M.S. sliding door bolts with nuts and screws etc. complete : 250x16 mm |
| 31 | Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete : 9.66.1 125 mm |
| 32 | Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete : 200x10 mm |
| 33 | Painting Wood work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand or manufacture |
| 34 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: 13.62.1 Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture |
| 35 | Add for plaster drip course/ groove in plastered surface or moulding to R.C.C. projections. |
| 36 | Providing and fixing fly proof galvanized M.S. wire gauge to windows and clerestory windows using wire gauge with average width of aperture 1.4 mm in both directions with wire of dia 0.63 mm all complete. |
| 37 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction |
| 38 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction |
| 39 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)by the direction in Engineer-in-charge work to be execuated as per specification a rate of above given item |
| 40 | RandomRubble StoneMasonry laid Dry, in breast walls, retaining walls, etc. includingsupplyof allmaterial, labour, T&Pand royaltiiesetc. Completeasper drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction |
| 41 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) |
| 42 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) |
| 43 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete butment,wingwall,returnwallwith100mmdiaACpipeextendingthrough thefull width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 44 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. |
| 45 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 46 | 6 mm cement plaster of mix 1:3 (1 cement : 3 fine sand) incld.supply of materials, labour, T&P etc. reqd. for proper completion of work |
| 47 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 48 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) |
| 49 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate |
| 50 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 51 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured. |
| 52 | Grading roof for water proofing treatment with 22.14.1 Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size |
| 53 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : 15.12.1 Of area 3 sq. metres and below |
| 54 | Providing and fixing angle iron frames for doors, windows and ventilators mild steel Angle sections of size 35x35x5 mm, joints mitred and welded angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, complete as per the direction of Engineer-In-charge. |
| 55 | Providing and fixing ISI marked flush door shutters conforming to IS :2202 (Part 1) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters: |
| 56 | Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete (Copper oxidised as per IS 1378) |
| 57 | Lettering with black Japan paint of approved brand and manufacture Please Enable Macros to View BoQ information |