| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. |
| 2 | Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). With earth obtained from excavation of foundation. |
| 4 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) Do - by fine sand. |
| 5 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 6 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor. [Pakur Variety]. 1:3:6 proportion. |
| 7 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture]. M 25 Grade. Nalhati Variety. |
| 8 | 1st Floor. |
| 9 | 2nd Floor. |
| 10 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 m. Tor steel/Mild Steel. SAIL/ TATA/RINL. |
| 11 | 1st Floor. |
| 12 | 2nd Floor. |
| 13 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof). 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 14 | Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. |
| 15 | Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work.1st Floor. |
| 16 | Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. 2nd Floor. |
| 17 | Extra for staging beyond 4 m in any floor (Mode of measurement: area in plan x mean height of staging upto soffit of shuttering above initial 4 m). |
| 18 | Supplying,fitting & fixing granite slab 15mm to 18mm thick in floor, lobby, stair, landing and treads etc. over 20mm (avg) thick base of cement morter (1:2) laid with white cement slurry @ 4.40Kg per Square meter before placing of granite and jointed with white cement slurry @ 2.0 Kg per square meter with necessary pigments and complete as per direction of Engineer-in-charge including cost of all materials, labours, curing and roughening of concrete surface complete. In ground floor. Area of each Granite slab above 1.00 Square meter. |
| 19 | Labour for Chipping of concrete surface before taking up Plastering work. |
| 20 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface]. With 1:6 cement mortar. 20 mm thick plaster. |
| 21 | 1st Floor. |
| 22 | 2nd Floor. |
| 23 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m |
| 24 | M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor). Grill weighing above 16 Kg./sq.mtr and above |
| 25 | Supplying, fitting & fixing Glass mosaic tiles at finished plain wall surface of size 20 mm x 20 mm x 4 mm in all colour, design, fixing in customize design as per direction of Engineerin- Charge. The glass mosaic tiles to be fixed on the wall surface with the help of approved adhesive applied at the rate of 2.5 kg per sqm and grouting of the same. The rate is inclusive of all operation, material and required pattern approved by Engineer-in-Charge. [At Ground Floor]. Mural aligned/ CAD Design Type |
| 26 | 1st Floor. |
| 27 | 2nd Floor. |
| 28 | Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick). Ground Floor. |
| 29 | 1st Floor. |
| 30 | 2nd Floor. |
| 31 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor : Two Coats. |
| 32 | 1st Floor. |
| 33 | 2nd Floor. |
| 34 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 35 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On steel or other metal surface : With super gloss (hi-gloss) - Two coats (with any shade except white) |
| 36 | Protective and Decorative Textured exterior high class matt finish paint of approved quality, composed of special Tharmoplastic Resin containing fine crystalline additives derive from Granite as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor. Two Coat. |
| 37 | 1st Floor. |
| 38 | 2nd Floor. |
| 39 | Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work). With carried earth arranged by the contractor within a radius exceeding 5 km. but not exceeding 10 km. including cost of carried earth. |
| 40 | Providing Close Eucalyptus ballah pilling consisting of 150 mm dia ballah of length 4 .5 mtr (3.00 driven & 1.50 mtr Exposed) at 375 mm c/c and provided with three horizantal half splice 100 mm dia ballah runner fixed with nail & bolts etc.and providing 2 .5 mtr long Eucalyptus ties of 2.50mtr centre to centre fixed with tie post1 .5mtr driven 1.20 mtr Below GL including cost of all matetial and two coat of coaltaring of all ballah etc complete as per direction ..(including cost of Providing Filling and Proper Laying the cement bags Average 0.45 m Width ) |
| 41 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Nalhati Variety. |
| 42 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with concrete grade as specified as per Table 1 of IS 15658:2006) manufactured in steel mould clamped to a vibrating table by hydraulic pressure (as per cl. no. 6.30 of IRC SP: 63 (2018). from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, us per CL. No 3.26 of IS: 15658) and of specified size and shape with aspect ratio (The ratio of length to titickness of a paver block, as per CLNo.3.3 of IS: 15658) as per Table 2 of IS:15658 with flexural strength/breaking load as per Annexure G of IS:15658, on the prepared hase course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sund of 25-35 mm thick (grading of the bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks ax per Cl. No. 8.7 of IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction, levelling and filling up of the edge gap. 80 mm thick. Coloured Decorative. |
| 43 | Water Bound Macadam Sub Base. Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm) with moorum screening : |
| 44 | ADD GST |
| 45 | ADD CESS Please Enable Macros to View BoQ information |