| 1 | Ground Floor |
| 2 | Earth work in excavation of foundation inhard soilwithin intial lead of 50m.and 1.5m.intial lift including rough dressing and leveling the bed as directed by the Engineer-in-charge. |
| 3 | Filling in Foundation and plinth with sand well watered and rammed including cost carriage and royality of materials etc. complete as per the direction Engineer-in-charge |
| 4 | Cement Concrete (1:3:6)with 4cm .. Size H.G.C.B metal including cost ,carriage & royalityof materials etc complete as per the direction Engineer-in-charge |
| 5 | Brick masonary work with Fly Ash bricks(23CM*11CM*8CM) size in cement mortar(1:6) F&P including cost , carriage and royality of materials etc. complete as per the direction Engineer-in-charge. |
| 6 | Brick masonary work with Fly Ash bricks(23*CM*11CM*8CM) size in cement mortar(1:6) super structure including cost , carriage and royality of materials etc. complete as per the direction Engineer-in-charge. |
| 7 | GROUND FLOOR |
| 8 | First floor |
| 9 | Second floor |
| 10 | Brick masonary work with Fly Ash bricks(23*CM*11CM*8CM) size in cement mortar(1:4) super structure including cost , carriage and royality of materials etc. complete as per the direction Engineer-in-charge. |
| 11 | RCC work of M20 grade with 20mand down grade black hard granite(Crusher Broken) chips including hosting and laying royality of materials etc. complete as per the direction Engineer-in-charge |
| 12 | A)GROUND FLOOR |
| 13 | B)FIRST FLOOR |
| 14 | C)SECOND FLOOR |
| 15 | Providing M.S. Reinforcement for R.C.C work including cutting ,bending, binding and tying the grills an placing in position including cost of binding wir 18 to 20gauge and cost and carriage of steel .etc. complete. |
| 16 | A)GROUND FLOOR |
| 17 | B)FIRST FLOOR |
| 18 | C)SECOND FLOOR |
| 19 | Rigid smooth centering and shuttering for RCC work including flase work and dismantling them after casting. |
| 20 | GROUND FLOOR |
| 21 | (a).Column base footing |
| 22 | (b) Plinth band |
| 23 | (c).Lintel band |
| 24 | (d) Beam and column |
| 25 | (e).Roof slab , chajja |
| 26 | (f)Stair case |
| 27 | FIRST FLOOR |
| 28 | (a).Lintel band |
| 29 | (b) Beam and column |
| 30 | (c).Roof slab , chajja |
| 31 | (d)Stair case |
| 32 | SECOND FLOOR |
| 33 | (a).Lintel band |
| 34 | (b) Beam and column |
| 35 | (c).Roof slab , chajja |
| 36 | 12 mm thick cement plaster with cement mortar (1:6) over brickwork including including cost carriage & royality of materials etc. complete as per the direction Engineer-in-charge |
| 37 | GROUND FLOOR |
| 38 | FIRST FLOOR |
| 39 | SECOND FLOOR |
| 40 | 16 mm thick cement plaster with cement mortar (1:6) over brickwork including including cost carriage & royality of materials etc. complete as per the direction Engineer-in-charge |
| 41 | GROUND FLOOR |
| 42 | FIRST FLOOR |
| 43 | SECOND FLOOR |
| 44 | 2.5 mm thick A.S Flooring with cement concrete (1:2:4) using 12 mm size C.B . Chips including curing ,cost, carriage ,royality and taxes of all materials, cost of labour,T&P etc complete as per the direction of E.I.C. |
| 45 | GROUND FLOOR |
| 46 | FIRST FLOOR |
| 47 | 12mm thick C.P in C.M (1:4) over brick masonary to the smooth surface with neat cement punning including water curing ,cost ,carriage,royality and taxes of all materials, cost of labour,T&P etc complete as per the direction of E.I.C. |
| 48 | GROUND FLOOR |
| 49 | FIRST FLOOR |
| 50 | Fixing glazzed tiles (30cm*30cm /40cm*40cm special plain /printed series ceramic tiles of premium grade having thickness 7 mm to 8 mm confirmimg to IS13755) in floors treads or steps and landing on 20 mm thick bed of cement mortar 1:4 (1 cement :4 sand) joined with neat cement slurry mixed with pigments to match the shades of the tiles including cost of tiles |
| 51 | GROUND FLOOR |
| 52 | Fixing glazzed tiles (20cm*30cm /20cm*20cm special plain /printed series ceramic wall tile of premium grade having thickness 6.5 mm to 6.7 mm confirmimg to IS13753) in dados skirting and riser of steps on 12 mm thicks cement plaster(1:3) joined with neat cement slurry mixed with pigments to match the shades of the tiles including cost of tiles. |
| 53 | GROUND FLOOR |
| 54 | Cement washing one coat including curing cost of all labours and cost of all materials etc complete as per the direction of Engineering -in charge. |
| 55 | GROUND FLOOR |
| 56 | FIRST FLOOR |
| 57 | SECOND FLOOR |
| 58 | Distempering 2 coats to walls with distemper of approved shade on new work to give an even shade including cost of distemoer and labour ,T&P etc complete |
| 59 | GROUND FLOOR |
| 60 | FIRST FLOOR |
| 61 | SECOND FLOOR |
| 62 | Finishing to the exposed surfaces of wall with weather coat of any approved shade on new work 2 coats to give an even shadeincluding cost of weather coat of all labours and T&P etc. complete. |
| 63 | GROUND FLOOR |
| 64 | FIRST FLOOR |
| 65 | SECOND FLOOR |
| 66 | Supplying of M.S sheet and angel welded doors and windows with all fittings of approved design sizeat worksite including all cost of materials ,loading,unloading ,transporting charges & priming one coat with approved primer etc comlete. |
| 67 | a).Door |
| 68 | b)Window |
| 69 | c)Grills |
| 70 | d)Collapseable gate front Entrance |
| 71 | e)PVC door including fixing in position Door D2 |
| 72 | Priming one coat with any approved primer on iron work including sand papering ,polishing surfaces ,cost of primer ,cost of all labour T&P ,etc complete in all floors as per direction of E.I.C |
| 73 | GROUND FLOOR |
| 74 | FIRST FLOOR |
| 75 | SECOND FLOOR |
| 76 | Painting 2 coat with any approved paint on iron work including sand papering ,polishing surfaces ,cost of primer ,cost of all labour T&P ,etc complete in all floors as per direction of E.I.C |
| 77 | GROUND FLOOR |
| 78 | FIRST FLOOR |
| 79 | SECOND FLOOR |
| 80 | 20 mm thick C.P in C.M (1:4) over concrete surface to the smooth surface including curing cost of carriage royality and taxes of all materials, cost of labour,T&P etc complete as per the direction of E.I.C. |
| 81 | GROUND FLOOR |
| 82 | FIRST FLOOR |
| 83 | Fitting ,fixing of iron doors /windows shutter with frame of approved desig and size with all labour and T&P required for theworketc completeas per direction of the Engineer-in-charge. |
| 84 | Supplying ,fitting fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with balustrade of size (32*32*2 )mm @90 mtcC/C sad stainless aquare pipe bracing of size case as per approved design and specification ,buffing ,polishing etc, with the cost ,conveyance taxes of all material,cost of all labour etc ,complete in all respect(in all floor) Please Enable Macros to View BoQ information |