| 1 | Part - A ( Material)Following Material Supplied by the Contractor:- |
| 2 | Aluminum Lug off size as per requred |
| 3 | Copper L Piece 50x225x10 mm |
| 4 | Stone Pad |
| 5 | Holding Clamp for top Channel TPMO set & fues wire set etc. with bolts and Nuts |
| 6 | LT clamp with Nut & Bolt |
| 7 | Dead end clamp |
| 8 | Bolt &Nut for Shackle Insulator |
| 9 | LT Shackle Insulator |
| 10 | Three Phase Distribution Bax Clamp |
| 11 | Holding Clamp (Different Size) with bolts |
| 12 | Stone Pad 300x300x75 mm |
| 13 | Suspension Clamp |
| 14 | I Hook |
| 15 | Missnary type fuse set (Tailless unit) for 160/250/400/630 KVA suitable Iron Gate, including all Accessories like busbar, Spring Contact, back entry, alu. Crimping lug, brass coupling, copper, L Piece as per Norms. Including labour & GST enclosed type door lock with locks system fully covered. |
| 16 | Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 50 Kms. (distance approx) |
| 17 | S.T. Pole 11 Mtr. long |
| 18 | S.T. Pole 09 Mtr. long |
| 19 | PCC Pole 8.5 Mtr. Long |
| 20 | PCC Pole 09 Mtr. Long |
| 21 | LT XLPE Cable 1x120 sqmm |
| 22 | LT PVC Cable 1x400 sqmm |
| 23 | LT PVC Cable 1x240 sqmm |
| 24 | AB Cable (3x50+1x35+1x16) sqmmq |
| 25 | AB Cable (3x95+1x70+1x16) sqmmq |
| 26 | AB Cable (3x120+1x95+1x16) sqmmq |
| 27 | Three Phase Distribution Box |
| 28 | ACSR Weasel Conductor |
| 29 | ACSR Rabbit Conductor |
| 30 | T/F 63 KVA |
| 31 | T/F 100 KVA |
| 32 | T/F 250 KVA |
| 33 | 11 KV Fuse Set |
| 34 | Other matching Materials |
| 35 | Dragging of ST/PCC Pole from dump site to pit site |
| 36 | Fabrication and Errection of Single Pole Support on ST/PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor) |
| 37 | Fabrication and Errection of Double Pole Support on ST/PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor) |
| 38 | Earthing of Poles as per RESPO Norms |
| 39 | Stringing, Sagging, Binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms |
| 40 | Stringing, Sagging, Binding and jumpering of ACSR Rabbit Conductor as per RESSPO Norms |
| 41 | Stringing, Sagging, Binding and jumpering of AB Cable (3x50+1x35+1x16) sqmmq Conductor as per RESSPO Norms |
| 42 | Stringing, Sagging, Binding and jumpering of AB Cable (3x95+1x70+1x16) sqmmq Conductor as per RESSPO Norms |
| 43 | Stringing, Sagging, Binding and jumpering of AB Cable (3x120+1x95+1x16) sqmmq Conductor as per RESSPO Norms |
| 44 | Erection & Commissioning of of 3 Phase/Single Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms. |
| 45 | Mounting of 63 KVA Transformer as per RESSPO Norms. |
| 46 | Mounting of 100 KVA Transformer as per RESSPO Norms. |
| 47 | Mounting of 250 KVA Transformer as per RESSPO Norms. |
| 48 | Construction of Transformer Plinth size 2x2x1.5 including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms |
| 49 | Fencing of Transformer Plinth Size 3.5x3.5x2 with the help of wire mesh/Barbed wire after grouting proper size of angle as per RESSPO Norms. Inclusive of all material such as Wiremesh/Barbed Wire, Angle Flats, Nut Bolts etc. |
| 50 | Earthing by way of boring and lowering of \\"B\\" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.) |
| 51 | Chemical Earthing |
| 52 | Connection of L.T. XLPE Cable Different Size & Different Places |
| 53 | Concrecting of Pole with Muffing |
| 54 | Installation of 11 KV Fuse Set |
| 55 | Rect. Back old and used 25 KVA T/F |
| 56 | Rect. Back old and used 63 KVA T/F |
| 57 | Rect. Back old and used 100 KVA T/F |
| 58 | Rect Back old and used Materials etc. Including Cable Iron Drum to store. Please Enable Macros to View BoQ information |