| 1 | Dismentaling brick or stone masonary in lime or cement mortar under 3mt.height including stacking the useful materials for reuse and removing the debries within 50mt.lead. etc. complete as per direction of Engineer-in charge. FIRST FLOOR |
| 2 | RCC work of M-25 grade with 20mm and down grade black hard granite (crusher broken) stone chips incuding watering and curing etc. complete as per direction of Engineer-in charge. FIRST FLOORa) Columns |
| 3 | b) Lintel Bend |
| 4 | c) Stair case |
| 5 | d) Chajja |
| 6 | e) Roof Beam |
| 7 | f) Roof Slab |
| 8 | SECOND FLOORa) Columns |
| 9 | b) Roof Beam |
| 10 | c) Roof Slab |
| 11 | Supplying, fitting and placing uncoated HYSD bars reinforcement tying the grills, straighten placing them in position including cost of bindings wire 18 to 20mm gauge including cost of HYSD bar with conveyance and royalty etc. complete and as per technical specification and direction of Engineer-in charge. FIRST FLOOR |
| 12 | SECOND FLOOR |
| 13 | Fly Ash. Brick Masonry in C.M. (1:6) in Superstructure using 23cm x 11cm x 8cm size Fly Ash Brick including watering and curing, cost, conveyance,taxes and royalties and labour require for the work etc complete.FIRST FLOOR |
| 14 | SECOND FLOOR |
| 15 | 12mm thick Cement Plaster in C.M. (1:6) over brick work including watering and curing, cost, conveyance,taxes and royalties and labour with required for the work etc complete.FIRST FLOOR |
| 16 | SECOND FLOOR |
| 17 | 16mm thick Cement Plaster in C.M. (1:6) over brick work including watering and curing, cost, conveyance,taxes and royalties and labour with required for the work etc complete.FIRST FLOOR |
| 18 | SECOND FLOOR |
| 19 | Supplying fitting and fixing of vitrified tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-Charge.FIRST FLOOR |
| 20 | Providing fitting & fixing Vetrified tiles in dados ,skirtings and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including all cost, conveyance,taxes,royalities etc. complete.GROUND FLOOR |
| 21 | FIRST FLOOR |
| 22 | 2.5cm (1”) thick Grading Concrete over roof slab in Cement Concrete (1:2:2) 6mm (1/4”) size Clean hard black crusher broken granite Chips of approved quality from approved quarry including hosting lowering and laying in layers ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete. FIRST FLOOR |
| 23 | SECOND FLOOR |
| 24 | Manufacturing and Supplying of M.S. Doors, windows, grills, vantilotors , collarseble gate and doors frame with pannel shuter made out of structural steel plates and bars conferming to IS spesification as per drawing, design, including with all cost, laour, T&P etc complete as per direction of Engineer-in-charge.FIRST FLOOR |
| 25 | SECOND FLOOR |
| 26 | Labour for fitting and fixing of M.S. Grill, Doors, Windows and ventilator including all cost of labour with T&P require for the work etc complete.FIRST FLOOR |
| 27 | SECOND FLOOR |
| 28 | Supplying , fitting and fixing of two track UPVC Sliding window of approved make with 6mm Thick Glass of approved quality complete with frame shutter and all fitting and fixtures etc complete.FIRST FLOOR AND SECOND FLOOR |
| 29 | Supplying fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @0.90mtr.C/C and stainless square pipe bracing of size 32mmx32mmx2mm in 3 rows in stair case as per approved design and specification buffing,polishing etc with cost. conveyance, taxes of all materials ,T&P etc. required for the complete as per direction of Engineer in Charge.GROUND FLOOR AND FIRST FLOOR |
| 30 | Weathering two coat with any approved Weather coat on new work after scraping and cleaning the surface over one coat of water bound wall primer including watering and curring all cost of materials, scaffolding, labour with T&P etc. complete as per direction of Engineer-in-charge.GROUND FLOOR |
| 31 | FIRST FLOOR |
| 32 | SECOND FLOOR |
| 33 | Finishing surface of walls with Cement based Wall Putty (Water Based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes labour T&P required for the work etc. complete.GROUND FLOOR |
| 34 | FIRST FLOOR |
| 35 | SECOND FLOOR |
| 36 | Providing & Painting with two coats to the entire inside surface with Plastic Emulsion Paint of any approved make to the outer surface after scraping and cleaning the surface over Water Bound Cement Primer including all cost of materials, scaffolding, labour T&P etc complete as per direction of Engineer-in-charge.GROUND FLOOR |
| 37 | FIRST FLOOR |
| 38 | SECOND FLOOR |
| 39 | Painting Two coats (Enamel Paint) with any approved shade on new/Old Doors and windows including all cost, conveyance,tax of materials and labour with T&P required for the work etc complete.GROUND FLOOR |
| 40 | FIRST FLOOR |
| 41 | SECOND FLOOR |
| 42 | Display Board Please Enable Macros to View BoQ information |