| 1 | Earth work in excavation of foundation in all kinds of soil in foundation within 50M initially lead and 1.50M initially lifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.03Mtr in depth & levelling bed etc complete as directed by the Engineer-in-Charges. |
| 2 | Filling foundation and plinth with sand including watering and ramming including cost, conveyance and royality and taxes of all materials and labour with T&P required for the work etc. complete as per specification and direction of Engineer-in-Charge. |
| 3 | Cement concrete in (1:4:8) using 40mm size Hard Granite Crusher Broken metal including watering and curing,cost,conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete and as per specification and direction of Engineer in Charge. |
| 4 | Fly Ash. Brick Masonry in C.M. (1:6) in Foundation using 23cm x 11cm x 8cm size Fly Ash Brick including watering and curing, cost, conveyance,taxes and royalties and labour require for the work etc complete. |
| 5 | RCC work of M-25 grade with 20mm and down grade black hard granite (crusher broken) stone chips incuding watering and curing etc. complete as per direction of Engineer-in charge. GROUND FLOORa) Columns Footing |
| 6 | b) Plinth Beam |
| 7 | c) Columns |
| 8 | d) Lintel Bend |
| 9 | e) Stair case |
| 10 | f) Chajja |
| 11 | g) Roof Slab |
| 12 | h) Roof Beam |
| 13 | FIRST FLOORFIRST FLOORa) Columns |
| 14 | Supplying, fitting and placing uncoated HYSD bars reinforcement tying the grills, straighten placing them in position including cost of bindings wire 18 to 20mm gauge including cost of HYSD bar with conveyance and royalty etc. complete and as per technical specification and direction of Engineer-in charge. GROUND FLOOR |
| 15 | FIRST FLOOR |
| 16 | Fly Ash. Brick Masonry in C.M. (1:6) in Superstructure using 23cm x 11cm x 8cm size Fly Ash Brick including watering and curing, cost, conveyance,taxes and royalties and labour require for the work etc complete.GROUND FLOOR |
| 17 | FIRST FLOOR |
| 18 | 12mm thick Cement Plaster in C.M. (1:6) over brick work including watering and curing, cost, conveyance,taxes and royalties and labour with required for the work etc complete.GROUND FLOOR |
| 19 | FIRST FLOOR |
| 20 | 16mm thick Cement Plaster in C.M. (1:6) over brick work including watering and curing, cost, conveyance,taxes and royalties and labour with required for the work etc complete.GROUND FLOOR |
| 21 | FIRST FLOOR |
| 22 | Supplying fitting and fixing of vitrified tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-Charge.GROUND FLOOR |
| 23 | Providing fitting & fixing Vetrified tiles in dados ,skirtings and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including all cost, conveyance,taxes,royalities etc. complete.GROUND FLOOR |
| 24 | Manufacturing and Supplying of M.S. Doors, windows, grills, vantilotors , collarseble gate and doors frame with pannel shuter made out of structural steel plates and bars conferming to IS spesification as per drawing, design, including with all cost, laour, T&P etc complete as per direction of Engineer-in-charge.GROUND FLOOR |
| 25 | FIRST FLOOR |
| 26 | Labour for fitting and fixing of M.S. Grill, Doors, Windows and ventilator including all cost of labour with T&P require for the work etc complete.GROUND FLOOR |
| 27 | FIRST FLOOR |
| 28 | Supplying , fitting and fixing of two track UPVC Sliding window of approved make with 6mm Thick Glass of approved quality complete with frame shutter and all fitting and fixtures etc complete.GROUND FLOOR |
| 29 | Weathering two coat with any approved Weather coat on new work after scraping and cleaning the surface over one coat of water bound wall primer including watering and curring all cost of materials, scaffolding, labour with T&P etc. complete as per direction of Engineer-in-charge.GROUND FLOOR |
| 30 | FIRST FLOOR |
| 31 | Finishing surface of walls with Cement based Wall Putty (Water Based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes labour T&P required for the work etc. complete.GROUND FLOOR |
| 32 | FIRST FLOOR |
| 33 | Providing & Painting with two coats to the entire inside surface with Plastic Emulsion Paint of any approved make to the outer surface after scraping and cleaning the surface over Water Bound Cement Primer including all cost of materials, scaffolding, labour T&P etc complete as per direction of Engineer-in-charge.GROUND FLOOR |
| 34 | FIRST FLOOR |
| 35 | Painting Two coats (Enamel Paint) with any approved shade on new/Old Doors and windows including all cost, conveyance,tax of materials and labour with T&P required for the work etc complete.GROUND FLOOR |
| 36 | FIRST FLOOR |
| 37 | Display Board Please Enable Macros to View BoQ information |