| 1 | Earth work in excavation of foundation in hard soil within initial lead and lift including rough dressing and breaking clods etc., complete |
| 2 | Sand filling in foundation and plinth with well watered and rammed etc., complete |
| 3 | Cement concrete in cm (1:3:6) using 4cm size H.G. metal with all cost, conveyance etc., complete |
| 4 | Reiforcement cement concrete M-20 grade with 20mm bominal size down graded nominal size aggregate mechanical mixed and Vibrated in foundation and bend protection of specification for road and Bridge works and direction of the Engineer-in-Charge. |
| 5 | Column Base |
| 6 | Column Plinth Band |
| 7 | Column in Super Structure (Gr. Floor) |
| 8 | All Kind of Beam |
| 9 | Lintel (Gr. Floor) |
| 10 | Chajja (Gr. Floor) |
| 11 | Roof Slab (Gr. Floor) |
| 12 | Stair (Gr. Floor) |
| 13 | Providing HYSD Bar reinforcement for R.C.C work inclduing straighting, cutting, binding, welding, tying the grills, laying and placeing the proper position as per approved design and drawing including cost, conveyance of 18 to 20 gauge binding |
| 14 | Fly Ash brick masonry in cm (1:6) for super structure in foundation and plinth with all cost, carriage, Royalty etc., complete |
| 15 | (A) Foundation and Plith |
| 16 | (B) Super Structure |
| 17 | 6mm thick C.P. in cm (1:4) over Concrete work with all cost, carriage, Royalty etc., complete |
| 18 | 12mm thick C.P. in cm (1:6) over Brick work with all cost, carriage, Royalty etc., complete |
| 19 | 16mm thick C.P. in cm (1:6) over Brick work with all cost, carriage, Royalty etc., complete |
| 20 | Fitting, fixing of MS Door & Window including all cost etc., complete |
| 21 | Supplying, fitting & fixing of 10mm thick & size 600x600 mm Vitrified floor tiles with water absorption limit between 0.08% to 3% and conforming to IS:15622:2006 (Group B Ib). Laid on 20mm thick cement mortar (1:4) (1cement : 4 course sand) jointed with slurry mixed with pigment to match the shades of the tiles etc., complete including cost of all materials, labour T&P etc., required for the work all complete as per direction of the Engineer-in-Charge. |
| 22 | Supplying, fitting & fixing of 10mm thick & size 600x600 mm Vitrified Dado tiles with water absorption limit between 0.08% to 3% and conforming to IS:15622:2006 (Group B Ib). Laid on 12mm thick cement mortar (1:3) (1cement : 3 course sand) jointed with slurry mixed with pigment to match the shades of the tiles etc., complete including cost of all materials, labour T&P etc., required for the work all complete as per direction of the Engineer-in-Charge. |
| 23 | Supplying, fitting and fixing of Ceramic Floor tiles (30 x 30, 40 x 40) with water absorption limit between 0.08% to 3% and conforming to IS : 15622:2006 (Group B lb). Laid on 20mm thick cement mortar (1:4) (1 cement :4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc., required for the work all complete as per direction of the Engineer-in-charge (for new work only) |
| 24 | Supplying, fitting & fixing of Ceramic wall tiles of having thickness 6.5mm to 6.7mm confirming to IS 13753 in dadoes, skirting and risers of s teps laid on 12mm thick cement mortar (1:3) (1cement: 3 course sand) jointed with slurry mixed with pigment to match the shades of the tiles etc., complete including cost of all materials, labour T&P etc required for the work all complete as per direction of the Engineer-in-charge |
| 25 | Supplying, fitting & fixing of Industrial vitrified tiles (30x30)cm in Floors of approved make laid on 20mm thick cement mortar (1:4) (1 cemenet : 4 course sand) and filling joints with slurry inclduing cost of all materials, labour T&P etc., required for the workall complete as per direction of the Enginee-in-charge. |
| 26 | Supplying, fitting & fixing of Industrial vitrified tiles (30x30)cm in Dadoes of approved make laid on 12mm thick cement mortar (1:3) (1 cemenet : 3 course sand) and filling joints with slurry inclduing cost of all materials, labour T&P etc., required for |
| 27 | Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to received painting including cost of sca ffolding staging charges with cost of all materials labour T&P etc as per directiono f Engineer-in-charge in Ground Floor |
| 28 | Distempering 2 coats with distemper with approved shade including cost of distemper over coat of primer |
| 29 | Providing weather coat (two coats) to puter surface of the structure or as per direction of the Engineer-in-charge. |
| 30 | Painting 2 coats with synthetic enamal paint on new wood work or steel work |
| 31 | Supplying fitting and fixing of stainless stell of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90 mtrs C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc eith cost, conveyance, taxes of all materials, labour and T&P required for the work all complete in all respect |
| 32 | Sign Board and Photography Please Enable Macros to View BoQ information |