| 1 | Dismantling or Removing 2.5cm (1'') thick Grading concrete from roof slab, cleaning the surface, loweering and removing the debris withing 50m initiallly lead including all cost of labour with T&P required for the work etc complete. (Data for 9.3 sqm).including all cost of labour with T&P required for the work etc comlete |
| 2 | Dismantling or Removing old lime or cement plaster from wall including eacking out the joint 12mm deep and removing the debris withing 50m initiallly lead including all cost of labour with T&P required for the work etc comlete. |
| 3 | Dismantling or Removing 2.5cm (1'') thick A.S Flooring including stacking useful materials for reuse and removing the debris withing 50m initiallly lead including all cost of labour with T&P required for the work etc comlete. |
| 4 | Cement concrete in (1:4:8) using 40mm size Hard Granite Crocer Broken including watering and curing,cost,conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete and as per specification and direction of Engineer in Charge. |
| 5 | 16mm thick Cement Plaster in C.M. (1:6) over brick work including watering and curing, cost, conveyance,taxes and royalties and labour with required for the work etc complete.GROUND FLOOR |
| 6 | FIRST FLOOR |
| 7 | 12mm thick Cement Plaster in C.M. (1:6) over brick work including watering and curing, cost, conveyance,taxes and royalties and labour with required for the work etc complete.GROUND FLOOR |
| 8 | FIRST FLOOR |
| 9 | 6mm (1/4”) thick Cement Plaster in C.M. (1:4) finished smooth to RCC Surface including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.GROUND FLOOR |
| 10 | FIRST FLOOR |
| 11 | Supplying fitting and fixing in Position Steel cutting edge as per approved design using M.S. Angle ,plates bolts and nuts complete including cutting angles to required size ,bending to shape ,drilling holes ,reverting and welding etc. complete in all respect. including all cost of labour with T&P required for the work etc comlete.GROUND FLOOR |
| 12 | FIRST FLOOR |
| 13 | Labour Charges for fitting and fixing of M.S. Door, Window, Grill Gate and Grills including all cost of Labour with T&P required for the work etc complete.GROUND FLOOR |
| 14 | FIRST FLOOR |
| 15 | 2.5cm (1'') thick Grading concrete from roof slab, cleaning the surface, loweering and removing the debris withing 50m initiallly lead including all cost of labour with T&P required for the work etc comlete. (Data for 9.3 sqm).including all cost of labour with T&P required for the work etc comlete.FIRST FLOOR |
| 16 | Supplying fitting and fixing of vitrified tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-Charge.GROUND FLOOR |
| 17 | FIRST FLOOR |
| 18 | Supplying fitting and fixing of vitrified industrial tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-Charge.GROUND FLOOR |
| 19 | FIRST FLOOR |
| 20 | Providing & fixing of Floor Tiles in floors treads or steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigments to match the shade including rubbing and polishing as per the design & drawing with cost of all materials, labour, conveyance, taxes , T&P etc. complete as per the direction of Engineering -in-charge. GROUND FLOOR |
| 21 | FIRST FLOOR |
| 22 | Finishing surface of walls with Cement based Wall Putty (Water Based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes labour T&P required for the work etc. complete.GROUND FLOOR |
| 23 | FIRST FLOOR |
| 24 | Wall painting two coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint.including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge.GROUND FLOOR |
| 25 | FIRST FLOOR |
| 26 | Providing & Painting with Priming 1 coat with Water Bound Cement Primer over plaster surface of any approved make to the outer surface after scraping and cleaning the surface including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge.GROUND FLOOR |
| 27 | FIRST FLOOR |
| 28 | Providing & Painting with two coats to the entire outside surface with Weather Coat of any approved make to the outer surface after scraping and cleaning the surface over one coat of Water Bound Wall Primer including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge.GROUND FLOOR |
| 29 | FIRST FLOOR |
| 30 | Painting Two Coats (Enamel Paint) with any approved shade on New Wooden Door and windows over a coat of Primer Paint including all cost, conveyance, tax of materials and labour with T&P required for the work etc complete.GROUND FLOOR |
| 31 | FIRST FLOOR |
| 32 | Display Board Please Enable Macros to View BoQ information |