| 1 | Additional rate for providing one disc set, PG clamp etc. complete, on anytype of HT pole for making cut point. |
| 2 | Providing Cable Tie |
| 3 | Doing one cable end termination on HT ABC of sizes Up to3x150+1x120 sqmm |
| 4 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete. |
| 5 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete. |
| 6 | Additional rate for refitting/redoing one Shackle Set, including reshaclingone span, while renewing any type of LT pole. |
| 7 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 8 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole including conveyance of materials. |
| 9 | Fitting and providing one Strut using HT PSC pole including digging andback filling pit in ordinary soil. |
| 10 | Fitting one No. Section fuse on LT line with dropping cables, crimpingsockets, connecting with bolt & nut etc. |
| 11 | Disconnecting and lowering down the single phase WP serviceconnection with guy wire from the OH line and reconnecting the sameafter completing the line work. |
| 12 | Disconnecting and lowering down the three phase WP service connectionwith guy wire from the OH line and reconnecting the same aftercompleting the line work. |
| 13 | Dismantling of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16(Street Light) + 1 x 50 Sq.mm. (Insulated Messenger) |
| 14 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messenger through existing poles |
| 15 | Fitting and providing one HT Stay for 11kV pole, including digging andback filling pit in ordinary soil. |
| 16 | Providing Strut using LT PSC pole including digging and back filling pitin ordinary soil.is 150. |
| 17 | Renewal of existing damaged/old 11kV Stay with new stay in placeincluding excavation & backfilling of pit, dismantling, refitting of allitems and conveyance of all materials. |
| 18 | Renewal of existing damaged/broken old 11kV Stay to the existing stayrod. |
| 19 | Dismantling (without damage) one HT PSC/RCC Strut pole includingremoval of clamps and stacking. |
| 20 | Dismantling (without damage) one 11kV PSC/RCC pole afterdisconnecting stays, strut etc. attached thereon and stacking the same. |
| 21 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 numbers of poles excluding loading& unloading charges. |
| 22 | Providing spiral earthing |
| 23 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 24 | Fitting and erecting one HT A type Single Pole in position, includingfitting cross arm, digging and back filling pit in ordinary soil (as perstandards), drawing sufficient length of GI earthing leads from F clampthrough V cross arm to the ground for earthing (excluding provision of earthing). |
| 25 | Labour charges for loading HT A type pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 26 | Fitting one set (3No.) 11kV LA and giving connections excludingearthing |
| 27 | Dismantling (without damage) one HT stay including digging pit in allclasses of soil and backfilling, and bringing back to section store. |
| 28 | Straightening one slanted 11kV pole after unbinding the line and bindingthe line after work. |
| 29 | Doing straight joint of 3x300 mm2 11KV XLPE cable very carefullyobserving directions of manufactures and departmental staff includingcrimping of socket (cost index(e) : 1 included in Rate) |
| 30 | Insertion of one HT PSC pole in existing OH line including digging &backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc.,drawing sufficient length of GI earth leads to the ground for earthing(excluding provision of earthing). |
| 31 | Labour charges for loading HT PSC pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 32 | Dismantling (without damage) one km 11kV line (three conductors)including dismantling cross arm, insulators, disc, disconnecting jumperconnection, rolling the conductor and stacking the materials. |
| 33 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSRRaccoon or equivalant (3 conductors) after fitting insulators, bindingconductors to pin insulators using suitable tie and anchoring with wedgetype anchoring clamps including cutting and removing tree brancheswherever necessary excluding cut point works. |
| 34 | Conveyance of one km 11kV line materials from section store/stackingplace to the work site (excluding poles) Please Enable Macros to View BoQ information |