| 1 | Earthwork in filling in MKR and kankar mixed soil in embankment including all lead & lift with proper making of section and dressing with mechanical compaction ,all labour and T&P with proper completion of work as per direction of engineer in charge. |
| 2 | Earthwork in Excavation of foundation in all type strata such as M.K.R soil, labour , Tool and Plants including disposal of material for proper completion of work as per dirction of Enginner in Charge . |
| 3 | Providing and fixing steel reinforcement for R.C.C. work including cutting, bending, placing and binding with G.I. wire including its cost etc. as per direction of Engineer-in-charge. |
| 4 | Providing and Laying C.C. 1:2:4 (M15) including mixing, placing of concrete, mechanical vibration and curing with cost of all material, labour, Tool & Plant etc. as per direction of Engineer-in-charge. |
| 5 | Providing and Laying in R.C.C. 1:1.5:3 (M20) including mixing by Batching plant, placing of concrete, mechanical vibration and curing with cost of all material, labour, Tool & Plant etc. as per direction of Engineer-in-charge. |
| 6 | CR masonry in 1:4 with cement mortar with cost of all material, labour, Tool & Plant etc. as per direction of Engineer-in-charge. |
| 7 | Brick masonry in 1:4 with cement mortar with cost of all material, labour, Tool & Plant etc. as per direction of Engineer-in-charge. |
| 8 | Cement plaster on brick work face in 1:4 with cement mortar with cost of all material, labour, Tool & Plant etc. as per direction of Engineer-in-charge. |
| 9 | Supplying and fixing steel railing i/c cost of all material,labour ,T&P and taxes. |
| 10 | Laying of coarse sand in filter material in layers including cost of all material ,labour etc complete work. |
| 11 | Laying of stone grit 10 mm-19 mm size in filter material in layers including cost of all material ,labour etc complete work. |
| 12 | Laying of boulder pitching size 25-60kg on D/S toe of the dam including cost of all material ,labour etc complete work. |
| 13 | Laying of boulder pitching size 40-60kg on U/S rip rap of the dam including cost of all material ,labour etc complete work. |
| 14 | Removing & relaying of Rip-Rap i/c all lead & lift ,labour etc complete work. |
| 15 | Painting of gates,drum and shed ( 3- coat std painting) including cost of labour and material etc complete as per direction of Engineer-in-charge. |
| 16 | Jungle Clearance cutting heavy under growth and bushes up to 7.5 cm dia including removal of roots with collection and removal. |
| 17 | Centering & shuttering for RCC work including all material and T&P etc |
| 18 | Dewatering in sump well and energy dissipating arrangement |
| 19 | 15W Semi integrated light 12.8v/15ah lipo 4 battery 50W solar panel 6 M GI Pole with 5 year warranty. |
| 20 | 11 mtr high mast pole with ringh and foundation bolts 30 watt ac street light Please Enable Macros to View BoQ information |