| 1 | Part - A ( Material)Following Material Supplied by the Contractor:- |
| 2 | X-ARM HOLDING CLAMP |
| 3 | F- Clamp |
| 4 | L T Clamp 308 |
| 5 | Shakel Insulator 53 |
| 6 | Nut & Bolt 220 |
| 7 | Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 80 Kms. (distance approx) |
| 8 | S.T. Pole 11 Mtr. long |
| 9 | PCC Pole 8.5 Mtr. Long |
| 10 | 11 KV XLPE Cable 3x185 sqmm |
| 11 | 11 kV Outdoor Cable Jointing kit 3x185 sqmm |
| 12 | 11 kV Indoor Cable Jointing kit 3x185 sqmm |
| 13 | 11 kV VCB for O/G CTR 200/100/5A 350 MVA (1250 Amp.) |
| 14 | ACSR Weasel Conductor |
| 15 | ACSR Rabbit Conductor |
| 16 | ACSR Panther Conductor |
| 17 | 33 KV CT 400/200/1-1-1A |
| 18 | 33 KV Lighting Arrestor |
| 19 | 33 KV Control Panel for Single Transformer |
| 20 | 33KV Disc Insulator with fitting |
| 21 | 33 KV Pin Insulator with Pin |
| 22 | 11 KV X-Arm V type |
| 23 | 11 KV Pin insulator with Pin |
| 24 | 11 KV Disc with fitting |
| 25 | 33 KV PT outdoor (33 KV/110V) |
| 26 | Line Isolator 800A, 33 KV |
| 27 | Bus Isolator 800A, 33 KV |
| 28 | Other matching Materials |
| 29 | Dragging of ST/PCC Pole from dump site to pit site |
| 30 | Fabrication and Errection of Single Pole Support on ST/PCC Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor) |
| 31 | Fabrication and Errection of Double Pole Support on ST/PCC Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor) |
| 32 | Stringing, Sagging, Binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms |
| 33 | Stringing, Sagging, Binding and jumpering of ACSR Panther Conductor as per RESSPO Norms |
| 34 | Stringing, Sagging, Binding and jumpering of ACSR Rabbit Conductor as per RESSPO Norms |
| 35 | Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms |
| 36 | Earthing of Pole as per RESSPO Norms |
| 37 | Switchyard Barbed wire fencing with gate |
| 38 | Sub-Station Barbed wire fencing with gate. |
| 39 | Structure for line isolator (All Material is Provided by Contractor) |
| 40 | Installation of CT OD 33 KV CTR 200/100/1-1A |
| 41 | Installation of Lightening ArrestorsAssembling and installation/ mounting of Lightening Arrestors on the L.A. structure/ complete with making earth connection ( Separate ) and line connections. The work includes fabrication for proper fixing if required. |
| 42 | Installation of 33 KV Control Panel for Single Transformer |
| 43 | Installation of PT OD 33 KV PTR 33 KV /110 V |
| 44 | Installation of Line Isolator 800A, 33 KV |
| 45 | Installation of Bus Isolator 800A, 33 KV |
| 46 | Installation of 11 kV VCB for O/G CTR 200/100/5A 350 MVA (1250 Amp.) |
| 47 | Laying of underground 11 KV 3x185 sq mm by trunch XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 500 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable) |
| 48 | Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x185/3x120 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 49 | Installation of Heat Shrinkable Type cable jointing kits Indoor end Termination suitable for 11 KV XLPE cable 3x185/3x120 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 50 | Rect Back old and used ACSR Weasel Conductor |
| 51 | Rect Back old and used Materials etc. Including Cable Iron Drum to store. Please Enable Macros to View BoQ information |